| 2025-07-01 | Unsafe Condition | Equipment | Pumps rotation were found reversed. (Skid Pump, Circulation motor, Foam Filling Pump, Boundary Wall Pump) | Foam Skid Pump | Foam Skid Pump | Rotary | PRL | | Routine | | Kemari Terminal | team | Closed | | 2025-07-02 |
| 2025-07-01 | Unsafe Act | PPE | At tank #05, a worker was observed carrying out excavation work without wearing face mask and gloves. Informed the site supervisor. | Tank Farm | Tank#05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-02 |
| 2025-07-01 | Unsafe Act | Procedure | During round at tank #56 (KT), a fitter was observed changing a grander disk without unplugging the grander. | Tank Farm | Tank#56 | Civil | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2025-07-02 |
| 2025-07-01 | Unsafe Act | PPE | At tank #56 (KT), civil Foreman Mr. Tanveer was observed not using the safety goggles within the tank foundation. | Tank Farm | Tank#56 | Civil | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2025-07-02 |
| 2025-07-01 | Unsafe Act | Procedure | At tank #13, a worker was observed shifting materials while using the stairs. As both of his hands were occupied, he failed to maintain three points of contact. The worker was counseled. | Tank Farm | Tank#13 | Civil | CONTRACTOR | WMS | Routine | | Korangi Refinery | team | Closed | | 2025-07-02 |
| 2025-07-03 | Unsafe Act | Procedure | At tank #13, a worker was observed holding the rope of the suspended platform from ground level instead of securing it to a fixed point. The worker was counseled. | Tank Farm | Tank#13 | Civil | CONTRACTOR | WMS | Routine | | Korangi Refinery | team | Closed | | 2025-07-04 |
| 2025-07-03 | Unsafe Condition | Lack of Supervision | At tank #11, a damaged rope was being used for lifting activity. Informed the site supervisor. | Tank Farm | Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-04 |
| 2025-07-03 | Unsafe Act | Work at Height | At tank #11, a worker was observed using a hammer at height with a damaged tool tie. The worker was counseled. | Tank Farm | Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-04 |
| 2025-07-03 | Unsafe Act | Work at Height | At tank #11, a worker was observed using a hammer at height without fastening it with a tool tie. The worker was counseled. | Tank Farm | Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-04 |
| 2025-07-11 | Unsafe Condition | Electrical | At tank #11, the main electrical supply line was observed exposed. Informed the site supervisor. | Tank Farm | Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-12 |
| 2025-07-11 | Unsafe Condition | Lack of Supervision | At tank #05, an energized fresh air compressor was observed on site which was not in use. Informed to the site supervisor. | Tank Farm | Tank#05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-12 |
| 2025-07-10 | Unsafe Condition | Environment | At tank #05, seepage was observed form the engine side of the air compressor. Informed the site supervisor. | Tank Farm | Tank#05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-11 |
| 2025-07-10 | Unsafe Condition | Lack of Supervision | At tank #05, air compressor that was being used for sandblasting activity, its hose was not tied with a whip. Informed the site supervisor. | Tank Farm | Tank#05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-11 |
| 2025-07-10 | Unsafe Condition | Health | Inside tank #11, loose material (channels and wedges) was observed on scaffolding platform. Informed the site supervisor. | Tank Farm | Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-11 |
| 2025-07-10 | Unsafe Act | PPE | At tank #05, 3 ATL staff members were observed climbing the monkey ladder without wearing gloves and chin strap. Counseling was done. | Tank Farm | Tank#05 , 03 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-11 |
| 2025-07-10 | Unsafe Act | PPE | At tank #05, multiple workers were observed performing vacuum test with folded sleeves and were not wearing rubber gloves. Workers were counseled. | Tank Farm | Tank#05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-11 |
| 2025-07-08 | Unsafe Condition | Procedure | Foam skid pump water discharge line spot damage needs replacement. | Foam Skid Pump | Foam Skid Pump | Civil | PRL | | Routine | | Korangi Refinery | team | Closed | | 2025-07-09 |
| 2025-07-08 | Unsafe Condition | Procedure | Jetty line 4’’ butterfly valve not proper working. (Valve was later changed) | Tank Farm | Jetty line | Stationary | PRL | | Routine | | Kemari Terminal | team | Closed | | 2025-07-11 |
| 2025-07-07 | Unsafe Act | PPE | At Fire water pump house, M/s RE worker was observed operating a grinder without wearing earplugs, worker was counseled. | Fire Water Pump House | Fire Water Pump House | Stationary | CONTRACTOR | RE | Routine | | Korangi Refinery | team | Closed | | 2025-07-08 |
| 2025-07-07 | Unsafe Act | Equipment | At Fire water pump house, an energized grinder was found unattended at site, informed the site supervisor. | Fire Water Pump House | Fire Water Pump House | Stationary | CONTRACTOR | RE | Routine | | Korangi Refinery | team | Closed | | 2025-07-09 |
| 2025-07-07 | Unsafe Act | PPE | At Fire water pump house, 3 M/s RE riggers were observed shifting a 12-inch pipeline during installation of pump, wearing normal gloves instead of rigging impact gloves. The site supervisor was informed. | Fire water pump house | Fire Water Pump House | Stationary | CONTRACTOR | RE | Routine | | Korangi Refinery | team | Closed | | 2025-07-08 |
| 2025-07-07 | Unsafe Act | PPE | At road #12, a worker was observed using a hammer without wearing the safety gloves, the worker was counseled. | Road# 12 | Road# 12 | Civil | CONTRACTOR | WMS | Routine | | Korangi Refinery | team | Closed | | 2025-07-08 |
| 2025-07-19 | Unsafe Act | PPE | At API separator, three M/s Q.K Builders workers were performing sand backfilling activity without wearing safety goggles, safety gloves, and face masks. Informed to site supervisor and counseling done. | API Separator | API Separator | Civil | CONTRACTOR | QK Builders | Routine | | Korangi Refinery | team | Closed | | 2025-07-20 |
| 2025-07-19 | Unsafe Act | Work at Height | At 105C8, two M/s WMS workers were working at height without wearing chinstraps. Counseling was done. | Plant Area | 105C8 | Stationary | CONTRACTOR | WMS | Routine | | Korangi Refinery | team | Closed | | 2025-07-19 |
| 2025-07-19 | Unsafe Act | PPE | At WWTP pit, four M/s Afzal Contractor workers were carrying out stonework inside a 10-ft deep pit without wearing gloves and without proper ladder access. Informed to Mr. Afzal Chaudhry and WMS representative. | WWTP | WWTP Pit | Civil | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2025-07-20 |
| 2025-07-18 | Unsafe Condition | Lack of Supervision | At tank #5, the lifting rope was becoming loose. Site supervisor was informed and instructions to replace the rope were given. | Tank Farm | Tank# 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-19 |
| 2025-07-18 | Unsafe Condition | Work at Height | At road no#3 (ISOM), scaffolding material was lying in the ISOM are without any barricading. Informed to site supervisor (M/s AKS Brothers). | Tank Farm | Road #3 | Civil | CONTRACTOR | AKS | Routine | | Korangi Refinery | team | Closed | | 2025-07-19 |
| 2025-07-18 | Unsafe Condition | PPE | At tank #56, an electrical D.B receptacle got overheated and melted due to adjoining of internal wires. The observation was spotted by Stationary Mr. Furrukh and reported by Wasif Ali Fireman. The matter was immediately investigated by PRL electrical team, fire and stationary safety personnel and sorted out the same. | Tank Farm | Tank# 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2025-07-19 |
| 2025-07-17 | Unsafe Act | PPE | During the diesel fuel filling activity at excavator at around 15:00 hrs, the operator switched on the ignition and operated the Excavator without completing the filling job. PRL Safety personnel at site immediately stopped the operator and a counseling was done. | Tank Farm | At Excavator | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2025-07-18 |
| 2025-07-17 | Unsafe Act | PPE | During civil work on foundation, at tank #56, workers were observed without safety goggles. | Tank Farm | Tank# 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2025-07-18 |
| 2025-07-17 | Unsafe Act | Procedure | During Gas Cutting activity, at tank #56, the fitter helper was observed without face shield. | Tank Farm | Tank# 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2025-07-18 |
| 2025-07-25 | Unsafe Act | Vehicle | During the safety round at Tank #11, it was observed that an iron beam was loaded onto a Shehroz truck, but it was extending beyond the truck’s body, posing a risk of striking objects or causing accidents while in transit. This is for your information and necessary corrective actions. | Tank Farm | Tank# 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-26 |
| 2025-07-25 | Unsafe Act | Housekeeping | At storm pit, M/s RE workers were carrying the hot work activity inside the crane barricaded area with the canopy for hot work placed within the barricade. Counseling was provided. | Storm Pit | Storm Pit | Stationary | CONTRACTOR | RE | Routine | | Korangi Refinery | team | Closed | | 2025-07-26 |
| 2025-07-25 | Unsafe Condition | Falling Object | At tank #11, a hammer with a damaged tool tie was observed. Informed to the HSEQ and site supervisor. | Tank Farm | Tank# 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-26 |
| 2025-07-25 | Unsafe Condition | Environment | At tank #5, during sandblasting activity, oil leakage was observed from the engine side of the air compressor (M/s ATL). Informed to HSEQ supervisor. | Tank Farm | Tank# 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-26 |
| 2025-07-25 | Unsafe Condition | Lack of Supervision | At tank #5, during inspection prior to the crane lifting operation, leakage and dripping from crane was observed. Activity has been put on hold and informed to rigging supervisor. | Tank Farm | Tank# 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-25 |
| 2025-09-01 | Unsafe Condition | Environment | At back side of HSEQ caravan, filled garbage bags needs to be removed. | HSEQ caravan | HSEQ caravan | A&S | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Condition | Environment | At access to furnace area, near road 10 and around WBL. leftover scaffolding materials need to be removed. Informed to Civil department | Plant Area | Furnace area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Act | PPE | At road # 14, activity was about to start on the furnace oil line of Tank #1 under the permit issued for Tank #2. The fireman stopped the work and instructed the team to obtain a separate permit for this job, as it was not covered under the existing permit. | Road # 14 | Road # 14 | Stationary | CONTRACTOR | RE | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Act | PPE | At 201-DN, during flange tightening work, WMS workers were hammering without wearing safety gloves. The supervisor was informed | At 201-DN | At 201-DN | Stationary | CONTRACTOR | WMS | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Condition | Work at Height | Scaffolding materials were present at the back side of the control room without any barricading. | Plant Area | Backside of Control Room | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Act | Line of Fire | During crane operations at the Descon yard, two storekeepers were observed crossing the barricaded line of fire. The incident was reported to the Descon HSE supervisor, and counseling was conducted. | DEL Yard | DEL Yard | Construction | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Act | Vehicle | At road # 10, the forklift operator was heading toward the DEL yard with material loaded on the forks, but he had no visibility ahead. | Road # 10 | Road # 10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Condition | Work at Height | At below area of main stack, access to furnace area, near control room, WBL & below area of AFC. leftover scaffolding materials need to be removed. Informed to Civil department. | Plant Area | BelowAarea of Main Stack | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Condition | Lack of Supervision | At road #10 and near Stationary caravan, mixed waste (hazardous and non- hazardous) was found, informed to M/s HSE supervisor. | Road# 10 | Road# 10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Condition | Lack of Supervision | At road #10 and near Stationary caravan, mixed waste (hazardous and non- hazardous) was found, informed to M/s HSE supervisor. | Road# 10 | Road# 10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-09-01 | Unsafe Act | PPE | At Road #14, during de-spading work, workers of M/s RE were found working in the dark without wearing safety goggles and stud bolts were placed on the road. The team was counseled at site and instructed to arrange proper lighting. | Road #14 | Road #14 | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-02 |
| 2025-09-01 | Unsafe Act | PPE | At below area of 105-Cs, safety helmet was found on HP streamline. Informed to stationary supervisor for removal. | Plant Area | Below Area of 105-Cs | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Condition | Lack of Supervision | At desalter area. Unattended pressurized gas cylinder was found on walkway. informed to M/s HSE supervisor. | Plant Area | Desalter Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-31 |
| 2025-08-30 | Unsafe Condition | Lack of Supervision | At road #10 and Stationary caravan, mixed waste (hazardous and non- hazardous) was found, informed to M/s HSE supervisor. | Road #10 | Road #10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-31 |
| 2025-08-30 | Unsafe Condition | Work at Height | At below area of 103-B, near control room & at AFC platform, leftover scaffolding materials need to be removed. Informed to Civil department. | Plant Area | Below Area of 103-B | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Act | PPE | At DEL yard, during crane operation worker was found crossing the barricaded area and crane operator cleaning the diesel tank outside the cabin while the load was suspended. Also, trailer driver find was without PPEs like safety helmet and gloves. | DEL Yard | DEL Yard | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Act | PPE | At DEL yard, during crane operation worker was found crossing the barricaded area and crane operator cleaning the diesel tank outside the cabin while the load was suspended. Also, trailer driver find was without PPEs like safety helmet and gloves. | DEL Yard | DEL Yard | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Condition | Housekeeping | Near Crude pump pit, poor housekeeping was observed in the area after the maintenance activity. | Crude pump | Crude Pump Pit | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Condition | Work at Height | At below area of 205-F, near main stack, near furnace area & at 123-C platform, scaffolding materials were found on walkway without barrication. Informed to Civil department. | Plant Area | Below Area of 205-F, | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Condition | Work at Height | At furnace area, scaffolding material trolley was found parked without wheel chowks. Informed to safety supervisor. | Plant Area | Furnace Area | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Act | Work at Height | At heat exchanger area, during erection of scaffolding M/s DEL scaffolders were not using tool tether. Counseling done | Plant Area | Heat Exchanger Area | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Condition | Procedure | At 123-C platform & below area of 101-B furnace, leftover materials (welding blankets, stud bolts, spool pieces, lifting belt, tool trays etc.) need to be removed from platform. | Plant Area | 123-C Platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-31 |
| 2025-08-30 | Unsafe Condition | Lack of Supervision | At road #10 and near heat exchanger area, mixed waste (hazardous and non- hazardous) was found, informed to M/s HSE supervisor. | Plant Area | Near Heat Exchanger | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-30 | Unsafe Act | Work at Height | At 185C, during fit-up activities, an untagged scaffolding platform was being used by DEL team. | Plant Area | At 185C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-09-01 |
| 2025-08-29 | Unsafe Act | Procedure | At 185C, two Descon workers were observed crossing the barricaded area during lifting operations. | Plant Area | At 185C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-30 |
| 2025-08-29 | Unsafe Act | Work at Height | At 106-J and 105-JA, scaffolding dismantling was in progress while the rotary team was simultaneously working below in the same area. | Plant Area | At 106-J and 105-JA | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-30 |
| 2025-08-29 | Unsafe Condition | Work at Height | At multiple locations loose material were found on scaffolding/ permanent platform that needs to be removed. (Open) | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-31 |
| 2025-08-29 | Unsafe Act | Falling Object | At Boiler # 2, grinder spatters were observed falling onto the gas cutter cylinder's lead and a polythene bag. | Plant Area | Boiler # 2 | Stationary | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-30 |
| 2025-08-29 | Unsafe Act | PPE | At boiler # 2, WMS worker found handling shar edge metallic piece without wearing safety gloves. | Plant Area | boiler # 2 | Stationary | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-01 |
| 2025-08-29 | Unsafe Condition | Lack of Supervision | At road #10, near AFCs, at 123C platform and near heat exchanger area, mixed waste (hazardous and non- hazardous) was found, informed to M/s HSE supervisor. (Open) Repetitive | Plant Area | 123C Platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-29 |
| 2025-08-29 | Unsafe Condition | Procedure | At AFC 105-Cs, leftover materials (pressure gauges, stud bolts, etc.) need to be removed from platform. | Plant Area | AFC 105-Cs | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-30 |
| 2025-08-29 | Unsafe Condition | Procedure | At AFC 105-Cs, leftover materials (pressure gauges, stud bolts, etc.) need to be removed from platform. | Plant Area | AFC 105-Cs | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-30 |
| 2025-08-29 | Unsafe Condition | Work at Height | At below area of 102-E & near Texas tower, scaffolding materials were found on walkway without barrication Informed to Civil department. | Plant Area | Below Area of 102-E | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-30 |
| 2025-08-29 | Unsafe Condition | Work at Height | At 123-C platform, scaffolding materials were observed on walkway, need to be removed. | Plant Area | 123-C Platform | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-30 |
| 2025-08-28 | Unsafe Condition | Procedure | At 101-B, a piece of wood wedge fell from platform in the barricaded area. | Plant Area | At 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-29 |
| 2025-08-28 | Unsafe Condition | Slip/Trip/Fall | At ISOM near desalter drain pit grating found expanded and shuffle from its surface which is posing a tripping hazard. | Plant Area | Near Desalter | Stationary | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-29 |
| 2025-08-28 | Unsafe Act | Procedure | At furnace area, crane was moving while its out rigger fully extended. | Plant Area | Furnace Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-29 |
| 2025-08-28 | Unsafe Condition | Falling Object | At furnace platform, loose material (wire brush) was found on edge posing a falling object. | Plant Area | At Furnace Platform, | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-29 |
| 2025-08-27 | Unsafe Condition | Procedure | At heat exchanger area. Unattended pressurized gas cylinder was found on walkway. Counseling done. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Condition | Procedure | At multiple locations (below area of AFC, heat exchanger and pump gallery) loose materials (pipes, nut/ bolts, spool pieces, exchanger head, gasket, valves) were observed on the walkway without barrication. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Act | Procedure | At 105-Cs platform, stud bolts were found on walkway. Needs to be removed. | Plant Area | 105-Cs Platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Act | Procedure | At AFC 105-Cs, an unsafe act was observed where a fitter from M/s DEL was walking on the fin tube, which may result in tube deformation. Counseling of fitter was done at site and informed to Mr. Fahad Alvi. | Plant Area | AFC 105-Cs | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Act | Work at Height | At below area of AFC, unorganized scaffolding materials were observed, which could potentially fall into the drain channel. Informed to Civil department. | Plant Area | Below Area of AFC | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Condition | Work at Height | At 123-C platform, scaffolding materials were observed on walkway, need to be removed. | Plant Area | At 123-C Platform | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Condition | Electrical | At 123-C platform, electrical cable tray was found detached and posing falling hazard. Needs to be fixed. | Plant Area | At 123-C Platform | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Condition | Procedure | At multiple locations, oil-soaked cotton rags were found left on-site and on pipelines after maintenance activities. This poses a potential fire hazard during start-up operations. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Condition | Housekeeping | At 105-C, poor housekeeping was observed on the platform. | Plant Area | At 105-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Condition | Housekeeping | At 201-C, M/s AG's air compressor was found without wheel stoppers, and the area was not barricaded. The team was counseled. | Plant Area | At 201-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Condition | Procedure | At furnace area, an expired 6 kg DCP fire extinguisher was found in a rusty and inadequate condition. Immediately it was removed from site. | Plant Area | Furnace Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Act | PPE | At 125-J, a forklift was observed lifting an exchanger flange using the fork edges, causing it to slip and nearly fall. The activity was stopped immediately and the operator was counseled. | Plant Area | At 125-J | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Condition | Procedure | At 101-B, the area was found not barricaded during a lifting operation. The team was counseled. | Plant Area | At 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Act | Housekeeping | At 101-B, two paint buckets were found placed near ongoing hot work activity. The buckets were immediately removed from the site. | Plant Area | At 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-27 | Unsafe Act | PPE | At 101-B, M/s DEL’s welding lead was observed climbing the monkey ladder without wearing chin strap and safety gloves. Counseling done. | Plant Area | At 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-26 | Unsafe Condition | Procedure | At multiple locations (below area of AFC, heat exchanger and crude pump) loose materials (pipes, nut/ bolts, spool pieces, exchanger head, gasket, valves) were observed on the walkway without barrication. | Plant Area | At Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-27 |
| 2025-08-26 | Unsafe Condition | Lack of Supervision | At road #10, mixed waste (hazardous and non- hazardous) was found, informed to M/s HSE supervisor. | Plant Area | At Road #10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-27 |
| 2025-08-26 | Unsafe Condition | Procedure | At crude pump area, metallic ramp was observed on the walkway without barrication. | Crude Pump Area | Crude Pump Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-26 | Unsafe Condition | Procedure | At crude pump area, metallic ramp was observed on the walkway without barrication. | Crude Pump Area | Crude Pump Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-28 |
| 2025-08-26 | Unsafe Condition | Procedure | At heat exchanger area, M/s DEL’s compressor was observed parked without wheel chowk. | Crude Pump Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-27 |
| 2025-08-26 | Unsafe Condition | Lack of Supervision | At crude pump area, during hot work combustible material (tarpaulin) was observed within 7-meter radius of the activity. Informed to M/s DEL’s HSE supervisor. | Crude Pump Area | Crude Pump Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-27 |
| 2025-08-26 | Unsafe Condition | Work at Height | At different locations of heat exchanger and crude pump area, leftover scaffolding materials were observed, need to be removed. | Plant Area | Different Locations | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-27 |
| 2025-08-26 | Unsafe Condition | Housekeeping | At 101-B, poor housekeeping was observed. | Plant Area | At 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-27 |
| 2025-08-26 | Unsafe Condition | PPE | At 105-C2, UE worker was found wearing safety goggles while performing the paint job. Counseled the worker. | Plant Area | 105-C2 | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-27 |
| 2025-08-26 | Unsafe Act | Vehicle | At Road # 10, a DEL truck (Mazda) was observed moving without a flagman. Counseled the driver | Road # 10 | Road # 10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-27 |
| 2025-08-26 | Unsafe Act | Equipment | At 101-B, a worker was found using a grinder with folded sleeves. Counseled the worker | Road # 10 | At 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-26 | Unsafe Condition | Electrical | At the 101-B platform, electrical board cabling was found laid across the walkway, posing a tripping hazard. Informed the supervisor | Plant Area | At 101-B Platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-26 | Unsafe Condition | Falling Object | At the 101-B platform, a loose metal piece was found placed in a way that posed a falling object hazard. Informed the supervisor | Plant Area | At 101-B platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Falling Object | At different locations of pump gallery, leftover scaffolding materials were observed, need to be removed. | Plant Area | Different Locations | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Lack of Supervision | At Desalter area, gas cylinder trolley was found on walkway, informed to M/s HSE supervisor. | Plant Area | At Desalter Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Procedure | At 123-C Platform, leftover materials need to be removed. | Plant Area | At 123-C Platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-08-26 |
| 2025-08-25 | Unsafe Condition | Procedure | At multiple locations (below area of AFC, utility, heat exchanger and pump gallery area) loose materials (pipes, nut/ bolts, spool pieces, exchanger head, gasket, valves ) were observed on the walkway without barrication. | Plant Area | At Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Lack of Supervision | At multiple locations (furnace area, road 5, road 10, 123-C platform, heat exchanger area) mixed waste (hazardous and non- hazardous) were found, informed to M/s HSE supervisor. | Plant Area | At Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Slip/Trip/Fall | At the plant center, the steam pipe layout was found to be unorganized, causing a tripping hazard. (Closed) | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Slip/Trip/Fall | At the plant center, the steam pipe layout was found to be unorganized, causing a tripping hazard. (Closed) | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | PPE | At the Hydrogen/Nitrogen area, two workers from Pakistan Oxygen were performing a job without PPEs. The issue was reported to CR, and the workers immediately wore PPEs. | Plant Area | At Hydrogen/Nitrogen Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Housekeeping | At 105-Cs platform, a Flame proof light found placed on the walkway. | Plant Area | At 105-Cs Platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Housekeeping | At 105-Cs platform, a Flame proof light found placed on the walkway. | Plant Area | At 105-Cs Platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Housekeeping | Near Texas tower During Crane Operation the drain was not covered. | Plant Area | At 105-Cs Platform | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Act | Falling Object | At 105-Cs, it was observed that a tray was full of nuts posing a falling object hazard. | Plant Area | At 105-Cs | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Lack of Supervision | Inside 101-B confined space, the compressor had been shut down, but a DESCON worker was still working inside. The supervisor was informed, and the worker was counseled. | Plant Area | Inside 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Lack of Supervision | Inside 101-B confined space, the compressor had been shut down, but a DESCON worker was still working inside. The supervisor was informed, and the worker was counseled. | Plant Area | Inside 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Act | Procedure | While the Steam flashing at Boiler area, workers found inside the barricaded area. The worker was counseled. | Plant Area | At Boiler Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Environment | At plant area, all dustbins found full of garbage need to be removed from the area. | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Condition | Lack of Supervision | At 704-C ISOM area, during hydro jetting work, one side of the hydro jetting canopy was not properly covered. The issue was reported to the Descon supervisor, and the area was immediately covered. | Plant Area | At 704-C ISOM Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-26 |
| 2025-08-25 | Unsafe Act | PPE | At 101B, during civil refractory work inside the furnace (confined space), three workers were not wearing face masks. The issue was reported to the Descon SBM, and the workers were counseled. (Closed) | Plant Area | At 101B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-08-25 | Unsafe Act | PPE | At 101B, during civil refractory work inside the furnace (confined space), three workers were not wearing face masks. The issue was reported to the Descon SBM, and the workers were counseled. | Plant Area | At 101B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-08-25 | Unsafe Act | Line of Fire | At 101B (outside), during painting work with a cherry picker, one Descon worker was in the line of fire. The supervisor was informed, and the worker was counseled. | Plant Area | At 101B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-08-25 | Unsafe Act | Line of Fire | At 101B (outside), during painting work with a cherry picker, one Descon worker was in the line of fire. The supervisor was informed, and the worker was counseled. | Plant Area | At 101B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-08-25 | Unsafe Act | PPE | At 152-F during the main hole opening, one Descon fitter was performing the job without safety gloves. The supervisor was informed, and the worker was counseled. | Plant Area | At 152-F | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-08-25 | Unsafe Condition | Housekeeping | At multiple locations (furnace area, road 5, heat exchanger area) mixed waste (hazardous and non- hazardous) was found, informed to M/s HSE supervisor. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-08-25 | Unsafe Condition | Procedure | Since the start of the shutdown, the HSE lead for the night shift of M/s DEL has not reported. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-08-24 | Unsafe Act | Work at Height | At 2201-F, during work at height, DEL team was not using the tool tie. | Plant Area | At 2201-F | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-08-24 | Unsafe Act | PPE | At 105-C2, UE workers were observed performing job without wearing safety goggles. | Plant Area | At 105-C2 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-25 |
| 2025-08-24 | Unsafe Condition | Slip/Trip/Fall | At 105-C7, material placed on platform posing a tripping hazard. | Plant Area | At 105-C7 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-26 |
| 2025-08-24 | Unsafe Condition | Work at Height | At boiler & 3, during work at height, the area was not barricade. | Plant Area | At boiler 2 & 3 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-25 |
| 2025-08-24 | Unsafe Act | Work at Height | In the furnace area, a scaffolder was observed lifting three (03) scaffolding pipes simultaneously. | Plant Area | Furnace Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-25 |
| 2025-08-24 | Unsafe Condition | Housekeeping | At 101-E, 102-C, exchanger head cover was placed without area barricade. | Plant Area | At 101-E, 102-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-25 |
| 2025-08-22 | Unsafe Condition | Procedure | At 118-C, during crane operation, area was not barricaded. | Plant Area | At 118-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Work at Height | At different locations in the process and utility area loose scaffolding pipes and planks were observed on the walkway without barrication. | Plant Area | Different Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Electrical | At the reactor area, a compressor was found in use without earthing. The operator was counseled on site and instructed to ensure earthing before operating the compressor. | Plant Area | At Reactor Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Equipment | At utility area, during hot job an energized grinder was observed on the floor. Counseling done. | Plant Area | At Utility Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-23 | Unsafe Act | Line of Fire | At the Utility and Pump Gallery, sparks were observed coming out of the welding canopy. The working team was immediately instructed to cover the area. | Plant Area | At Utility and Pump Gallery | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-24 |
| 2025-08-23 | Unsafe Act | Work at Height | At 304-C, while working at height M/s DEL TE was found scaffolding platform without wearing safety harness. Counseling done | Plant Area | At 304-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-24 |
| 2025-08-23 | Unsafe Act | Work at Height | At 301-F while working at height, M/s DEL worker was using spanner without tie his tool with tool tether. | Plant Area | At 301-F | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-24 |
| 2025-08-23 | Unsafe Condition | Procedure | At multiple locations (below area of AFC, utility, heat exchanger and pump gallery area) loose materials (pipes, nut/ bolts, exchanger head, gasket, valves ) were observed on the walkway without barrication. | Plant Area | At Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-24 |
| 2025-08-23 | Unsafe Condition | Procedure | A hot job was carried out in the Utility and Pump Gallery, but no fire watcher from M/s DEL were available. | Plant Area | Utility and Pump Gallery | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-24 |
| 2025-08-22 | Unsafe Condition | PPE | At 109-J, hot work activity started without fire watcher and taking precautions. Immediately stopped and instructed to take control measures. | Plant Area | At 109-J | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Work at Height | At 105-C, a DEL worker was found without chin guard at height. | Plant Area | At 105-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | PPE | At 106-C7, WMS workers were performing electrical related jobs without wearing safety gloves. | Plant Area | At 106-C7 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Work at Height | At 301-CN, DEL worker using the hammer without tied with the tool teether while working at height. | Plant Area | At 301-CN | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Work at Height | Near the fitter room, scaffolding erection activity was in progress without the area being barricaded, and workers were drinking water from the cooler at the same location. | Plant Area | Near the Fitter Room | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Housekeeping | At cooling tower, 105-C7 and humidifier, poor housekeeping was observed. | Plant Area | At Cooling Tower | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Procedure | At humidifier, 105-C5 platform, 301-B, 311-B, and 302-B, miscellaneous materials were observed without barricaded. | Plant Area | Different Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Work at Height | At 103-B, it was observed that a DEL worker stepped onto a ladder to access the scaffolding platform without wearing a safety harness. He was immediately stopped and reminded to wear safety harness. | Plant Area | At 103-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Procedure | In utility area near 2403-J, drain channel grating was found missing and area not barricaded. | Plant Area | Utility Area Near 2403-J | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Electrical | At heat exchanger area, M/s DEL QC person was observed using non-intrinsically battery-operated flashlight without permit and electrical inspection tag. Counseling done. | Plant Area | At Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | PPE | Stationary Dept‘s AP and multiple R.E workers were observed wearing black goggles at night. Counseling done. | Plant Area | Stationary Dept‘s | Stationary | CONTRACTOR | RE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Procedure | At pump corridor and in front of 104-C spool pipes was observed on the floor without barrication. | Plant Area | At Pump Corridor | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Work at Height | At pump corridor area, a bag filled with rags was observed placed in front of the monkey ladder blocking the access. Removed later. | Plant Area | Pump Corridor | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Lack of Supervision | At 123C And 124C leftover material was found. Informed to M/s DEL’s safety supervisor. | Plant Area | At 123C And 124C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Housekeeping | At JP-1 gantry, during dinner time, M/s DEL workers were observed lying on the road. Counseling done. | Plant Area | At JP-1 gantry | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Work at Height | At pump corridor area M/s AKS worker was observed working on the scaffolding without equipping his tool with tool tie. Counseling done. | Plant Area | Pump Corridor Area | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2026-07-09 | Unsafe Condition | Environment | At intersection of road 3 and 10, a tray loaded with oily rocks and sludge filled bags (pyrophoric material suspected) were observed, informed to Mr. Arsalan for removal. | Plant Area | At Intersection of Road 3 and 10 | Civil | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Procedure | M/s DEL rigger in-charge was found wearing an unapproved coverall at plant side. | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Procedure | Near control room loose material (flanges) was observed on the floor without barrication. | Plant Area | Near control Room | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Procedure | Multiple M/s DEL’s workers were observed in the plant area wearing unapproved coveralls having metallic buttons. Instructed to wear the approved coverall. | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-22 | Unsafe Condition | Vehicle | At roads #07 near boiler #04 a crane was observed parked with elevated boom, Informed the HSE supervisor of M/s DEL. | Plant Area | Roads #07 Near Boiler #04 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Work at Height | At 123C And 124C, loose scaffolding materials were found on the platform. | Plant Area | At 123C And 124C | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2026-07-09 | Unsafe Condition | Lack of Supervision | The reverse alarm and spark arrestor of the DEL ambulance were missing, and a paramedic staff member was also absent today | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Slip/Trip/Fall | At 303-CN, the hose pipe of the hydro jetting machine was laid on the floor in an unorganized manner, posing a tripping hazard. | Plant Area | At 303-CN | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Procedure | At 105-C, during lifting operation WMS team working inside the barricaded area. | Plant Area | At 105-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | PPE | At 301-J, M/s DEL workers using sandpaper without wearing safety gloves. | Plant Area | At 301-J | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Procedure | At 109-J, M/s DEL contractor's fire extinguisher found rusty from the bottom. | Plant Area | At 109-J | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Work at Height | At 202-C, M/s DEL worker was found using a spanner at height, with the tool tied to a tool tether. | Plant Area | At 202-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Procedure | At multiple locations like 101-B, 103-B & 104-F misc. material was observed in the area without barricade. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Housekeeping | At multiple locations like near CR, 108-C, 202-C1, 106-C, 203-JA, 302-C2 & trim cooler poor housekeeping was observed. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-21 | Unsafe Condition | Work at Height | At 113-C, poor housekeeping was observed on the scaffolding platform. | Plant Area | At 113-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-21 | Unsafe Act | Work at Height | In the pump corridor, a long scaffolding pipe was being handled by a single DEL worker. | Plant Area | Pump Corridor | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Act | Work at Height | At 105-C, a DEL worker was found on the scaffolding platform without wearing a safety harness. | Plant Area | At 105-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Condition | Line of Fire | At 105-JA, during hot work activity, sparks were coming out from the fire blanket canopy. Instructed to properly cover the area. | Plant Area | At 105-JA | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Condition | Procedure | At Air Coolers 105-C, water from the cleaning activity was dropping without proper area barricading. Immediate intervention was carried out, and corrective actions were taken. | Plant Area | At Air Coolers 105-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Condition | Procedure | At multiple locations (Heat exchanger area, near Stationary caravan, pump corridor area and AFC), loose material (nut/bolts, exchanger covers) was found without barrication . | Plant Area | At Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Act | Work at Height | At pump corridor area, M/s DEL workers were found using scaffolding having expired inspection tag. Informed the site supervisor. | Plant Area | Pump Corridor Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Condition | Procedure | During the night shift, when hydro jetting and furnace activities commenced, no HSE representative from M/s DEL was present at the site. Several DEL members were instructed to immediately call their HSE team to the site; however, DEL’s HSE representatives arrived after approximately one hour. | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Act | Procedure | At WWTP, a compressor was observed being used without attaching its hose pipe with a whip latch. Instructed the operator to attach the hose pipe with a whip latch. | Plant Area | At WWTP | Rotary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Condition | Work at Height | Loose scaffolding material was found without barrication at air fan cooler area and Heat exchanger area. | Plant Area | Air Fan Cooler Area | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Act | Work at Height | At 103-B, during a hot work activity, sparks were observed coming out from the fire blanket canopy. Additionally, the worker was not wearing required PPE such as a chin guard, ear plugs, and had not fastened his safety harness while working at height. | Plant Area | 103-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Condition | Work at Height | At the hydro air coolers, a pulley was being used for a lifting activity, however it was installed at the edge of a single, open-ended scaffolding pipe, posing a risk of slippage. Additionally, poor housekeeping was observed on the platform. | Plant Area | Hydro Air Coolers Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-21 | Unsafe Act | Work at Height | At above area of 204-C, M/S DEL scaffolders were observed modifying the scaffolding on green tag instead of replacing it with a red tag. Informed to site supervisor. | Plant Area | At Above Area of 204-C | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Act | Procedure | At Road # 8, air pressurized hose pipe of air compressor detached from the coupling. | Plant Area | At Road # 8 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Act | Lack of Supervision | At 105-C, UE workers were performing a lifting operation without using a tool bag and pulley, which resulted in the rope being damaged at multiple points. Supervisor immediately changes the rope. Repetitive | Plant Area | At 105-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Condition | Procedure | In front of 108-C, a fire extinguisher trolley was blocked due to the placement of lifting gears around it. Informed to lifting in charge. | Plant Area | In Front of 108-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Condition | Slip/Trip/Fall | At 124-C, 202-C and 106-C3, loose material was found on the platform. Informed M/s UE supervisor. | Plant Area | At 124-C, 202-C and 106-C3 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Condition | Work at Height | At furnace area, scaffolding pipes and metal plank was found on walkway. Informed to Mr. Arsalan of Civil department | Plant Area | Furnace Area | Civil | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Act | Work at Height | At furnace area, M/s DEL scaffolder was throwing scaffolding clamps. Counseling done. | Plant Area | At 103-B | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Condition | Housekeeping | At furnace and at heat exchanger area, GI sheet was placed on floor without securing it. Informed to DEL HSE representative for securing. | Plant Area | At 103-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Act | PPE | At furnace area, while working in confined space, M/s DEL workers were wearing dust masks, Counseling of team done and instructed their supervisor to provide N-95 mask. | Plant Area | At 103-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Act | Procedure | At heat exchanger area, M/s DEL worker was found wearing unapproved coverall (metallic button and with DEL name). Informed to DEL HSE representative. | Plant Area | At 103-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Act | Work at Height | At AFC, M/s DEL worker was found on scaffolding platform with hooking his harness hooks. Counseling done. | Plant Area | At 103-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Condition | PPE | At the caustic yard, leakage of caustic was observed from the housing of pump 101-JA. The stationary team applied a spade on the line, but leakage has not stopped. Control Room has been informed. (Open) | Plant Area | At the Caustic Yard | Operation | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Condition | Slip/Trip/Fall | At 106-C, a channel was placed on walkway posing a tripping hazard. (Closed) | Plant Area | At 106-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Act | Electrical | At 201-D, during hot work activity, earthing wire connection was found partially detached. | Plant Area | At 201-D | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Act | Work at Height | At cooling tower, M/s AKS team was performing the scaffolding erection activity without any safety supervision. Action taken by the civil team. | Plant Area | At 103-B | Civil | CONTRACTOR | AKS | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2026-07-09 | Unsafe Condition | Work at Height | At 202 air cooler, loose material was observed on scaffolding platform. Counseled the team | Plant Area | At 202 Air Cooler | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-20 | Unsafe Condition | Work at Height | At 202 air cooler, loose material was observed on scaffolding platform. Counseled the team | Plant Area | At 202 Air Cooler | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-21 |
| 2025-08-20 | Unsafe Act | Procedure | At the plant center, an operations team member was found crossing a barricaded area while a crane operation was in progress. Counseled the staff. | Plant Area | At the Plant Center | Operation | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2025-08-21 |
| 2025-08-20 | Unsafe Condition | PPE | At 201-C5, hydrocarbon and water mixture were draining while the crane and Woma machine are being used in the vicinity. Immediately activity stopped and instructed to plan the activity. (Closed) | Plant Area | At 201-C5 | Operation | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-20 | Unsafe Act | Environment | At the pump corridor, the operations team was transferring a Perchloroethylene drum by rolling it on the floor. Counseled the team. | Plant Area | At the Pump Corridor | Operation | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-20 | Unsafe Act | Procedure | At 301-CN, operations team taking drain hose pipe upside with help of rope however on connection of hose pipe its metal coupling bolts were missing. Immediately action was taken by ops team and resolve the obs. (closed) | Plant Area | At 301-CN | Operation | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-20 | Unsafe Condition | Line of Fire | At 201-B, during hot work on steam line, sparks were coming out from the canopy. Instructed the supervisor to cover the area properly. | Plant Area | At 201-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-20 | Unsafe Act | Procedure | At 118-C, during hydro jetting activity area was not barricaded and a DEL worker was found with sleeves folded. Counseled the worker | Plant Area | At 118-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-20 | Unsafe Condition | Procedure | In front of 101-C, a fire extinguisher trolley was blocked due to the placement of lifting gears around it. Informed to lifting in charge. | Plant Area | Infront of 101-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-19 | Unsafe Condition | Procedure | In front of AFC and at heat exchanger area, wooden blocks and heat exchanger cover were found on walkway without barrication. | Plant Area | Infront of AFC | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-20 | Unsafe Condition | Procedure | At plant center, bundle puller was slightly hit with steam line below the 107-F while lifting by the crane and the DEL workers were standing below the suspended load. Counseled the team. | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-21 |
| 2025-08-20 | Unsafe Act | Procedure | After lunch at the site, the DEL HSE representative was not available. Later, their HSE lead instructed the team to be present at the site for supervision. | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-21 |
| 2025-12-30 | Unsafe Condition | Work at Height | At tank # 05, scaffolding platform inspection tag found expired. Informed to Nazam sb. | Tank Farm | Tank # 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-01-01 |
| 2025-12-30 | Unsafe Condition | Work at Height | At tank # 36, inside tank yard an iron hammer was being used to straight the scaffolding pipe very close to adjacent flanges. Informed to IIW HSE person & project manager. | Tank Farm | Tank # 05 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-01 |
| 2025-12-30 | Unsafe Condition | PPE | At tank # 11, during tank inside mechanical work workers found with wearing face mask and safety goggle. Informed to HSE person ATL. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-01-01 |
| 2025-12-30 | Unsafe Condition | Electrical | At tank # 11, during tank inside mechanical work found using LED lights with expire Electrical inspection tag. Informed to HSE person ATL. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-01-01 |
| 2025-12-30 | Unsafe Condition | Electrical | At tank # 04, M/s Al Hadeed HSE person was not available at site during sludge removal activity. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | AL-HADEED | Routine | | Korangi Refinery | team | Closed | | 2026-01-01 |
| 2025-12-30 | Unsafe Condition | Procedure | A M/s Kundi worker was observed passing directly below the flare stack instead of using the designated proper passage or roads | Plant Area | Flare | Construction | CONTRACTOR | AL-HADEED | Routine | | Korangi Refinery | team | Closed | | 2026-01-01 |
| 2026-01-01 | Unsafe Condition | Procedure | At tank yard # 4, workers were observed climbing on the boundary wall and carrying out demolition work in an unsafe manner. | Tank Farm | Tank Yard # 4 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-03 |
| 2026-01-01 | Unsafe Condition | Procedure | At tank# 35, M/s IIW excavator being used at site was not fitted with a swing alarm. | Tank Farm | Tank 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-03 |
| 2026-01-02 | Unsafe Condition | Procedure | At tank# 35, M/s IIW excavator being used at site was not fitted with a swing alarm. | Tank Farm | Tank #35 | Construction | CONTRACTOR | PRL | Routine | | Korangi Refinery | team | Closed | | 2026-01-03 |
| 2026-01-02 | Unsafe Condition | Procedure | At tank yard # 4, workers were observed climbing on the boundary wall and carrying out demolition work in an unsafe manner. | Tank Farm | Tank #04 Yard | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-03 |
| 2025-08-18 | Unsafe Condition | Procedure | The same worker of M/s AG, who was found yesterday at Gate 3 without having undergone medical and safety orientation and was handed over to Mr. Shahzad of M/s WMS, was again found today near the fire camp. Upon investigation, it was revealed that his medical and safety orientation has still not been conducted. He has now been handed over to Mr. Fahad Alvi. | Plant Area | At Gate 3 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-05 | Unsafe Condition | PPE | At tank 04 yard, during civil work 2 IIW workers not warring safety goggles, informed to site supervisor and consoling done. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-06 |
| 2025-08-18 | Unsafe Condition | Slip/Trip/Fall | In front of heat exchanger area, water accumulation was observed on the floor, creating slip/trip hazard. | Plant Area | Infront of Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Condition | Lack of Supervision | At 185-C near compressor of M/s DEL a fire extinguisher of PRL was found. Informed and instructed the safety supervisor to replace it with DEL’s Fire extinguisher. (Closed) | Plant Area | At 185-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Act | Lack of Supervision | In front of AFC, a Fire extinguisher of M/s DEL without monthly inspection tag was found. Informed to safety supervisor. | Plant Area | In Front of AFC | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-01-07 | Unsafe Condition | Procedure | Walkway is required for easily access the foam header at road # 1. | Tank Farm | Road # 1 | Civil | PRL | | Routine | | Korangi Refinery | team | Closed | | 2026-01-08 |
| 2025-08-18 | Unsafe Act | Electrical | At DEL yard, M/s DEL safety team is using amplifier speaker set having expired PRL’s electrical inspection tag. | Plant Area | DEL Yard | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-07 | Unsafe Condition | Procedure | Permanent Chain pole need to be installed as barrication over underground pipelines at road # 1 near VFD Crude Pump. | Tank Farm | Road # 1 | Civil | PRL | | Routine | | Korangi Refinery | team | Closed | | 2026-01-08 |
| 2025-08-19 | Unsafe Condition | Environment | At the heat exchanger area, filter cartridge of hydro jetting machine was found on floor. Informed to hydro jetting supervisor for removal. | Plant Area | At the Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2026-01-07 | Unsafe Condition | Equipment | Handrail installed at walkway need to be fixed located at road no. 2 opposite foam skid generator. | Tank Farm | Road # 1 | Civil | PRL | | Routine | | Korangi Refinery | team | Closed | | 2026-01-08 |
| 2025-08-19 | Unsafe Condition | Lack of Supervision | At 105-C, UE workers were performing a lifting operation without using a tool bag and pulley, which resulted in the rope being damaged at multiple points. Supervisor immediately change the rope. | Plant Area | At 105-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-19 | Unsafe Condition | Housekeeping | At furnace area, load chain was found on walkway, needs to be removed from the site or placed in barricaded area. | Plant Area | Furnace Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-20 |
| 2025-08-18 | Unsafe Condition | Procedure | At 118-CN DEL fire extinguisher -14 DCP 6KG found substandard fire extinguisher seal. | Plant Area | At 118-CN | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-18 | Unsafe Act | Procedure | At heigh Noice furnace area WMS worker found without ear protection. | Plant Area | Furnace Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-20 |
| 2026-01-07 | Unsafe Act | Lack of Supervision | At tank#35,during excavation work use one dumper move on rood.16 without flagman. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-08 |
| 2025-08-18 | Unsafe Condition | Work at Height | At cooling Tower 2305-JE loose material scaffolding clamps are placed on planks at height. Informed to supervisor. | Plant Area | Cooling Tower 2305-JE | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Act | Work at Height | At exchanger area two DEL workers climbed monkey ladder together at same time Counseled the team. | Plant Area | At Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Act | PPE | DEL supervisor was not using proper PPE’s (without safety goggles and short sleave coverall). Counseled the team. | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-06-19 |
| 2026-01-07 | Unsafe Act | Procedure | At tank# 11 ATL,W/S, during crane operation involved riggers 3rd party certification missing. Informed HSE in charge . | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-08 |
| 2025-08-18 | Unsafe Condition | Work at Height | At near furnace area, scaffolding material trolley was found without wheel chowks. | Plant Area | Furnace Area | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-19 | Unsafe Condition | Slip/Trip/Fall | At the heat exchanger area, the towing jack of the hydro jetting machine was placed right next to the access ladder of 123-C, creating a tripping hazard for personnel coming down from the ladder. Informed to hydro jetting supervisor. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | AG | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-07 | Unsafe Act | Lack of Supervision | At tank#04,during confined space activities, not present HSE person ,informed site supervisors. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-08 |
| 2026-01-07 | Unsafe Act | Lack of Supervision | At tank#04 ,during removing IFR materials not barricaded informed site supervisor and immediately barricading area. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-08 |
| 2026-01-07 | Unsafe Act | Procedure | At tank#35, during excavation work, found full diesel dram were present at tank yard. Informed to HSE in charge immediately remove diesel dram. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-09 |
| 2026-01-07 | Unsafe Act | Lack of Supervision | At tank#35,during excavation work, found some materials not barricaded at work site. Informed to HSE supervisor IIW using materials barricaded immediately. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-09 |
| 2026-01-07 | Unsafe Act | Lack of Supervision | During excavation work at Tank #35, the excavator being used by M/s IIW was found without a PRL-approved spark arrester and was reported to the HSE In-Charge. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-09 |
| 2026-01-08 | Unsafe Act | Lack of Supervision | At ATL yard, during safety round , 1st half ambulance driver and paramedic does not present at site. Informed to HSE lead. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-10 |
| 2026-01-08 | Unsafe Condition | Procedure | During crane operations at the ATL yard, two riggers were observed working without valid third-party certification and the matter was reported to the HSE Lead | Tank Farm | Road # 1 | Construction | PRL | | Routine | | Korangi Refinery | team | Closed | | 2026-01-10 |
| 2026-01-08 | Unsafe Act | PPE | At tank #04, during sludge pits backfilling 2 workers without safety gloves working, informed to site supervisor. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-10 |
| 2026-01-08 | Unsafe Condition | Procedure | At Tank #35, during a safety round, it was observed that grounding and earthing of the IIW containers were missing. The issue was reported to the HSE Lead. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-10 |
| 2026-01-08 | Unsafe Condition | Procedure | At tank #35, during safety round found the IIW ambulance shade and battery terminal safety cover missing ,informed to HSE lead. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-10 |
| 2025-08-18 | Unsafe Condition | Equipment | At plant center, whip latch on hose pipe of hydro jetting machine was found missing. | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-08 | Unsafe Condition | Procedure | At tank #35, dDuring the civil work in progress, a tractor without a reverse alarm was found, and the driver did not have a valid DDC. The issue was reported to the HSE Lead. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-10 |
| 2025-08-18 | Unsafe Act | Procedure | At 105-C3, damage plank was being used for the movement on tubes. | Plant Area | At 105-C3 | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-09 | Unsafe Condition | Work at Height | At tank # 62, reflective tape was missing on scaffolding installed along the roadside, posing a risk of vehicle colliding with the scaffolding (AKS). | Tank Farm | Tank # 62 | Civil | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-11 |
| 2025-08-18 | Unsafe Act | Work at Height | At 101-B, DEL worker was coming down from the monkey ladder without following the three-contact point. | Plant Area | At 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Condition | Equipment | At Road # 8, fire extinguisher seal on the hydro jetting machine was found missing. | Plant Area | At Road # 8 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-09 | Unsafe Condition | Work at Height | At tank # 62, the expiry date on inspection tag of scaffolding was not available. | Tank Farm | Tank # 62 | Civil | CONTRACTOR | AKS | Routine | | Korangi Refinery | team | Closed | | 2026-01-11 |
| 2025-08-18 | Unsafe Act | Procedure | At plant center, M/s DEL fork lifter was found wearing unapproved low ankle shoes. | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-09 | Unsafe Condition | Procedure | At tank # 56, paramedic was not present on site. Informed to HSE lead AJC. | Tank Farm | Tank # 62 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-11 |
| 2025-08-18 | Unsafe Condition | Equipment | The emission testing reports of the compressor and generators, as well as the fitness certificate of the gas cylinder, were not shared by the DEL team | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-09 | Unsafe Act | Equipment | At tank # 56, the operator was not present on the running 200 KV generator. Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Korangi Refinery | team | Closed | | 2026-01-11 |
| 2025-08-18 | Unsafe Condition | Lack of Supervision | At 107-C Parallel Scafolding Activity Perform by DESCON, Informed To S. Folding Supervisor And Counseling. | Plant Area | At 107-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Act | Work at Height | At 108-C Where Worker Of DESCON Work on Height There Safety Harness Hook Was Hook At Same Folding Pipe. Counselling the worker . | Plant Area | At 108-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-12 | Unsafe Act | Line of Fire | At tank # 56, three workers were observed in the vicinity of hot work and grinding activity and exposed to sparks. Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-11 |
| 2025-08-18 | Unsafe Condition | PPE | At Plant Center Observe DESCON Generator Stand Without Wheel Stopper. Informed To Generator Operator. | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-12 | Unsafe Condition | Procedure | At tank # 56, fire extinguisher was present on site, but the monthly and yearly inspection tags were not attached. Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-11 |
| 2025-08-18 | Unsafe Act | PPE | At Plant Center While Crane operation Was Perform, A crane Operator Observe Not Wear Safety Shoes Properly And Without goggle. Counselling the Worker. | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-12 | Unsafe Condition | Slip/Trip/Fall | At tank # 56, D door plate was lying in front of the main entrance ,creating a tripping hazard. Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-15 |
| 2025-08-18 | Unsafe Act | Procedure | At Plant Center Flag Man Not Found When Crane On Reverse . | Plant Area | At Plant Center | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Act | Procedure | In front of heat exchanger area, the rest shed was being in use by M/S DEL without green tag. Informed to Mr. Arsalan of Civil department. | Plant Area | Heat Exchanger Area | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Condition | Work at Height | In front of 108C loose scaffolding material was observed on the floor without barrication. Informed to safety supervisor. | Plant Area | At 108-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-12 | Unsafe Condition | Slip/Trip/Fall | At tank # 56, cables were laying at the main entrance, posing a potential of tripping hazard. Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-15 |
| 2026-01-12 | Unsafe Condition | Work at Height | At tank# 56, contractor two welders were working at height (above 6 ft) without wearing safety harness, Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-15 |
| 2025-08-18 | Unsafe Condition | PPE | At DEL yard, the ambulance of M/s DEL was found locked and the driver and the key were not present, upon calling the driver it was found that he had no valid DDC and had not undergone safety induction/ medical examination. The ambulance was not equipped with approved medicines/ first aid kit, no fire extinguisher was found inside. | Plant Area | DEL Yard | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-01-12 | Unsafe Condition | Procedure | At tank # 56, M/s AJC contractor and stationary HSE representative were not present at site during the job, Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-15 |
| 2025-08-18 | Unsafe Act | PPE | A truck carrying the food for M/S DEL was observed crossing gate #03 upon inspection it was found that the driver had no valid DDC, had not undergone safety induction/ medical examination. The truck was not equipped with a fire extinguisher and the battery terminals were found missing rubber boots. (Closed) | Plant Area | Gate# 3 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-18 | Unsafe Condition | Slip/Trip/Fall | In front of furnace area, metallic plates were observed on the walkway without barrication, creating tripping hazards. | Plant Area | Furnace Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-16 | Unsafe Condition | Housekeeping | The housekeeping at the construction site requires immediate attention. Used gloves, cartons, wrapping sheets, wooden bars, and other debris are scattered around the site. | Tank Farm | Construction Site | Stationary | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2025-08-18 | Unsafe Condition | Procedure | In front of AFC and at heat exchanger area, wooden blocks and heat exchanger cover were found on walkway without barrication. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Condition | Procedure | In front of AFC, a compressor was observed in use without its battery terminal covered with rubber cover. | Plant Area | In Front of AFC | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-16 | Unsafe Condition | Housekeeping | A worker from M/s Afzal Construction was observed standing/ working on wooden planks placed over a drum. | Tank Farm | Construction Site | Construction | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | Housekeeping | The fire extinguisher placed at the side was found be low on pressure, its safety seal was removed and there was no evidence of refilling or a valid expiry tag. | Tank Farm | Construction Site | Construction | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | Housekeeping | Multiple cans filled with lubricants/ chemicals were found placed directly on raw land instead of being stored in secondary containment. | Tank Farm | Construction Site | Construction | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | Housekeeping | The generator battery terminals were found without rubber protective boots. | Tank Farm | Construction Site | Construction | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | Electrical | A wooden electrical extension board is being used on site without a weather protection cover and without inspection by the Electrical Department. | Tank Farm | Construction Site | Construction | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | Electrical | Grinders was being placed directly on the floor as there are no proper grinder stands available. | Tank Farm | Construction Site | Construction | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | Electrical | It was observed that workers of M/s Afzal Construction were using electrical equipment such as grinders, electrical extension boards, welding rectifier, drill machines, generators, etc., that either do not have electrical inspection tags or have expired tags. | Tank Farm | Construction Site | Construction | CONTRACTOR | Afzal | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | Electrical | Tank #11: Electrical extension board found without inspection tag during safety round; informed HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | Line of Fire | Tank #35: Vehicle No. JY-9404 arrived with non-functional reverse alarm and improper spark arrester; informed site supervisor. | Tank Farm | Tank #35 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Condition | PPE | Tank #35: IIW workers were found without wearing dust masks during civil work; informed HSE supervisor and masks provided immediately. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-16 | Unsafe Act | Lack of Supervision | Tank #35: Worker observed not maintaining safe distance during stone breaking; informed IIW HSE supervisor and counseling done. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-18 |
| 2026-01-17 | Unsafe Condition | Housekeeping | At Tank #56, during crane operation lifting an 1800 kg MS plate, a 3-ton sling Wair was found damaged and was immediately replaced after informing HSE Supervisor AJC. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Lack of Supervision | At Tank #56, during hot work, a filled diesel jerry can was found in the work area; informed HSE Supervisor AJC. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Lack of Supervision | At Tank #56, during hot work, an electrical cable was found lying on a wet surface at the workplace; informed HSE Supervisor AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Electrical | At Tank #56, during hot work, the main electrical cable was found damaged; informed HSE Supervisor AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Line of Fire | At Tank #56, during the safety round, the ambulance spark arrestor was found unsuitable and not approved by PRL and was immediately replaced after informing HSE Supervisor. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Procedure | At Tank #56, during hot work, a fire extinguisher was found missing; informed HSE Supervisor AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Housekeeping | At Tank #56, during the safety round, a worker’s safety shoes were found damaged and were immediately replaced after informing HSE Supervisor AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Electrical | At Tank #56, during hot work, a 5" grinder electrical inspection tag was found damaged: informed HSE Supervisor AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Electrical | At Tank #56, during hot work, a damaged electrical extension board was found in use; informed HSE Supervisor AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Condition | Electrical | At Tank #56, during the safety round, workers were observed without safety goggles; informed HSE Supervisor AJC . | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-17 | Unsafe Act | Slip/Trip/Fall | At Tank #56, during hot work, a temporary ladder was used without proper fixing, creating a fall hazard; informed HSE Supervisor AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-18 | Unsafe Condition | Equipment | At tank # 35, generator shade not installed at office area. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | | Kemari Terminal | team | Closed | | 2026-01-22 |
| 2026-01-22 | Unsafe Act | PPE | At tank #56, M/s AJC worker working with binding wire without safety gloves | KT | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-06-25 |
| 2026-01-18 | Unsafe Condition | Equipment | At tank # 35, generator shade not installed at office area. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-22 |
| 2026-01-22 | Unsafe Act | Work at Height | At tank # 11, loose material was found on scaffolding platform during hot work. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-28 |
| 2026-01-23 | Unsafe Act | Electrical | At tank #56, M/s AJC DB (WP-01) was found without inspection tag. The DB was switch off and arrange an inspection tag and restore the operation. | KT | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-01-26 |
| 2026-01-25 | Unsafe Act | Lack of Supervision | At tank # 11, during hot work activities, the platform gap was not covered. Informed to the HSE Supervisor. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-28 |
| 2026-01-25 | Unsafe Act | PPE | At tank # 11, during sandblasting, nearby some workers were found not wearing a face mask. Informed to the HSE Supervisor. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-28 |
| 2025-08-17 | Unsafe Act | PPE | At plant center, DEL workers found without wearing gloves while handling the scaffolding materials. Counseled the team. | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Act | Procedure | At road # 3, crane operator and his helper were found wearing low ankle shoes. | Plant Area | At Road # 3 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-07-10 | Unsafe Act | PPE | 02 nos. DEL worker found at plant side without having safety induction stickers on their helmets. Counseled the team. | Plant Area | Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Procedure | Roads # 3 and 6 were blocked due to crane parked on it. Counseled the team. | Plant Area | Roads # 3 and 6 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Lack of Supervision | At multiple locations. Low pressure and without monthly inspection tag Fire extinguisher of M/s DEL were found. Informed to safety supervisor | Plant Area | Multiple Locations. | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Housekeeping | Near 108-C empty WD-40 cans & oily rags were found on floor. Informed to DEL supervisor for housekeeping. | Plant Area | Near 108-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-01-17 | Unsafe Condition | Line of Fire | At tank #56, A 200 KVA generator spark arrestor found installed with unapproved spark arrestor Informing HSE supervisor. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-01-30 |
| 2025-08-17 | Unsafe Condition | Electrical | Low lighting was observed at 202-C1 & C2. Later electrical department provides light on the locations. | Plant Area | At 202-C1 & C2 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Housekeeping | At 123-C & 124-C, loose materials were observed. Informed to DEL supervisor for housekeeping. | Plant Area | At 123-C & 124-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Act | PPE | At 123-C & 124-C, 2 nos of M/s DEL workers were observed without wearing helmet chin strap. Counseling done. | Plant Area | At 123-C & 124-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Act | Slip/Trip/Fall | At AFC, 4 nos of M/s DEL riggers were found at scaffolding platform without wearing safety harness. Counseling done. | Plant Area | At AFC | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-10 |
| 2025-08-17 | Unsafe Condition | Procedure | At near AFC, wooden blocks and heat exchanger cover were found on walkway without barrication. | Plant Area | At Near AFC | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Work at Height | At heat exchanger area, scaffolding materials were found on walkway without barrication. | Plant Area | Heat Exchanger Area | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Lack of Supervision | At heat exchanger area, pressurized hose was found without whip latch. Informed to safety supervisor. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Act | Lack of Supervision | Near furnace area, due to unavailability of rest shed, M/s DEL workers were found sitting on floor. Informed to safety supervisor. | Plant Area | Furnace Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Work at Height | Near pump gallery, scaffolding loaded trolley was found without wheel chowk. Closed | Plant Area | Near Pump Gallery | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-06-19 | Unsafe Act | Work at Height | At Tank #04, M/S IIW worker was found working on the top platform without hooking his safety harness. | Tank Farm | At Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-30 |
| 2025-08-17 | Unsafe Act | Procedure | At Gate 3, one worker of M/s AG was found wearing a metallic button coverall, and his medical and safety orientation had not been conducted. He was handed over to Mr. Shahzad of M/s WMS for medical and safety orientation. | Plant Area | Gate 3, | Stationary | CONTRACTOR | AG | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-18 | Unsafe Act | Electrical | At PC 314 LPG line hot job, electric cold cutter and grinder found without electrical inspection tag. | Plant Area | At PC 314 LPG | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2026-01-22 | Unsafe Act | Procedure | At tank #56, During crane operation AJC welder and worker movement in under crane boom barrication area. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-01-30 |
| 2026-01-22 | Unsafe Act | Work at Height | At tank #56, Safety harness SH-5 lan-yard hook was damaged and being used on height. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-01-30 |
| 2026-01-28 | Unsafe Condition | Procedure | Tank # 56: During lux monitoring, inadequate lighting was observed at several locations, resulting in poor visibility. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-01-30 |
| 2026-01-28 | Unsafe Condition | Procedure | Tank #11: During sand blasting activity, workers were exposed to high noise levels without using hearing protection (ear plugs). ATL | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-01-30 |
| 2026-01-28 | Unsafe Condition | Work at Height | Tank # 04: Sharp edges were observed on scaffolding pipes during cutting activity, posing cut hazards. IIW | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-30 |
| 2026-01-28 | Unsafe Condition | Procedure | Tank # 04: Workers’ rest shelter was not provided at the work site. IIW | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-30 |
| 2026-01-28 | Unsafe Condition | Procedure | Tank # 35: Authorized compactor operator (DDC/ 3rd party certificate) was not available during compaction activity. IIW | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-30 |
| 2026-01-28 | Unsafe Condition | Equipment | Tank # 35: Generator shelter/shade was not installed, exposing equipment to environmental conditions. IIW | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-30 |
| 2026-01-30 | Unsafe Condition | Procedure | At Boiler No. 4, a painter from M/s UE was working inside a confined space while the SBM was present at another location. When the SBM was called, it was observed that, according to his checklist, the entry for the person working inside had already been recorded as “out”. | Plant Area | Boiler No. 4 | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Housekeeping | Tank # 11: Poor housekeeping observed around tank yard, with debris (such as feathers) scattered in the area. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Electrical | Tank # 11: The weather protection cover for the Electrical DB is faulty and needs replaced. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Electrical | Tank # 11: Battery terminal boot of air compressor was not properly fixed. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Environment | Tank # 11: Oil leakage was observed from the breathing air compressor. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Electrical | Tank # 11: The scaffolding structure used for placing welding rectifiers was found without proper earthing and the scaffolding tag was also missing. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Falling Object | Tank # 04: Iron rods extracted from the demolished dyke wall have been kept on the ground and need to be removed. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Work at Height | Tank # 04: Scaffolding pipes were placed in the walking way, need to be removed. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Slip/Trip/Fall | Tank # 04: The D-door was kept inside the working area, which could cause a tripping hazard and needs to be removed. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Slip/Trip/Fall | Tank #11: It was observed that the air compressor in use had a punctured tire. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | PPE | Tank #04: It was observed that M/s IIW workers coveralls were dirty and without proper reflective strips. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-30 | Unsafe Condition | Procedure | Tank #35: The scaffolding structure for the 25 kVA generator was found without a valid inspection tag. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-05 |
| 2026-01-29 | Unsafe Condition | Procedure | Tank #56: It was observed that during late-hour activities, the paramedic of M/s AJC was usually not available at the site. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2025-08-16 | Unsafe Act | PPE | At rood 07, one of the M/s WMS worker was working on the LPG pipeline without wearing safety gloves, informed to supervisor to ensure no task on LPG pipeline is carried out without complete PPE. | Plant Area | At road #07 | Stationary | CONTRACTOR | WMS | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-16 | Unsafe Act | Lack of Supervision | At 105- C3,two fitters of M/s UE were performing light lifting work in an area that was not barricaded, informed supervisor and instructed to Area fully barricaded and secured. | Plant Area | At 105- C3 | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-16 |
| 2025-08-16 | Unsafe Act | PPE | At cooling tower, two workers were lifting a GI sheet without wearing safety gloves, informed to supervisor. | Plant Area | At Cooling Tower | Civil | CONTRACTOR | WMS | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-16 | Unsafe Act | Electrical | At below area of reactor, PRL lab staff was found using battery operated equipment (digital stopwatch) without tagging it from electrical department. | Plant Area | At Below Area of Reactor | Lab | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-16 | Unsafe Condition | Work at Height | At road 10, scaffolding material loaded trolley was found parked with wheel chowks. Counseling done. | Plant Area | At Road# 10 | Civil | CONTRACTOR | AKS | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-16 | Unsafe Act | Procedure | At road 10, M/s AKS workers were found wearing coverall having no reflective tape. | Plant Area | At Road# 10 | Stationary | CONTRACTOR | AKS | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-16 | Unsafe Act | Work at Height | Near LPG header, M/s WMS worker was found working on red tag scaffolding platform. Counseling done. | Plant Area | Near LPG Header | Stationary | CONTRACTOR | WMS | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-16 | Unsafe Condition | Procedure | At heat exchanger area, pallet and spading plate were found on walkway. Counseling done. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-16 | Unsafe Condition | Vehicle | At DEL yard, one locked truck was observed parked without wheel chocks, with no driver and key available on site. | Plant Area | At DEL yard | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-16 | Unsafe Condition | Work at Height | At DEL yard, scaffolding structure for gas cylinders storage area was found without scaffolding tag. | Plant Area | At DEL yard | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-16 | Unsafe Act | PPE | At 106-C, one of the M/s AKS worker was using a monkey ladder without wearing safety gloves and googles, counseling done. | Plant Area | At 106-C | Civil | CONTRACTOR | AKS | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-16 | Unsafe Act | Procedure | Near WBL, M/s AKS worker was found wearing damaged safety shoes. Counseling done | Plant Area | Near WBL | Stationary | CONTRACTOR | AKS | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-16 | Unsafe Act | Work at Height | At 105-C3, M/s DEL worker was found working on scaffolding platform with hooking his harness. Counseling done | Plant Area | At 105-C3 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-16 | Unsafe Condition | Work at Height | Near -101-B and 101-C, sharp edges MS plates and scaffolding material were placed in the area without barrication. Counseled the team and instructed to barricade the area. | Plant Area | Near -101-B and 101-C | Civil | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-08-17 |
| 2025-08-17 | Unsafe Condition | Work at Height | At 302-B scaffolding pipes were placed in the area without barrication. Counseled the team and instructed to barricade the area. | Plant Area | At 302-B | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Work at Height | At 105-C3, during lifting the material at height by UE team the area was not barricaded, and poor housekeeping was observed. Counseled the team and instructed to barricade the area. | Plant Area | At 105-C3 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-02-01 | Unsafe Act | Procedure | At tank#56, During crane operation electrical team and unnecessary persons were moving under barricaded area. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2025-08-17 | Unsafe Condition | Procedure | SIMOP activity was observed at plant corridor was observed. Counseled the team. | Plant Area | Plant Corridor | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-02-01 | Unsafe Act | PPE | At tank#56, AJC electrician was found working on electric supply board without gloves. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2025-08-17 | Unsafe Condition | Slip/Trip/Fall | At plant corridor, steaming pipeline was laying on floor which have potential of tripping hazard. Informed to site supervisor. | Plant Area | At Plant Corridor | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-02-01 | Unsafe Act | Electrical | Damaged electric board# 11 was being used inside tank platform by AJC electrician . Electrical Bord was removed from site . | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2026-02-01 | Unsafe Act | Procedure | During crane operation AJC helper was moving under barricading area. Helper counseling was done. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2026-02-01 | Unsafe Condition | Housekeeping | At KT, Poor housekeeping was observed. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2026-02-01 | Unsafe Condition | Electrical | AJC welding machine #13 was being used without earthing. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2025-08-16 | Unsafe Act | Work at Height | At 105-C3, one of the M/s WMS worker was handling tools without wearing safety gloves ,consoling and informed to supervisor. | Plant Area | At 105-C3 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-16 | Unsafe Act | PPE | At 105-C3, one of the M/s UE worker was using a monkey ladder without wearing safety gloves, informed to supervisor and immediately wearing a safety gloves. | Plant Area | At 105-C3 | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2026-07-10 | Unsafe Act | Procedure | At 105-C3, UE workers were lifting the material and tools without using tool bag. Counseled the worker. | Plant Area | At 105-C3 | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-16 | Unsafe Condition | Work at Height | At 101-B, scaffolding plank was not tie with steel wire. Counseled the worker. | Plant Area | At 101-B | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2026-02-07 | Unsafe Condition | Procedure | At tank #56, gas cutting cylinders were improperly chained and not identified as full or empty at storage place. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2025-08-16 | Unsafe Act | Work at Height | At 102-C, scaffolder was not hooked his harness properly. (Hooked both lanyard in single pipe). Counseled the worker. | Plant Area | At 102-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2026-02-07 | Unsafe Condition | Equipment | At tank #56, the 100 KVA generator dip tray was found missing at the site. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-02-07 | Unsafe Condition | Electrical | At tank #56, a damaged electrical extension board insulation was observed during hot work inside the tank. Immediately removed from the site. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2025-08-16 | Unsafe Condition | PPE | At plant area, M/s DEL worker were loading scaffolding material on trolley without place the wheel stopper. Counseled the team. | Plant Area | At Plant Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2026-02-07 | Unsafe Condition | Electrical | At tank #56, tool bags were not used while working at height during shell fit-up activities. Counseling done and instructed to bring the tool bag. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-02-07 | Unsafe Condition | PPE | At tank #56, workers were observed not using KN-95 face masks during welding, back grinding, and related activities. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-02-07 | Unsafe Act | Procedure | At tank #56, personnel were observed working under suspended loads, creating a line-of-fire hazard during crane operations. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2025-08-16 | Unsafe Condition | Electrical | At 801-J, during hot work earthing cable found lose. Informed to site supervisor. | Plant Area | At 801-J | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2026-02-07 | Unsafe Act | Work at Height | At tank #56, workers were found working on scaffolding without properly hooked safety harnesses during crane and hot work activities. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-02-16 | Unsafe Act | PPE | Tank #35 – During civil work activity, one worker was observed not wearing safety gloves. Counseling was provided. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-16 | Unsafe Act | Work at Height | Tank #04 – During scaffolding erection, a 20-foot pipe was being handled by a single person, which is a manual handling violation. Counseling was provided. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-16 | Unsafe Act | Work at Height | Tank #04 – During erection of scaffolding, workers were not using a tool bag/bucket while working at height. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-16 | Unsafe Act | PPE | Tank #11 – During power brushing activity, one worker was observed not wearing a face mask. Counseling was provided. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Condition | Procedure | At laydown area: The removed heat exchanger tubes were not properly stacked. | Tank Farm | laydown area | Stationary | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Condition | Procedure | At laydown area: The M/s UE fire extinguisher was found with low pressure and without a refilling/expiry date and without a monthly inspection tag. | Tank Farm | laydown area | Stationary | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Act | PPE | At Tank#11: M/S ATL worker was found wearing low ankle shoes | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Condition | Housekeeping | At Tank#11: Poor housekeeping was observed. The area needs to be cleaned. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Condition | Procedure | At tank#11: Dustbins were found full and need to be emptied. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2025-08-16 | Unsafe Condition | Housekeeping | At location 801-J, poor housekeeping was observed, various tools were scattered on the floor, welding and power cables were left unmanaged during hot work activities. This condition poses a potential tripping hazard. | Plant Area | At Location 801-J | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2026-02-11 | Unsafe Condition | Procedure | The cylinder kept in the M/s IIW ambulance was found embossed as “Nitrogen”. Additionally, the hydrostatic test date was not visible on the cylinder. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2025-08-16 | Unsafe Condition | Procedure | At M/s DEL yard, after sunset crane operation was performing without any light arrangements. | Plant Area | At M/s DEL yard | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2026-02-11 | Unsafe Condition | Procedure | At the front side of the storm pit, an open pit was found that needs to be covered. | Plant Area | Storm Pit | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2025-08-16 | Unsafe Condition | Vehicle | Near JP 1 gantry (DEL Office Area), Two locked trucks were observed parked without wheel chocks, with no drivers or keys available on site. | Plant Area | Near JP 1 gantry | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-16 | Unsafe Act | Electrical | Near JP 1 gantry (DEL Office Area), two energized electrical distribution boards (DBs) were found having no PRL’s electrical inspection tags. | Plant Area | Near JP 1 gantry | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2026-02-11 | Unsafe Condition | PPE | At Tank #35 Yard, during excavation work, most M/s IIW workers were found without wearing dust masks in a dusty environment. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Condition | Procedure | The first aid kit was not available in the M/s IIW ambulance. | Tank Farm | IIW Ambulance | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Act | Work at Height | At the M/s IIW Yard, workers were found sitting on the pipes of a red-tagged scaffolding structure. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Act | PPE | At the DEL Yard, M/s DEL worker was found working without a safety helmet and most workers were found without wearing safety goggles. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Condition | Procedure | At the DEL Yard, M/s DEL workers were found wearing coveralls not approved by PRL, having metallic buttons. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Condition | Environment | At Road #7, the waste yard was found overfilled and needs to be cleaned | Plant Area | Road #7 | Stationary | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Condition | Work at Height | At the Heat Exchanger area, scaffolding pipes were placed on the walkway without barrication. | Plant Area | Boiler No. 4 | Civil | CONTRACTOR | AKS | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Act | Work at Height | At Gantry substation: M/s QK Builders were working inside a confined space without following the confined space protocol. Furthermore, no ladder was provided for safe entry or exit. | Tank Farm | Gantry Substation | Civil | CONTRACTOR | QK | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2025-07-29 | Unsafe Condition | Procedure | Tank # 51 fire wall crack on different location. Need to be repair. | Tank Farm | Tank # 51 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-30 |
| 2025-07-29 | Unsafe Condition | Procedure | Foam tank 2900ltr main valve rusty need clean & paint requit | Tank Farm | Foam Tank | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-30 |
| 2025-07-29 | Unsafe Condition | Procedure | Foam tank 2900 & 5330ltr foundation crack. Need concrete wall/foundation requit. | Tank Farm | Foam Tank | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-30 |
| 2025-07-29 | Unsafe Condition | Procedure | Foam skid pump & circulation motor Centre area concrete floor need to be repaired. | Tank Farm | Foam Skid Pump | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-30 |
| 2025-07-29 | Unsafe Condition | Procedure | Fire wall Tank # 51 & 63 sub-surface Hyderant need paint. | Tank Farm | Tank # 51 & 63 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-31 |
| 2025-07-29 | Unsafe Condition | Procedure | Isolation valve # 3 (Road # 4) & tank # 62 by-pass valve need paint. | Tank Farm | Road # 4 & tank # 62 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-31 |
| 2026-02-17 | Unsafe Condition | Procedure | At backside of control room: M/s smart climate worker was observed wearing low-ankle footwear and failing to wear his coverall properly. | Plant Area | Backside of Control Room | Electrical | CONTRACTOR | Smart | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2025-07-29 | Unsafe Condition | Procedure | Concrete plate form required in front of tank # 59 manifold. | Tank Farm | Tank # 59 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-31 |
| 2025-07-29 | Unsafe Condition | Procedure | Hydrant # 1 concrete plat form need to be repair. | Tank Farm | Hydrant # 1 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-30 |
| 2026-02-17 | Unsafe Act | PPE | At DEL Yard: One worker was not wearing safety goggles. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-17 | Unsafe Act | PPE | At Tank #35: During stone compaction activities, the roller operator was not wearing safety goggles. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-17 | Unsafe Act | Work at Height | At Tank #04: During scaffolding work at height, one scaffolder was not using a tool lanyard (tool tie). | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-17 | Unsafe Act | PPE | At Tank #11: During vacuum testing at the tank bottom, two workers were not using rubber gloves. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-17 | Unsafe Act | PPE | At gate #3. M/s DEL vehicle (LZJ-9227) was operated by a driver without a valid DDC certification. Furthermore, the vehicle’s spark arrestor was found to be substandard, the vehicle was not equipped with a reverse alarm and the fire extinguisher was expired. | Gate # 03 | Gate #3 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-17 | Unsafe Condition | Housekeeping | At ATL Yard: A gas cylinder was stored upright without being secured by a safety chain. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-17 | Unsafe Condition | Housekeeping | At ATL Yard: Multiple filled diesel cans were found stored directly on the ground instead of within a designated secondary containment area. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2025-07-31 | Unsafe Condition | Equipment | Skid generator concrete foundation damage. Need repair. | KOR Refinery | Skid Generator Area | Stationary | PRL | | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2026-02-21 | Unsafe Condition | Procedure | At tank 56, AJC Muneer rigger safety shoes was found damage inform to AJC shahid. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-27 |
| 2025-07-31 | Unsafe Act | PPE | At tank #05, a scaffolder was observed wearing damaged gloves. Informed the site supervisor. | Plant Area | Tank #05 | Civil | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2025-07-31 | Unsafe Act | PPE | At tank #05, a worker was observed with mask within the premises of sand blasting activity. Woker was counseled. | Plant Area | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2026-02-21 | Unsafe Condition | Procedure | At tank 56, AJC One electric board's insulation was damaged. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-27 |
| 2025-07-31 | Unsafe Act | Vehicle | At tank #05, a truck was observed blocking the firefighting equipment. Informed the site supervisor. | Plant Area | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2026-02-21 | Unsafe Act | Work at Height | At tank 56, AJC worker was found walking on third shell platform without properly hooked harness walk on third shell platform | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-27 |
| 2025-07-31 | Unsafe Condition | Electrical | At tank #05, the earthing wire of the fresh air compressor was not attached properly. Informed the site supervisor. | Plant Area | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2025-07-31 | Unsafe Act | Housekeeping | At tank #05, an energized grinder was observed on the ground and was not placed on grinder stand. Informed the site supervisor. | Plant Area | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2025-07-31 | Unsafe Condition | Lack of Supervision | At tank #05, combustible material (dried bushes) was observed within the premises of hot work and smoke was also observed. Informed and instructed the site supervisor to remove the combustible material." | Plant Area | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2025-07-31 | Unsafe Act | Work at Height | At tank #11, a worker was observed working on the scaffolding platform with both the lanyards of the harness attached to the same pipe. Worker was counseled. | Plant Area | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2026-02-25 | Unsafe Act | Environment | At decanting area: it was observed that waste bin is overflowing, needs to be cleaned. | Tank Farm | Decanting Area | Logistic | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-27 |
| 2026-02-25 | Unsafe Act | Vehicle | At decanting area: PRL staff and bowser driver were found walking on the bowser without wearing a safety harness. Counseling done. | Tank Farm | Decanting Area | Logistic | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-27 |
| 2026-02-28 | Unsafe Condition | Housekeeping | DEL Yard – Improper storage and segregation of oxygen and DA cylinders; cylinders not secured with chains. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-05 |
| 2026-02-28 | Unsafe Condition | Procedure | Tank #35 – Excavator operating without functional swing alarm. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-05 |
| 2026-02-28 | Unsafe Condition | Procedure | Tank #04 – Hot work area not properly covered and clean as per procedure during gas cutting. immediately as per procedure clean and covered gas cutting area. Close | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-05 |
| 2026-02-28 | Unsafe Condition | Vehicle | Tank #11 – Ambulance driver was engaged in material loading using another vehicle inside the tank yard, and no backup ambulance driver was available on duty. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-05 |
| 2025-07-31 | Unsafe Condition | Electrical | At tank #11, the insulation of the earthing wire of the welding machine was observed damaged. Informed to site supervisor. | Plant Area | Tank #11 | Stationary | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2025-07-31 | Unsafe Condition | Electrical | At storm water pit, a damaged electrical extension board was observed on site. Informed the site supervisor. | Plant Area | At Storm Water Pit | Stationary | CONTRACTOR | RE | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2025-07-31 | Unsafe Condition | Electrical | At storm water pit, an uninsulated joint in the earthing wire was observed, lacking proper taping or insulation. Informed the site supervisor. | Plant Area | At Storm Water Pit | Construction | CONTRACTOR | RE | Routine | | Korangi Refinery | | Closed | | 2025-08-01 |
| 2025-08-01 | Unsafe Act | PPE | At tank #05, M/S ATL worker was observed working while wearing torn gloves. Informed and instructed the site supervisor to get it replaced with new gloves. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-02 |
| 2025-08-01 | Unsafe Act | Work at Height | At tank #11, M/S ATL workers were observed working parallel on the scaffolding platform during plates fit up activity. Informed the site supervisor and counseled the workers. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-02 |
| 2025-08-01 | Unsafe Act | PPE | At tank #05, M/S ATL worker observed working without safety gloves and folded sleeves. The worker was counseled down. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-02 |
| 2025-08-01 | Unsafe Condition | Procedure | At road #07, cracks were observed on the steps of the walkway. Please take necessary corrective actions. | Plant Area | At Road #07 | Civil | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2025-08-02 |
| 2025-08-01 | Unsafe Condition | Lack of Supervision | At storm water pit, the trolley of the gas cutting set was observed rusted and corroded. Informed the site supervisor. | Plant Area | At Storm Water Pit | Stationary | CONTRACTOR | RE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-02 |
| 2026-02-28 | Unsafe Act | PPE | Tank #11 – Workers handling MS plates without proper rigging gloves counselling done. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-05 |
| 2026-02-28 | Unsafe Condition | Procedure | Tank #11 – Workers found inside confined space without standby man. counselling done. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-05 |
| 2026-02-28 | Unsafe Condition | Housekeeping | Poor housekeeping found inside tank#56 inform to AJC (HSE supervisor) Osama and removed all combustible materials. (Close) | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-03-05 |
| 2026-02-28 | Unsafe Condition | Electrical | A welding rectifier was observed without earthing and bonding. Electrician were asked to install the same. (Close) | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-03-05 |
| 2025-08-01 | Unsafe Condition | Equipment | At storm water pit, the generator tire was observed burst. Informed the site supervisor. | Tank Farm | At Storm Water Pit | Stationary | CONTRACTOR | RE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-02 |
| 2026-07-09 | Unsafe Condition | Procedure | Electric board #12 are found insulation damage inform to AJC electrician . (closed) | Plant Area | At 202 Air Cooler | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-01 | Unsafe Act | Housekeeping | At tank #05, M/S ATL worker was observed wearing damaged safety shoes. Informed and instructed the site supervisor to get it replaced with new shoes. | Plant Area | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-02 |
| 2025-08-09 | Unsafe Act | Equipment | Welding Supervisor Changed The Grinder Disc Without Disconnected From Safetigal. | Plant Area | Plant Area | Stationary | CONTRACTOR | AJC | Shutdown | | Kemari Terminal | | Closed | | 2025-08-10 |
| 2026-03-06 | Unsafe Condition | Procedure | Road No. 01: M/s RE workers were observed sitting on the road due to the unavailability of a designated rest shade. | Tank Farm | Road No. 01 | Construction | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-06 | Unsafe Condition | Procedure | Road No. 01: M/s RE rigger was found using damaged gloves. | Tank Farm | Road No. 01 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-06 | Unsafe Condition | Vehicle | Road No. 01: an approximately 20-ft pipeline was being shifted using a forklift without securing it with belts, which may lead to collapse. Counseling done. | Tank Farm | Road No. 01 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2025-08-09 | Unsafe Condition | Equipment | Miller Machine Also Found Without Earthing Wire. | KT | KT | Stationary | CONTRACTOR | AJC | Shutdown | | Kemari Terminal | | Closed | | 2025-08-10 |
| 2026-03-03 | Unsafe Condition | Equipment | At DEL Yard, a generator was lifted by forklift under unsafe conditions, with an unbalanced suspended load striking the forklift. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-03 | Unsafe Condition | PPE | At DEL Yard, a worker was observed wearing safety shoes not approved by PRL. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-03 | Unsafe Condition | Work at Height | At Tank #21, the scaffolding walkway was observed without an inspection tag. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2025-08-08 | Unsafe Act | PPE | 3 person of civil worker folding was erecting roof top of office building without safety goggle. Counseling was done. | KOR Refinery | KOR Refinery | Stationary | CONTRACTOR | AJC | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-10 |
| 2026-03-03 | Unsafe Condition | Work at Height | At Tank #21, the workers’ rest area was incomplete and without required scaffolding inspection tag. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-03 | Unsafe Condition | Electrical | At Tank #21, the welding electrode oven was found without an electrical inspection tag and was immediately reported to the HSE Lead for replacement. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-03 | Unsafe Act | Work at Height | At Tank #15, the Civil UE team was observed working at height in unsafe position. | Tank Farm | Tank #15 | Civil | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2025-08-08 | Unsafe Act | Procedure | During grinding works a fitter was observed having covered his face with clothes. Advised him to remove it while doing hot works. | KT | Tank Farm | Stationary | CONTRACTOR | AJC | Shutdown | | Korangi Refinery | | Closed | | 2025-08-09 |
| 2025-08-08 | Unsafe Condition | Electrical | Electrical extension board # 13 damaged receptacle was replaced with new one. | KT | KT | Stationary | CONTRACTOR | AJC | Shutdown | | Korangi Refinery | | Closed | | 2025-08-09 |
| 2026-03-05 | Unsafe Condition | Work at Height | Tank #04 (IIW): during scaffolding pipe cutting, the activity was obstructing workers using the walkway. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-05 | Unsafe Condition | PPE | Tank #04 (IIW): during cutting work inside the tank, two riggers were observed not wearing face masks. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2025-08-07 | Unsafe Act | Lack of Supervision | At tank#05, during sandblasting activity, the required safe distance was not maintained, the workers were instructed to maintain and clearly mark the safe distance during sandblasting operations informed site supervisor " | Tank Farm | Tank #5 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-08 |
| 2026-03-05 | Unsafe Condition | Procedure | Tank #04 (IIW) : during gas cutting work, gas cutter hose was found without proper double isolation (metallic flexible hose pipe). | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2025-08-07 | Unsafe Condition | PPE | At tank#05, main entrance door was blocked, informed to HSE supervisor and obstruction was removed, and the main entrance was cleared for safe access. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-08 |
| 2026-03-09 | Unsafe Condition | Health | Tank #30 – M/S DEL: Worker rest shade was not available at the work site, which is required for worker welfare and heat stress control. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-04 | Unsafe Act | Procedure | At Tank #05, a fitter was observed not wearing over-glasses during the task. The concerned person was informed and instructed to wear proper eye protection. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-09 | Unsafe Condition | Procedure | Tank #30 – M/S DEL: During main shell plate cutting activity, the HSE representative was not present at the work site. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-09 | Unsafe Condition | Electrical | Tank #21 – M/S DEL: Fire extinguisher was not available at the main electrical distribution board, which is a critical safety requirement. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-09 | Unsafe Act | PPE | Tank #21 – M/S DEL: A gas cylinder trolley was moving over the red-tagged scaffold walkway, which is an unsafe practice and must be stopped immediately. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-09 | Unsafe Condition | Housekeeping | Tank #21 – M/S DEL: Gas cylinder shade in the classified zone was found incomplete, requiring immediate completion to ensure safe storage. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-04 | Unsafe Condition | Procedure | At Tank #05, two fabrication teams were performing parallel hot work activities in the same area. It was advised to ensure proper coordination, implement adequate safety measures. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-09 | Unsafe Act | Housekeeping | ATL Yard – M/S ATL: A worker was observed moving in the ATL yard without a safety helmet; the worker was immediately counseled on PPE compliance. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-09 | Unsafe Act | PPE | Tank #04 – M/S IIW: During firewater line excavation, workers were found using damaged safety gloves and not wearing face masks | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-04 | Unsafe Condition | Slip/Trip/Fall | At tank #11, the 60 kVA generator at Tank No. 11 was repeatedly tripping during operation. The issue was reported to the maintenance team and concerned supervisor for immediate inspection and necessary corrective. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-13 | Unsafe Condition | Housekeeping | At Tank #30, M/S,DEL ,the HSE person was not regularly present, housekeeping was poor, and a worker performing gas cutting was not using a mask. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-13 | Unsafe Condition | Housekeeping | At the DEL yard, M/S,DEL, during crane operation four riggers were present but the required third-party rigger was not available. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-04 | Unsafe Condition | Housekeeping | At Tank #05, Hot work canopy contained grass and combustible materials, posing a potential fire hazard. The area was immediately cleared of all combustible materials, and housekeeping was carried out. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-13 | Unsafe Condition | Work at Height | At Tank #04, M/S,IIW, a G.I. sheet used for work at height was found lying unsecured and not properly tied. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-13 | Unsafe Condition | Slip/Trip/Fall | At Tank #04, M/S,IIW ,a walkway coupling was lying on the walkway creating a tripping hazard. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-13 | Unsafe Condition | Slip/Trip/Fall | Tank #30: M/S,DEL, Poor housekeeping observed inside the tank area and no worker rest shade was provided at site. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-13 | Unsafe Condition | Work at Height | Tank #04: M/S,IIW, Modified walkway scaffolding platform was found without re-inspection and re-tagging after alteration. | Tank Farm | Tank # 4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-04 | Unsafe Act | PPE | At Tank #05, workers were not wearing N-95 masks during power brushing and housekeeping activities. Work was stopped immediately, and the workers were instructed to wear appropriate respiratory protection (N-95 masks). | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-13 | Unsafe Condition | Slip/Trip/Fall | Tank #11: M/S,ATL, during hot work activity, an electrical power tool was left inside the tank bottom, creating a potential tripping hazard. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-13 | Unsafe Condition | Procedure | Tank #11:M/S,ATL, during gas cutting activity, gas cylinders were found without a protective shade at the tank yard. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-04 | Unsafe Condition | PPE | At tank #05, Grinder No. 32 (5-inch) suddenly stopped working during operation. The equipment was handed over to the relevant electrician for immediate inspection and necessary repair. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-13 | Unsafe Condition | Procedure | At Road No. 14 – M/S Construction & IIW: Civil excavation work of around 5 ft depth was observed without a valid Confined Space Certificate and required safety protocols. | Tank Farm | Road No. 14 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-13 | Unsafe Condition | Procedure | At Road No. 16 – M/S Construction: Civil excavation of approximately 5 ft depth was in progress without issuing a Confined Space Certificate and required safety protocol implementation. | Tank Farm | Road No. 16 | Construction | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-04 | Unsafe Act | PPE | At tank #05, During the dismantling of scaffolding inside Tank No. 05, it was observed that the worker was not wearing an N-95 mask, which is required for respiratory protection in confined spaces and dusty environments. The worker was immediately instructed to stop work and wear the required N-95 mask. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-16 | Unsafe Condition | Vehicle | DEL Yard: M/s DEL. MS plate was observed shifting with a forklift without proper tying/securement, creating an unsafe lifting activity. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-04 | Unsafe Act | PPE | At tank #05, During the vacuum test on Tank No. 05 Today, the workers were handling oil and chemicals without wearing the appropriate protective gloves. Informed construction representative and HSE supervisor. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-16 | Unsafe Condition | Procedure | Tank #30: M/s DEL. HSE representative was not present at the work site during ongoing activities. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-16 | Unsafe Condition | Slip/Trip/Fall | Tank #21: M/s DEL. Dismantled MS plate of tank 21 was lying at the tank main entrance creating a tripping hazard. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-16 | Unsafe Act | PPE | Tank #21: M/s DEL. Worker performing internal cutting work at the tank bottom was not wearing a face mask. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-16 | Unsafe Condition | Procedure | Tank #04:M/s IIW. Dismantled MS plate of tank 04 was found without proper barrication inside the tank yard. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2025-08-05 | Unsafe Act | Electrical | At Tank #05, two workers were wearing damaged coveralls. Informed Bilal HSE Officer and They were advised to replace the damaged PPE immediately to maintain safety standards. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-05 |
| 2026-03-17 | Unsafe Condition | PPE | At Tank #30, A critical unsafe act was observed involving the Rotary team manually handling an electrical pump (approx. 100 kg) from the tank yard to the road. The task was performed without proper lifting equipment or appropriate rigging gloves. | Tank Farm | Tank #30 | Rotary | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-17 | Unsafe Act | Procedure | At Road No. 01(M/S DEL), a Descon crane was observed moving without a flagman. | Tank Farm | Road No. 01 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-04 | Unsafe Act | Electrical | At tank #05, ATL electrician was on leave, and in his absence, the electrical work was carried out by an electrician helper. The helper was not approved by the PRL Electrical Department, and no job card was issued for the task. Informed HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-17 | Unsafe Condition | Electrical | At DEL Yard (M/S DEL), the electrical distribution board (D.B.) was found without a protective shade. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-17 | Unsafe Condition | Equipment | At Tank #30, (M/S DEL), during hot work activities using grinders/millers, no shade was available for the workers. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-17 | Unsafe Condition | Procedure | At Tank #11, (M/S ATL), an excavation area was observed without proper barricading. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-05 | Unsafe Act | PPE | At Tank #11, a worker was hammering without using a tool tie. Worker was instructed to use tool tie to prevent dropped object hazards. | Plant Area | At Tank #11 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-17 | Unsafe Condition | Procedure | At Tank #11 (M/S ATL), during the safety round and site closing, some materials were found not properly barricaded. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-05 | Unsafe Act | PPE | Tt tank #05, C-channel was observed being lifted with a rope and gripped incorrectly, instructed to use proper lifting methods and correct grip point" | Tank Farm | Tt Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2026-03-18 | Unsafe Condition | Work at Height | At Road#0 near Gantry Area: The welding electrode desiccator's cable gland and lux were not in good condition and need to be replaced. | Tank Farm | Road#0 | Logistic | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-05 | Unsafe Act | Lack of Supervision | At Tank #11, two fire extinguishers of ATL had not been inspected for the past 2 months, informed HSE supervisor and immediate inspection was advised" | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-06 |
| 2026-03-18 | Unsafe Condition | PPE | At Road#0 near Gantry Area: A worker from M/s UE was using a grinder while wearing a welding face shield instead of a proper grinding shield and he was also not wearing a safety helmet. | Tank Farm | Road#0 | Logistic | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-05 | Unsafe Act | Work at Height | At tank #05, during mechanical work on shell no.2, a scaffolder was modifying the same platform on which the work was being carried out, inform to site HSE supervisor ensure proper coordination. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-06 |
| 2026-03-19 | Unsafe Condition | Work at Height | At tank # 35-yard and M/s IIW yard , partition wall of corrugated sheet and scaffolding structure have been collapsed due to the recent thunderstorm, needs to be secured | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-19 | Unsafe Condition | Work at Height | At tank # 11, the soil around the scaffolding base plate has been excavated and removed, which may compromise the stability of the structure. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-07-10 | Unsafe Condition | Environment | A product line running from Tank 38 to Tank 01 had leakage from a valve, causing product dropping, inform Mr. Ijaz PRL(oil movement) The leaking valve was immediately reported to the concerned department, and the line was secured to prevent further spillage. | Tank Farm | Tank 38 | OM KT | PRL | | Shutdown | | Korangi Refinery | | Closed | | 2025-08-08 |
| 2026-03-19 | Unsafe Condition | Procedure | At tank # 11, contractor safety sign board has been fell on the ground, needs to be re-fix and secure the safety board. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-08 | Unsafe Condition | Procedure | At road #0, a PSO oil tanker, which arrived for fuel filling, was blocking the fire hydrant on informed HSE department and remove oil tanker. | KOR Refinery | At Road #0 | Logistic | CONTRACTOR | OMC | Shutdown | | Korangi Refinery | | Closed | | 2025-08-09 |
| 2026-03-19 | Unsafe Condition | Housekeeping | At material storage area near the construction workshop, several corrugated sheets have become detached and are currently lying on the ground. These sheets need to be properly secured to prevent them from being blown away by strong winds and to avoid the risk of injury to personnel. | Construction Workshop | Material Storage Area | Construction | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-19 | Unsafe Condition | Housekeeping | At Road 16, CCTV camera cables have been detached and lying on ground due to the recent thunderstorm, needs to be secured to prevent further damage. | Tank Farm | Road No. 16 | A&S | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-07 | Unsafe Act | Procedure | At road no#16 ,a worker was using a mobile phone, inform to Mr. Usman and the worker was instructed to avoid mobile usage in operational areas and counseled on safety protocols. | KOR Refinery | At Road #16 | Construction | CONTRACTOR | OMC | Routine | | Korangi Refinery | team | Closed | | 2025-08-09 |
| 2026-03-19 | Unsafe Condition | Falling Object | At Road 12, the pipeline is resting on temporary supports with stones used as wedges. Proper wedges must be installed to prevent the pipeline from falling. | Tank Farm | Road No. 12 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-25 | Unsafe Condition | PTW | At IIW Yard, M/S IIW, work was being carried out without a valid work permit and no safety personnel or paramedic were present on site | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-08 | Unsafe Condition | Environment | Tank # 56 100kva diesel generator during operation radiator leakage was noticed. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Shutdown | | Kemari Terminal | | Closed | | 2025-08-09 |
| 2026-03-25 | Unsafe Condition | Equipment | At DEL Yard, M/S DEL, Inadequate weather protection observed for MS plate rolling and winch machine motors. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-25 | Unsafe Condition | Slip/Trip/Fall | At ATL Yard, M/S ATL, Oxygen cylinders were found tilted, posing a falling hazard. Furthermore, the entrance to the storage area was blocked. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-08 | Unsafe Act | Procedure | At tank#05, during the lifting operation, one rigger was holding the suspended load by hand, informed rigging supervisor and Instruct riggers to use tag lines and avoid holding suspended loads by hand during lifting operations | Tank Farm | Tank #05 | Stationary | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | Ahsan | Closed | | 2025-08-09 |
| 2026-03-25 | Unsafe Act | PTW | At ATL Yard, M/S ATL, a 25 KVA generator was observed in operation without a valid Work Permit. Furthermore, both the Safety Officer and the ambulance driver were absent. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-09 | Unsafe Condition | Equipment | Welding Machine, No (01,08,03) Found Without Earthing Wire. | KT | KT | Stationary | CONTRACTOR | AJC | Shutdown | | Kemari Terminal | | Closed | | 2025-08-10 |
| 2026-03-25 | Unsafe Condition | PTW | Tank #30, M/S DEL, the rest area roof is currently uncovered. Please install a cover to provide shade and protect workers from the sun. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-25 | Unsafe Condition | Procedure | At Tank #30, M/S DEL, the metal plate at the main tank entrance has sharp edges that need to be protected. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2025-08-09 | Unsafe Condition | Electrical | Electrical Board No (03) Found Safetigal Wire Without Protection. | KT | KT | Stationary | CONTRACTOR | AJC | Shutdown | | Kemari Terminal | | Closed | | 2025-08-10 |
| 2025-08-09 | Unsafe Condition | Electrical | Electrical Board No (12) Found With Without Nuts. | KT | KT | Stationary | CONTRACTOR | AJC | Shutdown | | Kemari Terminal | | Closed | | 2025-08-10 |
| 2026-03-26 | Unsafe Condition | PPE | At DEL Yard (M/S DEL), two workers were observed moving in the yard without wearing safety helmets. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-08-08 | Unsafe Condition | Lack of Supervision | At tank#05, the distance between the three blasters during blasting operations was too short, informed to HSE supervisor and site supervisor maintain safe distance as per OSHA standard. | Tank Farm | Tank#05 | Stationary | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-10 |
| 2026-03-26 | Unsafe Condition | Lack of Supervision | At ATL Yard (M/S ATL), the ambulance driver was absent and no standby driver was available on site and the ambulance was being driven by a diesel mechanic without a valid driving license and DDC approval. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Condition | PPE | At IIW Yard (M/S IIW), some riggers and scaffolders were not equipped with safety gloves and safety goggles. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-08-08 | Unsafe Condition | Lack of Supervision | At tank#05, three air compressors were being used for sand blasting activities had only one operator on standby, informed site supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-09 |
| 2026-03-26 | Unsafe Act | Lack of Supervision | At IIW Yard (M/S IIW), the ambulance driver was absent and no standby driver was available on site. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Condition | Lack of Supervision | At Road#12: An oil bottle was found in the generator area without a spill pallet. | Tank Farm | Road#12 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-08-08 | Unsafe Condition | Housekeeping | At road no#12, at sprinkle lines wall one cement block was placed unsafely, which could fall and hit workers below, informed rigging sup , HSE sup remove immediately. | KOR Refinery | At Road #12 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-09 |
| 2026-03-26 | Unsafe Condition | Slip/Trip/Fall | At Tank#35: An unstable segregation barrier was found leaning dangerously over workers in the rest area, posing a struck-by hazard. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-08-08 | Unsafe Act | Work at Height | At tank#11, one worker was working at height without clipping the lanyards of the harness with two different pipes, informed HSE sup and counseling. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-10 |
| 2026-03-26 | Unsafe Condition | Equipment | At DEL yard: A generator trolly was found without a wheel chocks. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Condition | Procedure | At DEL yard: The compressor fire extinguisher’s inspection is expired and its pipe was also damaged. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-08-08 | Unsafe Condition | Lack of Supervision | At tank#11, for the MS plate fit-up, wedge, U-clamps, and jigs were not secured with a chain, informed to HSE supervisor and secure the wedge, U-clamps, and jigs with a chain before starting the MS plate fit-up. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-09 |
| 2026-03-29 | Unsafe Act | PTW | At DEL yard: M/s DEL worker was observed performing maintenance work of compressor at height without a ladder or stool. Also, work was being carried out without a valid maintenance permit. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-29 | Unsafe Condition | Environment | At DEL yard: Diesel leakage was observed from a compressor causing environmental contamination. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-07 | Unsafe Act | Line of Fire | At tank 05, during hot work a fitter using grinder at main D-door ,sparks hitting to the passing workers. Informed to ATL, HSE supervisor and barricade ,stop entry during grinding activity. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-08 |
| 2026-03-29 | Unsafe Condition | Procedure | At Tank#11: The area needs to be properly barricaded as no work is currently in progress at the tank. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Condition | Procedure | At IIW yard: A material shifting trolly was found parked without wheel chock. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-07 | Unsafe Act | Lack of Supervision | At tank # 05, air compressor found without shield cover. Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-08 |
| 2026-03-26 | Unsafe Condition | Falling Object | At IIW yard: Cylinders were not properly tied and one was in a falling position. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Condition | Slip/Trip/Fall | At IIW yard: Two GI sheets were found lying on the ground, needs to be secure. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-08 | Unsafe Act | Falling Object | At tank# 05, spark were falling directly on the gas cylinder while using the grinder. Informed to HSE supervisor and immediately remove gas cylinder remove this place. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-09 |
| 2026-03-29 | Unsafe Condition | Work at Height | At Road#07: M/s UE worker perform a work at height without tool tie, also supervisor is not present at the site | Tank Farm | Road#07 | Construction | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-08 | Unsafe Act | Procedure | At tank # 05, D-door was hold by the workers instead of hold by the chain block while its installing and welding. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-09 |
| 2026-03-29 | Unsafe Condition | PPE | At Road#12: M/s UE workers were observed working without safety gloves. | Tank Farm | Road#12 | Civil | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-29 | Unsafe Act | PPE | At Road#07: M/s QK workers were found performing soil-related tasks without wearing face mask and safety googles, leading to dust exposure. | Tank Farm | Road#12 | Civil | CONTRACTOR | QK Builders | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-29 | Unsafe Act | PPE | At Utility Area: M/s AKS worker was observed working at height without using tool tie. A falling object risk to workers below. | Plant Area | Utility Area | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-08 | Unsafe Act | Work at Height | At 103E, 104E, and 102E, during scaffolding dismantling, one AKS scaffolder was found not using tool tie. | Plant Area | At Different Locations | Civil | CONTRACTOR | AKS | Routine | | Korangi Refinery | | Closed | | 2025-09-10 |
| 2026-03-29 | Unsafe Act | Falling Object | At Road#1(Near Gantry): The pipeline is resting on temporary supports with stones used as wedges. Proper wedges must be installed to prevent the pipeline from falling | Tank Farm | Road#1 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-04 | Unsafe Act | Work at Height | At 105 C1, 105 C7, and 105 C8, during scaffolding dismantling by the DEL team, a scaffolding pipe was struck by the product line. The worker was counseled. | Plant Area | At 105 C1, 105 C7, and 105 C8 | Civil | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2025-09-05 |
| 2026-03-29 | Unsafe Act | Procedure | At DEL Yard: The rest area is incomplete and a worker was observed sitting in the unfinished area. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-29 | Unsafe Act | Equipment | At DEL Yard: Two grinders were left attended on a conductive MS plate with the power supply still connected. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-04 | Unsafe Act | Work at Height | At 107-F &117-C during scaffolding erection a worker found without tied his tool with tool teether at height. Informed to supervisor and counseling. | Plant Area | At 107-F &117-C | Civil | CONTRACTOR | AKS | Routine | | Korangi Refinery | | Closed | | 2025-09-05 |
| 2026-03-27 | Unsafe Condition | Procedure | At Tank#11: Third-Party inspection tag was missing on the fire extinguisher. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-05 | Unsafe Act | PPE | At tank 05, a wroker found without wearing rigging gloves while rigging activity of pipes. Informed to HSE supervisor and counseling . | Tank Farm | At Tank #5 | Civil | CONTRACTOR | AKS | Routine | | Korangi Refinery | | Closed | | 2025-09-06 |
| 2026-03-29 | Unsafe Act | Equipment | At Road#12: GI sheet in the Generator Area was not tied properly. Secure all loose sheets immediately. | Tank Farm | Road#12 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-29 | Unsafe Act | Equipment | At IIW Yard: Access of the generator was found blocked by another generator. Provide clear access for emergency situations. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-29 | Unsafe Act | PPE | At Tank #30, M/S UE, M/s UE painter was found wearing damaged safety shoes. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-29 | Unsafe Act | Procedure | At Tank #30, M/S DEL, during the replacement of the gas cylinder used for gas cutting, the cutting torch regulators were left open, which created a risk of fire. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-28 | Unsafe Condition | Procedure | At tank-21, M/s DEL scaffolding shed for electrical DP was found with green tag. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-11 | Unsafe Act | PPE | At tank #05, during the cutting work use grinder worker not wearing ear plug. Informed to HSE supervisor. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-12 |
| 2026-03-29 | Unsafe Condition | Lack of Supervision | At tank-21, M/s DEL site safety supervisor was not present at site while work was being in process. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-28 | Unsafe Condition | PPE | At tank-4, M/s IIW electrician was found working without gloves. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-11 | Unsafe Act | PPE | At tank #05, during the IFR work use Hammar workers not wearing an ear plug, high Noice present in inside tank. Informed to HSE supervisor | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-11 |
| 2026-03-29 | Unsafe Act | Procedure | AT tank -35, The movement of M/s IIW excavator was observed without flagman. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-10 | Unsafe Condition | Lack of Supervision | At tank # 05, nearby main D .Door scattered material was present. Informed to HSE supervisor and immediately remove these materials. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-11 |
| 2026-03-29 | Unsafe Act | PPE | At tank-30-yard, M/s AKS workers (Usman ,Qurban, Noor, Haneef, Siddiq) were found wearing damaged safety shoes | Tank Farm | Tank # 30 | Civil | CONTRACTOR | AKS | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-29 | Unsafe Act | PPE | At Tank 35, M/s IIW, during civil activities, some workers were not wearing safety glasses and face masks. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-11 | Unsafe Act | PPE | At tank#05, ATL 1 fitter during the main D. Door MS plate fit up hammering work not wearing safety glove, informed to HSE supervisor and wearing a safety gloves. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-12 |
| 2026-03-30 | Unsafe Act | PPE | At Tank 35, M/s IIW, during civil activities, some workers were not wearing safety glasses and face masks. Counseling was conducted. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-11 | Unsafe Act | Lack of Supervision | At tank #05, ATL 3 workers were found in confined space without medical fitness certificate .informed to HSE supervisor and site in charge. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-12 |
| 2026-03-30 | Unsafe Act | PPE | At Tank 30, M/s DEL, during gas cutting inside the tank, the mechanical supervisor was not wearing a face mask. Counseling was conducted. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-12 | Unsafe Condition | Lack of Supervision | At tank#11, during the tool inspection, it was observed that the electrical inspection tags of 2 LED lights were found expired. Informed to HSE supervisor and immediately electrical inspection tag install. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-12 |
| 2026-03-30 | Unsafe Condition | Procedure | At Tank 35, M/s IIW, during civil work, a dumper was being used without a functioning reverse alarm. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-03-30 | Unsafe Act | PPE | At DEL Yard, M/s DEL, some workers were not wearing safety goggles and safety gloves. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-03-30 | Unsafe Act | Procedure | At Road No. 1, M/S RE, during hot work activities, no HSE person was present at the worksite. | Tank Farm | Road # 1 | Construction | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-12 | Unsafe Act | Lack of Supervision | At tank # 11, while working on chain block, the impact gloves of rigger was found damaged, informed to HSE supervisor and immediately replace gloves. | Tank Farm | At Tank # 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-13 |
| 2026-04-01 | Unsafe Act | Vehicle | A low-pressure fire extinguisher was found on M/s AKS vehicle (No. JU-2694). | Tank Farm | AKS vehicle | Civil | CONTRACTOR | AKS | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-12 | Unsafe Act | PPE | At tank # 05, during handing of MS plate, the scaffolders were found without wearing impact gloves, informed to HSE supervisor. | Tank Farm | At Tank # 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-13 |
| 2026-04-01 | Unsafe Act | Vehicle | At tank 27, M/s AKS workers were observed working at height without using tool tie. | Tank Farm | Tank 27 | Civil | CONTRACTOR | AKS | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-12 | Unsafe Condition | Electrical | At tank # 05, during the painting work, the electrical inspection tag of mixture machine was found expired. Informed to HSE supervisor and Electrician immediately inspection and tag install. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-13 |
| 2026-04-01 | Unsafe Condition | PPE | Fabrication Yard near JP-01 gantry: During MS plate shifting using a forklift: Tye of M/s Crescent fork lifter was in bad condition, M/s Crescent Fork lifter operator wasn’t wearing safety shoes, Workers were not wearing rigging glove, A helper was sitting at the back side of the forklift, Work permit was not available at the site. | Tank Farm | Fabrication Yard | Construction | CONTRACTOR | Crescent | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Procedure | Tank #04: M/s IIW, Safety signboard was observed in a tilted position. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-13 | Unsafe Act | PPE | At tank # 05, Mr. Shahid Lodhi CM use scaffolding ladders without wearing safety gloves informed to HSE supervisor wearing a safety glove immediately. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-14 |
| 2026-04-01 | Unsafe Condition | PPE | Tank #21: M/s DEL, during splash plate removal at tank roof, the mechanical supervisor handled plates without wearing rigging gloves. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-12 | Unsafe Act | PPE | At tank #05, one worker was using a drill machine without wearing safety gloves. Informed to HSE supervisor. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-10 |
| 2026-04-01 | Unsafe Condition | Work at Height | Tank #21: M/s DEL, during hot work at height, the ground area below was not barricaded. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Housekeeping | Tank #21: M/s DEL, Gas cylinders were found lying in a horizontal position at the worksite. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-12 | Unsafe Act | PPE | At tank #11, one fitter was lifting and shifting a Garder without wearing rigging gloves. Informed to HSE supervisor during lifting /shifting activities to avoid hand injuries. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-13 |
| 2026-04-01 | Unsafe Condition | Equipment | Road No. 12: Oil leakage was observed from the main engine rotary part of M/s ATL's 60 KVA generator during operation. | Tank Farm | Road#12 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Procedure | At M/s ATL Yard: The door handle of the M/s ATL Ambulance was found damaged and the internal cleanliness was in poor condition. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Electrical | Tank #30: M/s DEL, Earthing cable of the electrical distribution board (DB) was found damaged. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Procedure | Tank #30: M/s DEL, during bottom plate removal, third-party of riggers were not available at the site. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | PPE | Tank #30: M/s DEL, some workers were using safety helmets that were not approved by PRL, as they had 4-point suspensions and no air vents. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Act | PPE | Fabrication yard near JP1 fork lifter helper was handling material without rigging gloves. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-14 | Unsafe Act | PPE | At tank # 05 ,one fitter during the power brushing not wearing a face mask and Ear plug, informed to HSE supervisor and insure to use PPEs as per job requirements.(Waseem). | Tank Farm | At Tank # 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-15 |
| 2026-04-01 | Unsafe Act | Procedure | At road 9, M/s DEL scaffolding materials were placed without barrication. | Tank Farm | Road#9 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-14 | Unsafe Condition | Equipment | At tank # 11 and at tank #05, two generators were used despite their 3rd party inspection were being expired. Informed to HSE Lead ensure timely renewal of inspection and only operate certified equipment. | Tank Farm | At tank # 11 and at tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-14 |
| 2025-09-14 | Unsafe Condition | Procedure | At tank # 05,the scaffolding team and fabrication team were working in parallel at the same location, informed to HSE supervisor coordinate work and avoid parallel high -risk activities. | Tank Farm | At Tank # 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-15 |
| 2025-09-14 | Unsafe Condition | Lack of Supervision | At tank # 11, the HSE lead and HSE supervisor were not present at site. | Tank Farm | At Tank # 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-15 |
| 2025-09-19 | Unsafe Condition | Procedure | Top purer manifold found barricaded and blocked due to excavation. | KOR Refinery | KOR Refinery | Civil | PRL | | Routine | | Korangi Refinery | team | Closed | | 2025-09-17 |
| 2026-04-01 | Unsafe Act | Housekeeping | At tank-21, M/s DEL were placed combustible material (wooden planks) inside tank yard. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Work at Height | At tank-21, M/s DEL scaffolding materials were stake without barrication. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Line of Fire | At tank-21, M/s DEL fire blanket was unable to bear sparks. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Procedure | At tank-21, DCP fire extinguisher was placed near M/s DEL electrical DB, however CO2 extinguisher is recommended. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-19 | Unsafe Condition | Procedure | Road-06 found depressed near tank-18. | KOR Refinery | Road-06 | Civil | PRL | | Routine | | Korangi Refinery | team | Closed | | 2025-09-17 |
| 2026-04-01 | Unsafe Condition | Procedure | At tank-35, fire extinguishers were not available in M/s IIW tractor and road roller. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Procedure | At tank-4, M/s IIW placed trolly inside the tank without stoper. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-01 | Unsafe Condition | Procedure | At tank-11, fire extinguisher was not available in M/s ATL Shazoor truck. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Condition | Work at Height | At Tank #56, missing of expiry date was observed on scaffolding green tag. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Act | Procedure | At Tank #56, During shell fit-up, a C-channel was being lifted using only with a rope without proper lifting/ hoisting method by M/s AJC workers | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Condition | Work at Height | At Tank #56, M/s AJC safety sign was found hanging improperly on the top scaffolding platform. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Condition | Work at Height | At Tank #56, M/s AJC grinder operator’s face shield was loose while working on the top scaffolding platform. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Condition | Equipment | At Tank #56, The terminal tumble of M/s AJC welding machine was found damaged. The HSE team was informed and advised immediate replacement before continuing work. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Condition | PPE | At Tank #56, During back grinding at the shell, M/s AJC workers were not using KN-95 masks. The HSE team was informed. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Condition | Electrical | At Tank #56, The main electrical supply cable of the M/s AJC automatic girth welding machine was found exposed. The HSE team and Electrical team were informed. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2025-09-15 | Unsafe Condition | Lack of Supervision | At tank#05, during crane operation, the mechanical team was moving inside the barricaded area. Informed to HSE Supervisor and hold the mechanical activates. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-16 |
| 2026-04-02 | Unsafe Act | Work at Height | At Tank #56, It were observed that M/s AJC workers using stool on scaffolding platform. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2025-09-15 | Unsafe Act | Falling Object | At tank#05, on the dome roof ,a worker was pulling the sprinkler line using his safety harness lanyard. The lanyard hook was not anchored; an no supervisor was present at the location. Informed to HSE lead. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-16 |
| 2025-09-15 | Unsafe Condition | PPE | At tank#05, while installing the sprinkler line on the dome roof, workers were working during light rain. This was unsafe because the roof surface had become slippery. Informed to Nizam sb. And work should be stopped during rain and the dome roof surface must be ensured dry. | Tank Farm | At Tank#05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-16 |
| 2026-04-03 | Unsafe Condition | Falling Object | At DEL Yard: Cylinders found without proper securing/tie-up, creating a falling hazard. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Housekeeping | At Tank#11: Splash plates were placed on wooden pieces, proper support/ stand is required. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Procedure | At Tank#11: M/s ATL Material shifting trolly has no proper wheel chocks. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Procedure | At Tank#11: Construction Material found without proper barricading; immediate barricading is required. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Electrical | At Tank#21: M/s DEL Electrical DB(Distribution Board) was found without a proper weather shade. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Housekeeping | At Tank#30: M/s DEL Material is placed outside of barricaded area, and MS plates are kept on wooden Pieces. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Slip/Trip/Fall | At Tank#30: M/s DEL MS plate laying in yard, creating a tripping hazard. Sharp edges need to be removed & proper stacking is required. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-18 | Unsafe Act | Vehicle | At tank # 05,during the lifting operation ,the truck driver was not present, and both the truck and the crane were being drive by the same operator. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-19 |
| 2026-04-03 | Unsafe Act | PPE | At Road#14: M/s GMC worker was observed working in sand without wearing a proper mask. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | GMC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Act | Procedure | At Tank#4: Depressed ground surface was noted due to rain; backfilling is required. | Tank Farm | Tank # 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-18 | Unsafe Act | PPE | At tank # 05,ATL fabricator was handling an MS plate ring on the doom roof without wearing safety gloves and without hooking his safety harness. Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-19 |
| 2026-04-03 | Unsafe Act | Procedure | At Road#6 (Front side of fire manifold): Depressed ground surface was observed due to recent rain; backfilling is required to stabilize the area. | Tank Farm | Road#6 | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Act | Housekeeping | At Road#4: The Pit cover was found missing; it needs to be replaced with a proper cover immediately. | Tank Farm | Road#4 | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Slip/Trip/Fall | At Tank#30 Yard: A walkway step was found damaged/broken, immediate repair is required to prevent tripping hazards. | Tank Farm | Tank # 30 | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Environment | At Decanting Area: Hazardous waste was found mixed with recyclable and general garbage; waste segregation is required and bins need to be emptied. | Tank Farm | Decanting Area | Logistic | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Vehicle | At Decanting area: Bowser no. GLTA 8619 & HNZ 2077 doors were found locked. | Tank Farm | Decanting Area | Logistic | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-20 | Unsafe Act | Equipment | At tank # 05, while changing the disc of grinder the plug was connected (energized). Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-20 |
| 2025-09-20 | Unsafe Act | Procedure | At tank # 05, some person entered the tank whose names were not included in the SBM medical list,(Mr. Khalid Anwar, Mr. Majeed sb. | Tank Farm | At Tank # 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-21 |
| 2025-09-20 | Unsafe Condition | Electrical | At tank # 05, after replacement of the breaker and switch in the generator , the electrical tag was not re-tagged. Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-21 |
| 2025-09-20 | Unsafe Condition | Slip/Trip/Fall | Unnecessary material placed near fire hydrant and foam trolley Infront of G-2 warehouse. | KOR Refinery | G-2 warehouse. | Construction | PRL | | Routine | | Korangi Refinery | | Closed | | 2025-09-21 |
| 2025-09-23 | Unsafe Condition | Procedure | Fire hydrant #08 access found block and wild bushes around fire hydrant. | KOR Refinery | Fire hydrant #08 | Warehouse | PRL | | Routine | | Korangi Refinery | | Closed | | 2025-09-24 |
| 2026-06-24 | Unsafe Condition | Procedure | At Tank #35,M/s IIW. MS plate was found near resting shade without barrication. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-06-23 | Unsafe Condition | Slip/Trip/Fall | At Tank #56, M/s AJC. on the rear side of the tank, loose planks were observed on the scaffolding platform. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-23 | Unsafe Condition | Electrical | At Tank #56, M/s AJC. during welding work, the earthing wire connection was found loose. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-23 | Unsafe Act | Lack of Supervision | At Tank #30 – M/S DEL: Parallel activities are being carried out simultaneously on the tank without proper coordination. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-23 | Unsafe Act | PPE | At Tank #30 – M/S DEL: Fabricator's safety gloves were found damaged and require immediate replacement. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2025-09-23 | Unsafe Condition | Procedure | At warehouse near salt yard wild, bushes around fire water line (hydrant#0 7) and EEWS-1, needs to be removed. | Warehouse | Near Salt Yard | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2025-09-23 | Unsafe Condition | Procedure | MCP # 53 at warehouse G-3 needs to be re-paint. | KOR Refinery | Warehouse | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2025-09-23 | Unsafe Act | Work at Height | At tank #05, during inspection QC inspection team were found without chain strip wearing at work at height .informed to HSE supervisor . | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-07-11 |
| 2025-09-23 | Unsafe Act | Equipment | At tank #05, dustbin was found filled garbage. Informed to HSE supervisor immediately empty to dustbin.) | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2025-09-23 | Unsafe Act | Lack of Supervision | At tank # 05, during the material shifting worker using damage rope, informed to HSE supervisor and immediately replace lifting rope . | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2025-09-23 | Unsafe Condition | Equipment | At tank#05, during hot work , the Electrical D.B was tripping repeatedly, after inspection, it was found that the electrodes were shorting, which caused the tripping. Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2026-07-11 | Unsafe Condition | Lack of Supervision | At ATL workshop, filled gas cylinders were stored lying on each other, which is unsafe and may cause leakage or cylinder damage. Informed to HSE supervisor. | KOR Refinery | ATL workshop | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | Ahsan | Open | | |
| 2026-04-01 | Unsafe Act | Procedure | At tank-4, M/s IIW walkway ramp was red tag, while workers were using it. | Tank Farm | Tank #4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-03-29 | Unsafe Act | PPE | At Tank #30, M/S UE, M/s UE painter was found wearing damaged safety shoes. | Tank Farm | Tank # 30 | Construction | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-04-01 | Unsafe Condition | PPE | Tank #30: M/s DEL, some workers were using safety helmets that were not approved by PRL, as they had 4-point suspensions and no air vents. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-24 | Unsafe Act | PPE | At tank #11, during fabrication work, one fabricator was not wearing a safety glove. Informed to HSE supervisor. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2025-09-24 | Unsafe Act | Lack of Supervision | At tank # 11, sparks from the grinder were hitting to another worker. Informed to HSE lead. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2025-09-24 | Unsafe Act | Work at Height | At tank # 11, during the scaffolding modification one scaffolder safety harness’s lanyard was not hooked. Informed to HSE supervisor and counseling done | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-24 |
| 2025-09-23 | Unsafe Condition | Slip/Trip/Fall | At ATL workshop, filled gas cylinders were stored lying on each other, which is unsafe and may cause leakage or cylinder damage. Informed to HSE supervisor. | Tank Farm | ATL Workshop | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-09-24 |
| 2025-09-24 | Unsafe Act | Work at Height | At tank#11, during the safety round one worker harness does not hook. Informed to HSE Supervisor and immediately action. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-24 |
| 2025-09-24 | Unsafe Condition | Housekeeping | At tank#11, during the safety round, loose materials(cutting disk, channel pace ,planks etc.). were found on the scaffolding platform and tank roof ,creating a potential falling object or tripping hazard. Informed to HSE supervisor. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-25 |
| 2026-03-29 | Unsafe Condition | Work at Height | At Road#07: M/s UE worker perform a work at height without tool tie, also supervisor is not present at the site | Tank Farm | Road#07 | Construction | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2025-09-24 | Unsafe Act | Slip/Trip/Fall | At tank#05, during the safety round found the MS plate was not barricaded, creating a potential tripping and injury hazard. Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-25 |
| 2025-09-25 | Unsafe Condition | Slip/Trip/Fall | At tank#11, the main entrance of tank the corner of an MS plate was raised, creating a tripping hazard .informed to HSE supervisor and immediately remove tripping hazard. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-09-25 | Unsafe Act | Work at Height | At tank#11, during reinforcement fit up using hammer tool tie was found damage. Informed to HSE supervisor and immediately change tool tie | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-12 |
| 2025-09-25 | Unsafe Condition | Housekeeping | At tank#05, during the hot work activities and crane operation, tank yard surface not level and poor housekeeping ,informed to HSE supervisor | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-12 |
| 2025-09-25 | Unsafe Act | PPE | At tank#05, during the tank main hole box up, 2 fitters not wearing a safety gloves. Informed to HSE supervisor and workers counseling. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-07-12 |
| 2025-09-25 | Unsafe Condition | Equipment | At tank#05, during the fabrication work change cutting disk, grinder lock not working. informed to HSE supervisor immediately change the grinder. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-12 |
| 2025-09-25 | Unsafe Condition | Procedure | At ATL workshop, filled gas cylinders were stored lying on each other, which is unsafe and may cause leakage or cylinder damage. Informed to HSE supervisor. | Tank Farm | ATL workshop | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-12 |
| 2025-09-25 | Unsafe Condition | Work at Height | At tank#05, loose materials were scattered on the permanent /temporary platform, creating a potential tripping and falling hazard. Informed to HSE supervisor. | Tank Farm | Tank # 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-26 | Unsafe Act | Slip/Trip/Fall | At tank#05, loose materials were scattered on the permanent /temporary platform, creating a potential tripping and falling hazard. Informed to HSE supervisor. | Tank Farm | Tank # 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-09-26 | Unsafe Act | PPE | At tank #11, during fabrication work, one fabricator was not wearing a safety glove. Informed to HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-09-26 | Unsafe Condition | Line of Fire | At tank # 11, sparks from the grinder were hitting to another worker. Informed to HSE lead. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-09-26 | Unsafe Act | Lack of Supervision | At tank # 05, during the crane operation, 01 worker was crossing the barricaded area. Informed to HSE supervisor and counseling done. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-09-26 | Unsafe Act | Lack of Supervision | At tank#11, during the safety round one worker harness does not hook. Informed to HSE Supervisor and immediately action. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-07 | Unsafe Act | Falling Object | At tank#11, during the safety round, loose materials(cutting disk, channel pace ,planks etc.). were found on the scaffolding platform and tank roof ,creating a potential falling object or tripping hazard. Informed to HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2025-10-07 | Unsafe Condition | Work at Height | At tank#11, during the safety round one worker harness does not hook. Informed to HSE Supervisor and immediately action. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-07 | Unsafe Condition | Slip/Trip/Fall | At tank#05, during the safety round found the MS plate was not barricaded, creating a potential tripping and injury hazard. Informed to HSE supervisor. | Tank Farm | Tank #5 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-10-13 | Unsafe Condition | Slip/Trip/Fall | At tank # 05, the rope of the basket used for lifting material was found damaged. Informed to HSE supervisor and immediately replace the rope. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-07-12 |
| 2025-10-10 | Unsafe Condition | Work at Height | At tank # 05, loose material was found scattered on the scaffolding plate form. Informed to HSE supervisor and immediately remove loos material. | Tank Farm | Tank # 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-07 | Unsafe Act | Lack of Supervision | At tank# 11, during hot work, welding and grinder sparks were falling on the green blanket which is a combustible material. Informed to HSE supervisor covered hot workplace with fire blanket. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2025-10-07 | Unsafe Condition | PTW | At tank # 05, Excavation work was in progress, but work permit was not present at site. Informed to HSE supervisor. | Tank Farm | Tank # 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-10 | Unsafe Act | Lack of Supervision | At tank # 05, the rope of the basket used for lifting material was found damaged. Informed to HSE supervisor and immediately replace the rope. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Act | PPE | At Tank #5, during sand loading, workers were not wearing the required PPE such as masks and safety goggles. The HSE Supervisor was informed, and the workers were instructed to wear proper PPE. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Condition | Lack of Supervision | At Tank #11, during the pre-operation visual inspection, a damaged tire was observed on the crane. The HSE Supervisor was informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Condition | Lack of Supervision | At Tank #11, during the pre-operation visual inspection, a damaged tire was observed on the crane. The HSE Supervisor was informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Condition | Lack of Supervision | At Tank #11, during the pre-operation visual inspection, a damaged tire was observed on the crane. The HSE Supervisor was informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Condition | Housekeeping | At Tank #11, poor housekeeping was observed. Sandblasting materials were scattered in the work area, creating slip and trip hazards. The HSE Supervisor was informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Condition | Slip/Trip/Fall | At Tank #11, loose materials were scattered on the scaffolding platform, creating a potential tripping and falling hazard. The HSE Supervisor and Site Supervisor were informed. (Waseem, Niazi). | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Act | PPE | At tank #11,during sand blasting activities, workers were not wearing face masks.(N.95)informed to HSE supervisor and wearing a face mask. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Act | PPE | At tank #11,during sand blasting activities, workers were not wearing face masks.(N.95)informed to HSE supervisor and wearing a face mask. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Act | PPE | At tank #11,during sand blasting activities, workers were not wearing face masks.(N.95)informed to HSE supervisor and wearing a face mask. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-15 | Unsafe Act | Falling Object | At tank #11,the portable air compressor was connected with an electrical plug while activity was stopped. Informed to HSE supervisor and immediately disconnect plug. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2025-10-15 | Unsafe Act | Falling Object | At tank #11,the portable air compressor was connected with an electrical plug while activity was stopped. Informed to HSE supervisor and immediately disconnect plug. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2025-10-17 | Unsafe Condition | Vehicle | At tank#11, an electrode box was lying on the scaffolding platform ,creating risk of falling. Informed to HSE supervisor and the electrode box was immediately removed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-21 | Unsafe Condition | Environment | At tank#15, during the hot work activities found the fire Extinguisher were not available near the generator, informed to HSE person. | Tank Farm | Tank #15 | Construction | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-21 | Unsafe Act | Work at Height | At tank #11, an ATL staff member was observed working on a high scaffolding platform without a chin strap and his safety harness not hooked. Informed to HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-21 | Unsafe Condition | Environment | At tank#05, during grinding work, no support was provided to hold the pipeline in position which could cause movement or vibration. Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-22 | Unsafe Act | PPE | At ATL yard during MS plate shifting and cleaning 1 worker not wearing a safety impact glove. Informed to HSE supervisor and use PPE,s as per job reequipments. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-22 | Unsafe Condition | Work at Height | At tank#05 , during the fabrication work the crude line spool was temporarily supported on scaffolding pipes and cement block ,which is an unsafe and unstable method of support. Informed to HSE supervisor and use chain block. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-22 | Unsafe Condition | Housekeeping | At tank#11,the Air compressor tire was sent yesterday for puncture repair and has not been returned yet (till 11;00 A.M)and the Air compressor placed and supported on a small pipeline piece ,which is unsafe and unstable. Informed HSE sup. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-22 | Unsafe Condition | Lack of Supervision | At tank #05,different types of materials were lying scattered in the tank yard and not barricaded / poor housekeeping. Informed to HSE supervisor. | Tank Farm | Tank #05 | Logistic | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-22 | Unsafe Condition | Vehicle | At multiple locations (Near Kachra Kundi Road 4, access to tank 15 yard and opposite to weigh bridge), leftover material needs to be removed. | KOR Refinery | At multiple locations | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Condition | Housekeeping | At temporary M/s DEL fabrication yard, poor housekeeping was observed, such as leftover material, pipes, metallic sheets, plastic bags, cable rolls, etc., which need to be removed from the area. | KOR Refinery | DEL Fabrication Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Act | PPE | At tank #11,during the material shifting one fitter was lifting a C-channel without wearing rigging gloves ,which poses a risk of hand injury. Informed HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Condition | Electrical | At tank #11,during the safety round, one 3-phase female socket on the Electrical distribution board,(D.B) was found without a safety cover ,posing an electrical contact hazard. Informed HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Condition | Work at Height | At tank#05, during safety round different loose materials were present on the scaffolding plate form ,creating falling object hazard. Informed HSE supervisor and immediately remove loos materials. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Act | Work at Height | At tank#05,during work at height activities ,one hammer and two spanners were being used without tool tie. Informed to HSE supervisor and concealing done. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Condition | Vehicle | At At tank# ATL yard, the ambulance driver was driving other vehicles, and no standby driver was present for the ambulance. Informed HSE teem/ construction teem. | Tank Farm | At tank#05 & ATL yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Condition | Electrical | At tank #11, during the safety, round and Electrical tool inspection one Electrical Extension bord Expire .informed to HSE supervisor and remove expire tool. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Condition | Electrical | At tank #11, during safety round, the ventilation fan installed at the tank did not have an electrical inspection tag. Informed to HSE supervisor immediately install electrical inspection tag. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-28 | Unsafe Act | PPE | At tank#05,during the safety round, four fitters were manually lifting and shifting the pipeline without wearing impact-resistant gloves. Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-07-12 |
| 2025-10-30 | Unsafe Condition | Housekeeping | At the rotary workshop, several housekeeping and safety issues were observed: lube cans stored without secondary containment, an overflowing AC drain bucket, a cup of tea placed on the notice board, and improperly marked waste bins. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Electrical | Electrical cabling at the WMS office was found poorly managed, and a non-industrial extension board was in use, posing a risk of electrical hazard | KOR Refinery | WMS Office | Electrical | CONTRACTOR | WMS | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Housekeeping | At WMS store, poor housekeeping was observed, including safety helmets and coveralls scattered on the floor, improper management of electrical cabling, broken almirah door, and damage false ceiling, which poses a potential falling object hazard. | Tank Farm | WMS Store | Operation | CONTRACTOR | WMS | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Electrical | At the mobile workshop, an electrical distribution board was found open, posing a potential electrical safety hazard. | KOR Refinery | Mobile Workshop | Electrical | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Housekeeping | At mobile workshop, oil/ HSD drum found placed outside the secondary containment and some empty drum placed outside the workshop. | KOR Refinery | Mobile Workshop | Operation | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Procedure | At outside electrical workshop, oxygen cylinder was found with damage pressure gauges and hazardous material were scattered on the floor. | KOR Refinery | Electrical Workshop | Electrical | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Electrical | At electrical workshop, improper stacking of material was observed. | KOR Refinery | Electrical Workshop | Electrical | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Procedure | Empty paint cans were found dumped behind the contractor’s paint store. These should be properly disposed of at the designated location (Cargill scrap yard). | Plant Area | At 202 Air Cooler | Civil | PRL | | Shutdown | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-10-30 | Unsafe Condition | Equipment | At civil rest/change room, metallic almirah was found damaged at the bottom, posing a risk of collapse. | KOR Refinery | rest/change | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-12 |
| 2025-10-30 | Unsafe Condition | Housekeeping | At multiple points, poor housekeeping was observed (such as leftover materials, wooden pallets, plastic bags, and used cotton rags and cloths). | KOR Refinery | Multiple Locations | Operation | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Electrical | Near Electrical rest room, newspapers placed between the wires or inside the electrical distribution board can increase the risk of fire which needs to be removed. | Tank Farm | Electrical Rest Room | Electrical | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-30 | Unsafe Condition | Environment | At scrap yard, poor waste management was observed (waste found mix), which needs to be properly segregated and dumped as per marking. | KOR Refinery | Scrap Yard | Stationary | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-31 | Unsafe Condition | Housekeeping | Stagnant water was observed around the portable storage tanks used for office purposes. It may become a potential breeding source for mosquitoes, should be drained promptly. | KOR Refinery | KOR Refinery | A&S | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-14 | Unsafe Act | Procedure | At Road #1, M/s RE: A welder was observed working on the fire water line while a helper was sitting on the same line. | KOR Refinery | Road #1 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-14 | Unsafe Act | Procedure | At Road #1, M/s RE team was observed using a tarpaulin as a fire blanket during hot work activity. | KOR Refinery | RE | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-14 | Unsafe Act | Work at Height | At Tank #30, M/s DEL welder was observed descending from the roof while holding a harness hook in one hand and welding material in the other and failed to maintain three-point contact while using the stairs. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-14 | Unsafe Condition | Falling Object | At Tank #30, M/s DEL worker was carrying out gas cutting on the tank roof, and sparks were observed falling outside through the D-door. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-14 | Unsafe Condition | Procedure | At Tank #35, M/s IIW: Shuttering work was in progress, and wooden ballies were not properly stacked. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-14 | Unsafe Act | Electrical | At the DEL yard fire canopy area, the area was found congested. Two workers were observed performing welding and grinding activities, with sparks falling on electrical cables, and the welder was also standing on the cables. | KOR Refinery | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-14 | Unsafe Act | Procedure | At Tank #35, M/s IIW shuttering work at the tank ring wall was in progress. The ramp was found red-tagged. However, workers were observed using it. | KOR Refinery | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-14 | Unsafe Act | Line of Fire | At IIW Yard: A roller compactor was found without wheel chocks and with a damaged spark arrestor; ensure the wheels are properly chocked and the spark arrestor is correctly installed. | KOR Refinery | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Act | Work at Height | At tank 56, during scaffolding removal, M/s AJC worker was using a hammer without tool tie. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Condition | Falling Object | At tank 56, during welding activity, M/s AJC welder was wearing non-compatible clothing (Romal). | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Act | Procedure | At tank 56, during welding activity, M/s AJC welder was wearing non-compatible clothing (Romal).
At tank 56, a welding electrode desiccator and a water bottle were observed being lifted using only a rope, without a tool bag. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Condition | Line of Fire | At tank 56, M/s AJC fire blankets showed poor heat resistance, grinding/ welding sparks caused visible burn holes through the material. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Act | Procedure | An engine oil leak was observed on the 100 kVA generator operated by M/s AJC. Furthermore, no drip tray was provided to contain the spill. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Act | Procedure | At tank 56, three scaffolders were working at height without having third-party certification. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Act | Work at Height | At tank 56, a welding electrode desiccator and a water bottle were observed being lifted using only a rope, without a tool bag. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-03-15 | Unsafe Act | Lack of Supervision | At tank 56, one scaffolder hooked the safety harness to a shell plate, which is not a proper anchorage point. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-03-25 |
| 2026-04-15 | Unsafe Condition | Work at Height | At tank 56, during scaffolding removal, parallel grinding work was being carried out by one fitter. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-06-19 | Unsafe Act | Procedure | Tank#30 M/s DEL, the flagman was observed walking alongside the moving trailer, disregarding safe clearance distances. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-19 | Unsafe Act | Housekeeping | M/s IIW Workshop area, poor housekeeping was found observed (tools, paper and plastic materials were observed near the gas cylinders). | KOR Refinery | IIW Workshop | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-19 | Unsafe Act | Equipment | Tank#4 M/s IIW, there was no sitting arrangement for generator operator. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-19 | Unsafe Act | Equipment | Tank#4 M/s IIW, there was no sitting arrangement for generator operator. | Tank Farm | Tank #4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-23 | Unsafe Condition | Electrical | At Tank #30 – M/S DEL: Electrical extension board cable was found damaged. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-19 | Unsafe Condition | Falling Object | Tank#4 M/s IIW, Electrical cables were observed lying unprotected on the ground and exposed on the walkway. | Tank Farm | Tank #04 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-06-19 | Unsafe Act | Equipment | Tank#4 M/s IIW, oil leakage was observed from the generator. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-19 | Unsafe Act | Procedure | At DEL Yard: Poor housekeeping observed during safety round, need to clean the area. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-19 | Unsafe Act | Procedure | At DEL Yard: MS sheets were found lying unsecured in front of the gas cylinder storage area. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-19 | Unsafe Act | Environment | At DEL Yard: Hazardous waste and recycle material are found mixed in the Bins; waste segregation is required and bins need to be emptied. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-23 | Unsafe Condition | Housekeeping | At Tank #30 – M/S DEL: Grinders were observed placed on a steel plate instead of being stored in the designated grinder stand. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-07 | Unsafe Act | Procedure | At Tank # 30: M/s DEL worker was observed not maintaining a 3-point contact while using the stairs. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-23 | Unsafe Condition | Falling Object | At Tank #30 – M/S DEL: During stairs steps build-up activities, sparks were observed falling to ground. | Tank Farm | Tank #30 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-07 | Unsafe Condition | Environment | At DEL Yard: Hazardous waste and recycle material are found mixed in the Bins; waste segregation is required and bins need to be emptied. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-07 | Unsafe Act | PPE | At Tank # 35: Supervisor (Bilal) was observed not wearing safety goggles continuously during work activities. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-23 | Unsafe Act | PPE | At Tank #21 – M/S DEL: Worker was not wearing safety gloves and was not following the three-point contact rule while using stairs. | KOR Refinery | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-07 | Unsafe Act | PPE | At Tank # 35: a steel fixer was working without wearing a protective glove during the task. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-06-19 |
| 2026-06-22 | Unsafe Condition | Procedure | At Tank 21: A knotted lifting rope was found in use during lifting activities. | KOR Refinery | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-22 | Unsafe Act | Procedure | At Tank 21: Three M/s DEL worker hook harness at the same lifeline. | KOR Refinery | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-08 | Unsafe Condition | Electrical | At Tank #56,M/s AJC, the main electrical changeover handle was missing and was being operated using plier. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-22 | Unsafe Condition | Housekeeping | At Tank 30: welding plant was placed on metal wedges and supporting by splash plate hanger. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-08 | Unsafe Condition | Electrical | At Tank #56, M/s AJC, gas cylinders were being used without tying with chains and the fire blanket was also damaged. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-22 | Unsafe Condition | Housekeeping | At Tank 21: The existing davit arm and its winch had been inspected and certified by a third party. However, the old davit arm was removed and replaced with a new davit arm that had not been load tested or certified by a third party. | KOR Refinery | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-08 | Unsafe Act | Work at Height | At Tank #56, M/s AJC, a scaffolder has hooked his harness onto the shell plate, which was not a designated anchor point. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-08 | Unsafe Act | Electrical | At Tank #56, M/s AJC, during scaffolding modification, the RED tag was not displayed. Additionally, a rigger was using the same platform, which had damaged and broken planks. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-24 | Unsafe Condition | Procedure | At Tank 25 Yard: Substandard pipe supports (wooden pieces) were being used to support the newly installed pipeline. Additionally, no proper walkway or crossover arrangement was provided for safe access across the pipeline. | KOR Refinery | Tank #25 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-08 | Unsafe Condition | Falling Object | At Tank #56, M/s AJC, a tool bag was found damaged. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-07 |
| 2026-04-08 | Unsafe Condition | Electrical | At Tank #56, M/s AJC, the main electrical cable was observed exposed above ground level. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-08 | Unsafe Act | Lack of Supervision | At KT foam tank, M/s AKS , during scaffolding installation, workers were not using tool bag. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AKS | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-24 | Unsafe Act | Procedure | At Tank 30 & at DEL Yard, during spool piece facing, the worker was holding the spool piece by hand instead of securing it in a vice. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-24 | Unsafe Act | Work at Height | At Tank #04, M/s IIW during scaffold dismantling activities, two scaffolders were observed working without hooking their safety harness lanyards. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-09 | Unsafe Condition | Work at Height | At tank 30, The railing supporting the lifeline scaffolding pipes is fragile. It needs to be repaired before proceeding with the next activity. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-09 | Unsafe Condition | Work at Height | At tank 30, M/s DEL workers are walking directly on the roof, whereas it was agreed that they would place scaffolding planks and move over them. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-24 | Unsafe Condition | Work at Height | At the DEL Yard, M/s DEL. scaffolding materials, including oversized pipes, were being transported by forklift. The pipes were not tied down during the lifting and shifting operation. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-25 | Unsafe Condition | Falling Object | Tank #30 M/S DEL, sparks observed falling on ground during steps build up activity. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-09 | Unsafe Act | Procedure | At tanks 21 and 30, during hot work on the roof, only a welding blanket was tied to the railing, whereas it was agreed that a proper welding canopy would be provided wherever hot work is carried out. | Tank Farm | Tank # 21 & 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-23 | Unsafe Act | Procedure | At Tank #21 – M/S DEL: During welding activities, sparks were observed spreading outside the work area. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | team | Closed | | 2026-07-11 |
| 2026-04-09 | Unsafe Act | Line of Fire | At Tank #30, during hot work arrangements, workers were crossing over product lines and sprinkler lines. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-23 | Unsafe Act | Equipment | At Tank #56, M/s AJC. the generator operator was absent from the worksite. | KT | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-09 | Unsafe Act | Work at Height | At Tank #04, one worker was observed sitting on a scaffolding pipe. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-20 | Unsafe Condition | Slip/Trip/Fall | At Tank #21, M/s DEL. Roof plates were lying on the walkways, creating a tripping hazard. | KOR Refinery | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Condition | PTW | At the DEL yard, maintenance work was being carried out without having permit and dropping of oil was also observed. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-27 | Unsafe Act | Procedure | At Tank #11, structure material was found on walkway without barrication. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Condition | Procedure | At Tank 21, the cut/open section of the roof was found without barrication. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-27 | Unsafe Act | PPE | TANK# 04 M/S IIW, rigger was using damaged gloves. | KOR Refinery | TANK# 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Act | PPE | Tank #11: Worker was not wearing safety gloves during civil work. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-27 | Unsafe Condition | Falling Object | TANK# 04 M/S IIW, during gas cutting on the shell, sparks were falling to the area below. | KOR Refinery | TANK# 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Condition | Procedure | Tank #11: GI sheet was lying on the ground, creating a tripping hazard and risk of sharp-edge injury. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-27 | Unsafe Act | Work at Height | TANK #11 M/S ATL, Workers were found working on red tagged scaffold during dismantling activities. | KOR Refinery | TANK #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Act | PPE | Tank #11: Electrical work on a live Distribution Board (DB) was carried out without safety gloves, and improper tool handling/bag was observed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-27 | Unsafe Act | Procedure | At Tank #05, while performing hot work activity, M/s ATL team was not properly build a canopy. | KOR Refinery | TANK# 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Act | PPE | Tank #21: Civil Supervisor and HSE Supervisor were wearing unapproved safety helmets (not compliant with PRL standards). | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-27 | Unsafe Condition | Electrical | TANK # 30 M/S DEL, damaged welding cable that had been repaired with electrical tape was being used. | KOR Refinery | TANK# 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-04-10 | Unsafe Act | PPE | Tank #21: Civil workers were not wearing face masks during work. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-15 | Unsafe Condition | PPE | M/S DEL Yard: One gas cutting operator was working without gloves, and another worker was wearing damaged gloves. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-10 | Unsafe Condition | Procedure | Tank #04: A scaffolding plank on the main walkway was improperly placed, creating a tripping hazard. | KOR Refinery | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-15 | Unsafe Act | PPE | At the DEL M/s DEL. Yard, during testing activities, a welder was found not wearing a welding safety helmet and was using an unapproved safety helmet. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-04-10 | Unsafe Condition | Work at Height | IIW Yard: Diesel storage area was not properly contained. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-15 | Unsafe Act | Procedure | Tank #4 – M/S IIW: During crane activity, the rigging supervisor was not present at the worksite. | KOR Refinery | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-04-10 | Unsafe Condition | Housekeeping | IIW Yard: Gas cylinder was improperly placed and not tagged. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Act | PPE | IIW Yard: Worker was filling diesel without wearing proper PPE. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-15 | Unsafe Act | Procedure | Tank #21 – M/S DEL: A worker was wearing a damaged coverall and had used banding wire to tie the sleeves. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Condition | Work at Height | IIW Yard: Scaffolding materials were not stacked properly. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-07 | Unsafe Condition | PPE | At tank #05 , during the scaffolding materials shifting one worker not wearing a safety gloves, informed to HSE supervisor counseling done. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2026-06-16 | Unsafe Condition | Procedure | MCP boiler Utility area paint required. And fire hydrant Isom boiler area and power house all hydrant paint required. | Tank Farm | MCP boiler Utility area | Civil | CONTRACTOR | PRL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-16 | Unsafe Condition | Procedure | Road 01 and 06 safety sign board broken condition. | Tank Farm | Road 01 and 06 | Stationary | CONTRACTOR | PRL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-17 | Unsafe Condition | Falling Object | At Tank #04, M/s IIW: During gas-cutting work, sparks were observed falling onto dry grass. All combustible materials should be removed from the work area prior to the commencement of hot work activities. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-17 | Unsafe Condition | Work at Height | At Tank #30, M/s DEL: The roof railing was found detached from the tank structure. A lifeline was observed anchored to a scaffolding pipe fixed to the unstable railing. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-17 | Unsafe Condition | Falling Object | At Tank #30, M/s DEL: The fire blanket was found damaged and sparks were observed falling through the Tank D door opening. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-17 | Unsafe Act | Procedure | At Tank #30, M/s DEL: Workers were observed wearing damaged, loose-fitting coverall. Some workers were also found wearing PRL’s non-approved coveralls. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-18 | Unsafe Act | PPE | At DEL yard and at tank #30 M/s DEL worker was found wearing damaged welding shoes and mechanical supervisor was working without safety gloves. | Tank Farm | DEL yard and at tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Condition | Procedure | Tank #35: Permanent stair railing was damaged. | KOR Refinery | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Act | Electrical | Tank #11: M/s ATL worker was observed sitting on an energized extension board. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-18 | Unsafe Act | PPE | At tank #30 and at tank #21, M/s DEL workers were found wearing damaged coverall, with rolled-up sleeves and loose-fitting coveralls and some workers were also found wearing PRL’s unapproved safety helmets. | Tank Farm | Tank #30 & 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-18 | Unsafe Act | PPE | At tank #30, M/s DEL welder was found working without wearing helmet and found wearing damaged welding gloves. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-18 | Unsafe Condition | Procedure | At tank #30, M/s DEL: Improper placement of sharp-edged plates was observed. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Condition | Procedure | Tank #11: Tarpaulin was used as a fire blanket, which is not fire-resistant.8 | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-18 | Unsafe Condition | Electrical | At tank #21, M/s DEL: Poor cable management was observed. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Act | PPE | Tank #11: M/s ATL workers were performing simultaneous operations (SIMOP) (welding in the upper area and cleaning work in the lower area). | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Act | PPE | Tank #30: M/s DEL worker used the stairs without wearing a chin strap and without gloves. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-18 | Unsafe Condition | Electrical | At tank #30, tank #2 and at M/s DEL yard: Electrical DBs and extension boards receptacle caps were found damaged/ missing. | Tank Farm | Tank #30 & 02 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Act | PPE | Tank #30: M/s DEL generator operator was working without wearing gloves, safety goggles and hearing protection. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-18 | Unsafe Condition | Environment | Near M/s ATL yard: Drums containing combustible materials were found overloaded, needs to be removed. | Tank Farm | Near M/s ATL yard | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-19 | Unsafe Act | Procedure | At Tank #04, M/S IIW worker was found working on the top platform without hooking his safety harness. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Condition | Slip/Trip/Fall | Tank #4: Scaffolding plank was found on the main walkway, creating a tripping hazard. | Tank Farm | Tank #4 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-19 | Unsafe Condition | Procedure | At Tank #04, M/S IIW, the gas cylinders were not covered with a fire blanket. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Condition | Work at Height | DEL Yard: Worker sitting under an incomplete, red-tagged scaffolding shade. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-19 | Unsafe Condition | Procedure | At Tank #04, M/S IIW, during crane operation, one side of the work area was not barricaded. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Act | Procedure | DEL Yard: Worker was found wearing two-piece coverall. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-19 | Unsafe Condition | Housekeeping | Near Tank #32, M/S N.H, poor housekeeping was observed, leftover materials needs to be removed. | Tank Farm | Tank #32 | Construction | CONTRACTOR | NH | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-11 | Unsafe Act | Lack of Supervision | Tank #4: The generator operator was sitting near running equipment without hearing protection. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-19 | Unsafe Condition | Procedure | At Tank #21, M/s DEL, during stair repair work, the hot work area was not covered with a fire blanket | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-10-31 | Unsafe Condition | Equipment | At tank # 55, a hose pipe hanging form the roof of tank which needs to be removed. | KT | Tank #55 | OM KT | PRL | | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Act | Work at Height | At Tank #56, M/s AJC, welder was found working at height without hooking his safety harness hook. | KT | TANK# 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-07-09 |
| 2025-10-31 | Unsafe Condition | Procedure | Bottom pad of tank # 55 found damage needs to be repaired to avoid further deteriorate. | Tank Farm | Tank #56 | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Equipment | At DEL yard M/s DEL, during a safety visit, it was observed that the gas cutter was neither properly closed nor in working condition. However, the gas supply was left open through the regulators, and the equipment was not covered with a fire blanket. | KOR Refinery | De | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-04-05 | Unsafe Condition | Work at Height | At DEL Yard, M/s DEL, scaffolder working on pipe without proper planks. | KOR Refinery | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-10-31 | Unsafe Condition | Procedure | At multiple locations (KT) inside the tank yards and along the roads, wild bushes have grown which needs to be removed. The removal activity by the civil team was in progress. However, the team was requested to expedite the job. | KT | Multiple Locations | Civil | PRL | | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Act | PPE | At Tank #11, M/s ATL ,Worker’s -welding/grinding without dust masks and earplugs. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-06-08 | Unsafe Act | PPE | At the DEL Yard, during grinding work, a worker was observed wearing a scarf wrapped around his head. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Procedure | At Tank #35, M/s IIW ,material trolley found without stoppers. | KOR Refinery | TANK# 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-06-08 | Unsafe Act | PPE | At Tank #04, some workers of M/s IIW were using damaged rigging gloves. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Act | Work at Height | At Tank #04, M/s IIW , workers manually handling 20 ft 2 scaffolding pipes. | KOR Refinery | TANK# 04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-06-08 | Unsafe Condition | Housekeeping | At tank#35, diesel-filled jerry cans were found stored outside the secondary containment area, as the designated containment area was already occupied with drums. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Act | PPE | At Tank #35, M/s IIW, supervisor not wearing safety goggles during civil work. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-11 | Unsafe Act | Work at Height | At tank #04: A mobile scaffold was relocated with an M/s IIW worker still standing on it. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Procedure | At Tank #30, M/s DEL, miller stand was found road#04 without stoppers. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-11 | Unsafe Condition | Procedure | At tank #04: During gas cutting activity, M/s IIW rigger was standing beneath the hot work area. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Act | Procedure | At Tank #11, M/s ATL ,welding done without following confined space entry procedure. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-11 | Unsafe Condition | Work at Height | At tank #04: while holding a C-channel, M/s IIW worker was observed on scaffolding without wearing a safety harness. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-11 | Unsafe Act | PPE | At tank #21: M/s DEL worker was observed wearing damaged rigging gloves. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Procedure | Tank#56,M/s AJC, during crane operations at Tank #56, no safety personnel was present at the site. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-11 | Unsafe Act | Procedure | At tank #30: A welder was performing welding work without wearing welding shoes. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Act | Line of Fire | Tank#56,M/s AJC, during crane operations, one fitter entered the fire line zone, which is unsafe. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Act | PPE | At road #4, during crane activity, M/s DEL workers were observed not wearing approved safety helmets and safety shoes. Additionally, the rigging supervisor was not wearing a PRL-approved coverall. | Tank Farm | Road #4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Equipment | Tank#56,M/s AJC, the generator (200 KVA) distribution board (DB) door was found open/not properly closed. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Condition | Procedure | At tank #30, during crane operations, gas cylinder of M/s DEL was found within the crane boom radius. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Act | Procedure | Tank#56,M/s AJC, during fit-up activities, U-type fittings were not secured with a safety chain. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Act | Procedure | At tank #30, M/s DEL workers were observed crossing over pipelines instead of using proper passage. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-05 | Unsafe Condition | Procedure | Tank#56,M/s AJC, Loose materials (fit-up fittings) were not properly segregated or barricaded. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Condition | Procedure | At Tank #30, during the inspection of the crane and lifting gears, two 8-ton shackles were found without valid third-party inspection certificates. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Electrical | Tank#56,M/s AJC, A damaged receptacle was observed on the electrical board. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Condition | Procedure | At Road No. 01, during work in a temperature of 34°C, workers were not provided with sweet drinking water or cold water. | Tank Farm | Road No. 01 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Act | Procedure | Tank#56, M/s AJC, during back grinding work on a temporary platform, a loose/unfixed stool was used, which is unsafe. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Condition | Equipment | At Road No. 01, diesel was being filled into the generator without a pump. | Tank Farm | At Road No. 01, | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-13 | Unsafe Act | PPE | M/S DEL Yard: One gas cutting operator was working without gloves, and another worker was wearing damaged gloves | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Work at Height | Tank#56,M/s AJC, A grinder was being lifted using a rope tied to it outside the tank area, which is unsafe. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-13 | Unsafe Condition | Electrical | M/S DEL Yard: A worker was using a damaged welding cable. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-13 | Unsafe Condition | Lack of Supervision | Tank #4 – M/S IIW: During crane activity, the rigging supervisor was not present at the worksite | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-13 | Unsafe Condition | Environment | Tank #4 – M/S IIW: During the soap test, gas leakage was found from the cylinder regulators. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-13 | Unsafe Act | Procedure | Tank #21 – M/S DEL: A worker was wearing a damaged coverall and had used banding wire to tie the sleeves. | Tank Farm | Tank #21 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-13 | Unsafe Condition | Procedure | Tank #4 – M/S IIW: During crane activity, a gas cylinder was found within the crane boom radius. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-04 | Unsafe Condition | Procedure | At Tank 35 (M/S IIW), A damaged wheelbarrow was found using by worker. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-06-03 | Unsafe Condition | Slip/Trip/Fall | Tank #04:M/s IIW. MS plates were lying scattered in the yard, creating a tripping hazard. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-03 | Unsafe Condition | Procedure | Tank #04: M/s IIW. During crane movement flagman was found without flag. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-03 | Unsafe Condition | Housekeeping | Tank #04: M/s IIW. During crane operations, a gas cylinder trolley was placed within the barricaded area. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-03 | Unsafe Act | PPE | Tank #04: M/s IIW. Workers were observed using damaged safety gloves. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-03 | Unsafe Condition | Slip/Trip/Fall | Tank #21: M/s DEL. The 50 KVA generator was repeatedly tripping when load was applied and requires inspection and corrective action. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-04 | Unsafe Condition | Procedure | At Tank #04, oil traces were observed near the hot work activity area. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-04 | Unsafe Condition | Procedure | At Tank #04, during crane movement, sub-standard flag was being used for signaling. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-04 | Unsafe Act | PPE | At Tank #04, some workers were using PRL’s unapproved safety gloves. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-04 | Unsafe Condition | Procedure | At Tank #04, a loaded dumper was moving on Road No. 16 without a flagman. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-04 | Unsafe Condition | Procedure | At the IIW Yard, during ambulance inspection, the low-fuel warning indicator was ON and the fuel gauge showed empty. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-04 | Unsafe Condition | Housekeeping | At the IIW Yard, MS plates were found lying in the fabrication yard without barricading, creating a safety hazard. | Tank Farm | IIW YARD | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-04 | Unsafe Condition | Housekeeping | At the IIW Yard, gas cylinders in the storage area were found without securing chain. | Tank Farm | IIW YARD | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-04 | Unsafe Condition | Equipment | At Tank #30, diesel leakage was observed from the lift pump of a 100 KVA generator. | Tank Farm | Tank #30 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-06 | Unsafe Act | Lack of Supervision | M/s DEL yard, during welding activity, wielding supervisor was wearing non-compatible clothing (Romal). | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-06 | Unsafe Condition | Electrical | M/s DEL yard, a welding lead was found damaged, the receptacle cap of an extension board was missing, a waste bin was overflowing and poor cable management were observed. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-06 | Unsafe Condition | Work at Height | TANK 21 M/S DEL; housekeeping was observed (bitumen, scaffolding materials and waste materials were found scattered in work area) and receptacle caps of distribution box were missing. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-06 | Unsafe Act | Falling Object | Tank #56, during wind girder fit-up work, M/s AJC worker was using a hammer without a tool tie | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-06 | Unsafe Condition | Procedure | At Tank #56, M/s AJC, during hot work activities, the area outside the tank shell was not covered with a fire blanket. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-06 | Unsafe Condition | Procedure | At Tank #56, M/s AJC, during crane operations, electrical fault was identified due to a fuse issue. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-18 | Unsafe Condition | Procedure | At tank#04, M/S IIW, during crane operation, an unbalanced load was being lifted. Counseling was conducted for the riggers and crane operator. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-18 | Unsafe Act | PPE | At Road #16, M/s NH Construction, one steel fixer was observed not wearing a safety helmet and safety goggles. Another worker was wearing damaged safety shoes, while one supervisor was observed wearing low-ankle safety shoes. | Tank Farm | Road #16 | Construction | CONTRACTOR | NH | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-18 | Unsafe Condition | Procedure | At tank#21,M/S DEL, Crane operation was being carried out at the site without proper area barricading. | Tank Farm | Tank #04 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-18 | Unsafe Condition | Slip/Trip/Fall | At Tank #04, M/s IIW, plate laying was found in an unbalanced condition with sharp edges, creating trip hazards. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-18 | Unsafe Condition | Line of Fire | At Tank #30, M/S DEL, during hot work, sparks were spreading outside the work area. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Condition | Procedure | At boiler # 03, two open pits were observed without proper covering; immediate covering is required. | Tank Farm | Tank #03 | Stationary | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Condition | Housekeeping | Tank # 56 (M/s AJC), poor housekeeping was observed in the work area. face shield, face masks, bending wires , and poorly managed cables around the workplace, creating slip and trip. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Condition | Procedure | Tank # 56 (M/s AJC) ,during wielding activity inside tank, the work area was not adequately barricaded, allowing uncontrolled access and creating a potential safety hazard for personnel. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Condition | PPE | Tank # 56 (M/s AJC) , a worker was observed working at height without using a tool tie, in addition, proper three-point contact was not maintained during movement, increasing the risk of fall and dropped objects. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Act | Electrical | Tank # 56 (M/s AJC) , electrical extension board cable was found loose from gland side, which may increase the risk of exposed wiring and risk of electric shock or fire. Immediate removed from the site. Proper tightening and securing are required. | KOR Refinery | TANK #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Act | PPE | Tank # 56 (M/s AJC), several workers were observed not wearing safety goggles ,while other were using unclear (foggy / blurry) goggles, reducing eyes protection, some workers found working without gloves and other were wearing inappropriate gloves , in addition several workers were using damaged safety shoes. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Condition | Equipment | At Tank #30,M/s DEL, a 100 KVA generator was found leaking oil during operation. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Condition | Procedure | At Tank #04, M/s IIW, hot work activities were being carried out outside the tank without a safety canopy. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Act | Work at Height | At Tank #04, M/s IIW, scaffolding materials were being lifted without using a bucket. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-19 | Unsafe Condition | Equipment | At Tank #04, M/s DEL, a 25 KVA generator was found in operation without an operator present. | Tank Farm | Tank #04 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-22 | Unsafe Condition | Procedure | At junction of Road no. 3 & 6: convex mirror found detached from pole, re-fix the convex mirror onto the pole. | Tank Farm | Road no. 3 & 6 | Stationary | CONTRACTOR | Stationary | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-24 | Unsafe Act | Work at Height | Tank#4 M/S IIW, the gas cutting operator was observed performing the task while standing on the scaffolding top rail. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-24 | Unsafe Condition | Procedure | M/S IIW, while work in progress, paramedic or ambulance driver were not available. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-24 | Unsafe Act | Lack of Supervision | Tank #21 M/S DEL , the safety supervisor was not present at the worksite. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-23 | Unsafe Condition | Slip/Trip/Fall | Tank#4 M/S IIW, workers coveralls were found damaged due to welding sparks, and some workers were observed wearing coveralls without reflective strips. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-23 | Unsafe Condition | Falling Object | Tank#4 M/S IIW, MS plates, pipes and angles were found on walkway. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-10-31 | Unsafe Condition | Procedure | At multiple location (tank yard # 55 & 53), oil traces were observed. The areas need to be properly dressed up and cleaned. | KT | Tank 55 & 53 | OM KT | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-13 |
| 2025-10-31 | Unsafe Condition | Procedure | At tank yard # 55, some left civil debris found, needs to be removed. | KT | Tank #55 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-13 |
| 2025-10-31 | Unsafe Condition | Falling Object | At the civil store, poor stacking of materials was observed. Proper stacking is required to prevent objects from falling. | KT | KT | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-13 |
| 2025-10-31 | Unsafe Act | Procedure | At workshop, oil can was found without secondary containment. | KT | KT | OM KT | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-13 |
| 2025-10-31 | Unsafe Condition | Procedure | The walkway leading to Tank Yard 57 from Road 3 was obstructed by wild bushes. | KOR Refinery | Tank Yard 57 | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-31 | Unsafe Condition | Housekeeping | Poor housekeeping was observed behind the fire water pump house, scrape needs to be dump at designated location. | KT | KT | OM KT | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-13 |
| 2025-10-31 | Unsafe Condition | Procedure | At Road 3, sandblasting grit was found exposed to the open air and scattered on the surface. It needs to be properly collected and stored. | KT | KT | OM KT | PRL | | Routine | | Kemari Terminal | team | Closed | | 2026-07-13 |
| 2025-10-31 | Unsafe Condition | Environment | At the workshop, mixed waste was observed in a single bin. Waste needs to be disposed of separately as per the markings on the bins | KT | Workshop | OM KT | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-13 |
| 2025-10-31 | Unsafe Condition | Procedure | At multiple locations, some civil cracks were observed, needs to be repaired. | KOR Refinery | Multiple Locations | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-30 | Unsafe Condition | Procedure | At road # 12, road found damage which needs to be repaired to avoid further deteriorate. | KOR Refinery | Road 12 | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-30 | Unsafe Condition | Housekeeping | At multiple locations ( near local decanting, near ISOM), poor housekeeping was observed. | KOR Refinery | Multiple Locations | A&S | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-30 | Unsafe Condition | Procedure | At road # 10 electrical sub-station, wild bushes found with transformer which needs to be removed. | KOR Refinery | Road 10 | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-29 | Unsafe Condition | Environment | At scrap yard, poor waste management was observed (waste found mix), which needs to be properly segregated and dumped as per marking. | KOR Refinery | Scrap Yard | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-29 | Unsafe Condition | Procedure | Near Electrical rest room, newspapers placed between the wires or inside the electrical distribution board can increase the risk of fire which needs to be removed. | KOR Refinery | Electrical Rest Room | Electrical | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-29 | Unsafe Condition | Procedure | A wooden piece was observed misaligned between the support and the fire water pipeline for Hydrant #12, potentially affecting the pipeline’s support and integrity. | KOR Refinery | Hydrant 12 | Stationary | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-29 | Unsafe Condition | Electrical | At electrical workshop, single drum is being used for dumping waste without any marking. | KOR Refinery | Workshop | Electrical | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-29 | Unsafe Condition | Slip/Trip/Fall | At electrical workshop, improper stacking of material was observed. | KOR Refinery | Workshop | Electrical | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-10-29 | Unsafe Condition | Procedure | At electrical workshop, improper stacking of material was observed. | KOR Refinery | Electrical Workshop | Electrical | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-10-29 | Unsafe Condition | Electrical | At outside electrical workshop, oxygen cylinder was found with damage pressure gauges and hazardous material were scattered on the floor. | KOR Refinery | Workshop | Electrical | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-10-29 | Unsafe Condition | Environment | At mobile workshop, oil/ HSD drum found placed outside the secondary containment and some empty drum placed outside the workshop. | KOR Refinery | Mobile Workshop | Operation | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-10-30 | Unsafe Condition | Slip/Trip/Fall | An empty lube oil drum was found placed in front of Hydrant #11, obstructing access and creating a potential safety hazard. | KOR Refinery | Hydrant # 11 | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-10-30 | Unsafe Condition | Housekeeping | At WMS store, poor housekeeping was observed, including safety helmets and coveralls scattered on the floor, improper management of electrical cabling, broken almirah door, and damage false ceiling, which poses a potential falling object hazard. | KOR Refinery | WMS Store | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-10-30 | Unsafe Condition | Electrical | Electrical cabling at the WMS office was found poorly managed, and a non-industrial extension board was in use, posing a risk of electrical hazard | KOR Refinery | WMS Office | Construction | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-27 | Unsafe Condition | Procedure | At Tank #05, unavailability of HSE officer was observed during hot work activity. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-07 | Unsafe Condition | Lack of Supervision | At Boiler #01, the ventilation system was initially unavailable during the confined space tube replacement job but was promptly arranged after informing the Stationary Supervisor. | Plant Area | Boiler #01 | Stationary | CONTRACTOR | SWIFT | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-07 | Unsafe Condition | PPE | At boiler # 01,during the confined space tube replacement job, confined space entry log sheet was not available. Informed HSE supervisor. | Plant Area | Boiler # 01 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-10-29 | Unsafe Act | PPE | At tank #05 , during the scaffolding materials shifting one worker not wearing a safety gloves, informed to HSE supervisor counseling done. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-07 | Unsafe Act | Lack of Supervision | At Tank #11, parallel activities were observed during the wind guard reinforcement work. The HSE Supervisor was informed, and safe distance was ensured. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-11-05 | Unsafe Act | Lack of Supervision | At tank#11,One welder’s coverall was damaged, which may lead to injury or fire hazard during welding activities. Informed to HSE Supervisor. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-05 | Unsafe Act | Electrical | At tank#11,The ventilation fan’s wire dressing was not done properly, leaving cables in a disorganized and unsafe condition. Informed to HSE supervisor. | Tank Farm | Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2025-11-16 | Unsafe Act | PPE | At tank # 05, during confined space cleaning work, workers were not wearing safety goggles. Informed to SBM and wearing PPEs as per job requirements. | Tank Farm | At Tank # 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-16 | Unsafe Condition | Electrical | At tank # 05, during the hot work , the electrical cable was not properly organized. Informed to HSE supervisor. | KOR Refinery | At Tank # 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-14 | Unsafe Act | Procedure | At tank # 05, ATL worker was not wearing safety gloves while closing the Electrical cables. Informed HSE Lead. | KOR Refinery | TANK# 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-16 | Unsafe Condition | Housekeeping | At tank # 11, during the safety round poor housekeeping was observed at the back side of the tank. Informed to HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-11-16 | Unsafe Condition | Housekeeping | At Tank #11, loose material was found on the scaffolding platform. The HSE supervisor was informed and the loose materials were removed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2025-11-14 | Unsafe Act | PPE | At tank #11, ATL worker not wearing a safety goggle at workplace. Informed to HSE supervisor. | Tank Farm | Tank #11 | Electrical | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-13 | Unsafe Act | Procedure | At tank # 05, SGS inspectors entered the confined space for a calibration without having a valid confined space medical fitness test. Informed to Construction team. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-11-13 | Unsafe Condition | Work at Height | At tank #11,during the welding work found the welding cable was damaged. Informed to HSE supervisor and immediately replace the welding cable. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-13 | Unsafe Act | Work at Height | At tank #11, mechanical work at height started without HSE personnel present and without supervision. Informed to Construction team. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-11-13 | Unsafe Condition | Electrical | At tank #11, during welding work, the male and female joints of the welding cable were found melted. Informed HSE supervisor and immediately replace. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-10 | Unsafe Act | Electrical | At tank#11, ATL workers during tank inside grinder machine using not wearing an ear plug .informed the HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-10 | Unsafe Condition | Lack of Supervision | At tank#05,The ATL crane performed a lifting operation ,but after it went out of order, Mr. Sankar sb. PRL did not inspect it. Informed HSE supervisor. | Tank Farm | At Tank#05 | Construction | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-10 | Unsafe Condition | Work at Height | At tank #05, scaffolding was installed for lifting and holding the valve, but the inspection tag was not attached. Informed HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-10 | Unsafe Condition | Lack of Supervision | At tank #05,the workers removing water from the confined space were not wearing gum boots ,informed Mr. Usman sb and HSE supervisor. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-10 | Unsafe Condition | Slip/Trip/Fall | At tank #05,sacaffolding material is scattered ,not barricaded ,and it is a tripping hazard .informed HSE supervisor. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-10 | Unsafe Condition | Procedure | At Tank #05, the mesh in front of the ventilation fan was damaged. informed to HSE supervisor and Mr. Usman sb. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-12 | Unsafe Condition | Housekeeping | At road 6, the manifolds of tanks 15, 18, 19, 22 and 23 are blocked due to hard barrication around the excavation area and metal planks have not been placed for access to the manifolds. | KOR Refinery | Road #6 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-17 | Unsafe Condition | Lack of Supervision | At tank # 11, during confined space mechanical work, the ventilation system was not being used. Informed to HSE supervisor. | Tank Farm | At Tank # 11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-17 | Unsafe Condition | Vehicle | At tank # 05, flagman was not available for the movement of heavy vehicle (concrete mixture machine). Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-17 | Unsafe Condition | Housekeeping | At tank # 05, grinder was found placed on surface instead of stand. Informed to HSE supervisor. | KOR Refinery | TANK# 5 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-11-18 | Unsafe Condition | Falling Object | At Tank 5, access to the confined space is posing a falling hazard due to excavation. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-23 | Unsafe Condition | Procedure | Tank#4 M/S IIW, the material shifting trolley rear site tire was found damaged. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-23 | Unsafe Condition | Line of Fire | Tank#30/21 M/S DEL, welding sparks were spreading outside the tank. | Tank Farm | Tank #30 & 21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-12 | Unsafe Condition | Falling Object | At Tank #56, during hot work activities, parallel activities were observed and sparks were falling to ground where the hot work area was not properly covered. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2025-11-18 | Unsafe Condition | Equipment | At tank 5, grinder stand was not available at the site. The HSE supervisor was informed. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-12 | Unsafe Act | Procedure | At Tank #56, during welding work at the D-door, burned spots were found on the welder’s coveralls and he was not using a welding apron or safety sleeves. | Tank Farm | Tank #30 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2025-11-18 | Unsafe Condition | PPE | At tank 5, Parallel activities were observed, welding work in the upper area and scaffolding modification in the lower area. The activities were stopped immediately and the team was counseled at the site. | KOR Refinery | TANK #5 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-12 | Unsafe Act | Procedure | At Tank #56, during the lifting operation, the rigger was handling the suspended load by hand and the signalman was not wearing a safety jacket. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2025-11-18 | Unsafe Act | PPE | At tank 11, parallel activity was observed, welding work on above area and scaffolding modification in below area. Immediately stopped the activity and counseling of team was done at site. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-12 | Unsafe Condition | Procedure | At Tank #56, the gas cutter regulator gauge glass was found missing. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2026-05-12 | Unsafe Act | Procedure | At Tank #56, during the lifting operation while removing the shackle, the rigger had hooked his harness onto the shell plate. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2025-11-18 | Unsafe Condition | Procedure | At Tank 11, out of the two exhaust fans, one was found out of order. | Plant Area | Tank #11 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-11-18 | Unsafe Act | Procedure | At Tank #11, operating handle of fire extinguisher was found damaged. HSE supervisor was informed. | KOR Refinery | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-14 | Unsafe Condition | Housekeeping | At M/s IIW yard, gas cylinders weren’t protected with fire blankets during gas cutting work and the gas cylinders were placed nearby hot work area. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-14 | Unsafe Act | Electrical | At M/s IIW yard, a worker was observed performing grinding work without wearing earplugs. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-14 | Unsafe Condition | Procedure | During nozzle cutting activities at Tank #04, it was observed that M/s IIW had not properly cleaned the sludge from the inside of the nozzle. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-14 | Unsafe Condition | Electrical | During reinforcement installation at Tank #04, it was observed that the welding earthing lead used by M/s IIW was damaged. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-14 | Unsafe Condition | Slip/Trip/Fall | During hot work and fit-up activities at the bottom of Tank #04, housekeeping was found to be inadequate. Various materials, including welding eyes, wedges, U-clamps, and C-channels, were left scattered across the work area, creating tripping hazard. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-14 | Unsafe Act | PPE | M/s IIW welder at Tank #04 was found wearing a cloth mask during welding work. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-19 | Unsafe Condition | Environment | At Tank #11, unavailability of waste bin was observed. HSE supervisor was informed. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-15 | Unsafe Condition | Procedure | At Tank #4, reflective tape was found detached from the coveralls of several workers of M/s IIW. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-15 | Unsafe Condition | Line of Fire | At Tank #04, during MS plate laying activities, sparks were observed outside the canopy area. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-19 | Unsafe Condition | Electrical | At Tank #11, insulation of earthing cable was found damaged. | KOR Refinery | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-15 | Unsafe Condition | Work at Height | At Tank #04, the scaffolding walkway inspection tag was found expired. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-15 | Unsafe Condition | Electrical | At Tanks #21 and #30, during fit-up and bottom plate installation activities, housekeeping at the worksite was observed to be very poor, as welding and electrical cables, sharp-edged plates, wedges, and tools were scattered around the area. | Tank Farm | Tank #21 & 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-21 | Unsafe Condition | Housekeeping | At Tank #11, poor housekeeping was observed and the HSE supervisor was informed. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-04 | Unsafe Act | Procedure | At tank #4, M/s IIW workers were moving on a damaged roof without proper planks. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-04 | Unsafe Condition | Work at Height | At tank #4, loose materials (splash plates and GI sheets) were found lying on the scaffolding platform. | KOR Refinery | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-06-30 |
| 2026-05-04 | Unsafe Condition | Procedure | At tank #4, during roof cutting, two lifelines/ rope supports were found loose. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-04 | Unsafe Condition | Procedure | At tank #35, during shuttering material shifting, nails were exposed, which could cause cuts or injuries to workers. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-21 | Unsafe Condition | Housekeeping | At Tank #05, poor housekeeping was observed at the backside of the tank. | KOR Refinery | Tank #5 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-04 | Unsafe Act | PPE | At tank #30, during asphalt activities, workers were not using required (PPE), specifically safety goggles and face masks, exposing them to fumes, dust, and potential eye and respiratory hazards. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-11 |
| 2025-11-21 | Unsafe Condition | Procedure | At Tank #05, no rest shed was available. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Act | Work at Height | At tank #56, fitter was observed using a mini hammer while working at height without a tool tie. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-13 |
| 2025-11-26 | Unsafe Act | PPE | At Tank #05, while performing civil work, M/s ATL workers were found without wearing safety gloves & dust mask. Counseling done. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Condition | Procedure | At tank #56, during the crane operation, the fitter team was observed moving under the suspended load within the barricaded area. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2025-11-21 | Unsafe Act | Procedure | At Tank #05, construction staff Usman Sahib, Nizam Sahib, and ATL Shahid Lodhi were found inside the confined space without following the confined space entry protocol. There was no standby man available outside for entry monitoring. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-26 | Unsafe Condition | Housekeeping | At Tank #11, poor housekeeping was observed around tank yard. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-05-06 | Unsafe Condition | Housekeeping | At tank #56, poor housekeeping was observed inside tank, as binding wire pieces, a used grinding disk, and cotton rags were left on the floor. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Condition | Work at Height | At tank #56, during pipeline and wind girder banding work, the installed scaffolding structure was found with a green tag that did not mention an expiry date. | Tank farm | TANK# 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2025-11-21 | Unsafe Act | Electrical | At Tank #05, the electrical team was working on electric cables without wearing safety gloves. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Act | Procedure | At tank #56, during welding work at the manhole, the welder was observed not using a welding apron or sleeves, and the coverall was found in poor/damaged condition. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2025-11-26 | Unsafe Act | Work at Height | To mitigate the risk of falling objects at Tank #11, mesh was not found installed beneath the scaffolding structure. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Condition | Equipment | At tank #56, 100 KVA generator was observed operating with engine oil seepage. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Condition | Work at Height | At tank #56, during pipeline banding, excessive load was placed on a scaffolding pipe, causing it to bend. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Act | Work at Height | At tank #56, during back grinding work, a worker was moving on top of scaffolding without hooked safety harness. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2025-11-25 | Unsafe Condition | Lack of Supervision | At Tank #05, excavation was found without barrication. HSE supervisor was informed. | KOR Refinery | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Act | Procedure | At tank #56, during plumb inspection, a worker was observed hooked his harness on shell plate. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2025-11-24 | Unsafe Condition | Lack of Supervision | At Tank #11, waste bins were found filled with waste. HSE supervisor was informed. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-09 | Unsafe Act | Procedure | At Tank # 30, workers were found using stairs which alternate steps had been cut down. Counselled the staff. | Tank farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-09 | Unsafe Condition | Procedure | At Tank # 30, during hot work activities, the fire blanket was found in damaged condition. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-09 | Unsafe Condition | Procedure | At Tank # 30, loose materials were found on the stair steps. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-24 | Unsafe Condition | Lack of Supervision | At Tank #11, M/s ATL QC person was found at height with hooking his harness hooks. Counseling done. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-09 | Unsafe Condition | Equipment | At Tank # 30, while using the stairs, workers were not following the three-point contact rule, and materials/equipment were being handled improperly. Counselled the staff. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-24 | Unsafe Condition | PPE | At Tank #05, grinder operator was found without wearing safety gloves and ear plugs. Counseling done. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-09 | Unsafe Condition | Procedure | At Tank # 35, the dustbin found overflow, needs to be emptied. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-09 | Unsafe Condition | Housekeeping | At Tank # 35, during the safety round, housekeeping at the site needs to be improved. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-09 | Unsafe Condition | Procedure | At Tank # 35, during the safety round, diesel containment was found improper. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-24 | Unsafe Condition | Lack of Supervision | At Tank #05, poor housekeeping was observed and the HSE supervisor was informed. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-08 | Unsafe Act | Lack of Supervision | At Tank #04, during the crane operation, the rigging supervisor was not visible, and signals were being given by another worker instead of the designated rigger | KOR Refinery | TANK #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-08 | Unsafe Condition | Work at Height | At Tank #04, during crane operation, the suspended load (MS plate) was hitting the scaffolding structure. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-08 | Unsafe Condition | Procedure | At Tank #04, during gas cutting work, the gas cylinder hose was damaged/melted. Repetitive | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-08 | Unsafe Condition | Procedure | At Tank #04, during roof cutting work, loose materials were found on the damaged roof. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-08 | Unsafe Condition | Procedure | At Tank #04, During roof cutting work, the cut plates were being stacked on top of each other, while the roof condition was already deteriorated, creating an unsafe condition. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-08 | Unsafe Condition | Work at Height | 4. At Tank #04, during scaffolding material shifting, one scaffolder was crossing the product line. A proper platform is required. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-08 | Unsafe Condition | Equipment | At IIW Yard, during grinding work, 5” and 9” grinders were being used without Deadman switch installation, and the lock system was active. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-05-08 | Unsafe Condition | Procedure | At IIW Yard, during the safety round, the ambulance driver was not present. | Tank Farm | IIW Yard | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-27 | Unsafe Condition | Procedure | At Kargil area: The air filter of the breathing air compressor for sandblaster was missing. | Tank Farm | Kargil area | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-27 | Unsafe Condition | Work at Height | At Kargil area: The scaffolding rest was found without tagging. | Tank Farm | Kargil area | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-27 | Unsafe Condition | Vehicle | At Kargil area: A fire extinguisher handle was found damaged. Additionally, vehicle CAG-7981 was found without a fire extinguisher. | Tank Farm | Kargil area | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-27 | Unsafe Condition | Slip/Trip/Fall | At Kargil area: Multiple Metallic bars were scattered across the walkway, creating a tripping hazard. | KOR Refinery | Kargil area | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-27 | Unsafe Act | Procedure | At tank#35 M/s IIW ,during civil work, one worker was walking on steel reinforcement (rebar) using formwork wooden pieces with protruding nails, creating a risk of injury. | KOR Refinery | TANK# 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-27 | Unsafe Condition | Procedure | At tank#04 M/s IIW ,during gas cutting activities at the tank roof, the lifting pulley did not have a valid third-party inspection tag. | Tank Farm | Tank #04 | Electrical | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-29 | Unsafe Condition | Vehicle | At Road#16 (M/s DEL) : A truck GLBT- 767 was observed moving without a flagman, the designated flagman was found sitting inside the cabin with the driver. | Tank Farm | Road#16 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-29 | Unsafe Condition | Housekeeping | At Tank#35, 04 & at IIW Yard: Poor housekeeping was observed due to scattered materials, these areas need to be cleaned immediately. | Tank Farm | Tank#35, 04 & IIW Yard | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-29 | Unsafe Condition | Work at Height | At Tank#35: A wooden ladder was being used by M/s IIW workers. | Tank Farm | Tank#35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-29 | Unsafe Condition | Electrical | At DEL yard: Receptacle of electrical extension board was found damaged. | Tank Farm | DEL yard | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-29 | Unsafe Condition | Lack of Supervision | At Tank#21: The safety supervisor was not present at the site. | Tank Farm | Tank#21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-29 | Unsafe Act | PPE | At Tank#30: Some M/s DEL civil workers were wearing helmets not approved by PRL. | Tank Farm | Tank#30 | Stationary | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-28 | Unsafe Condition | Procedure | During lifting gear inspection at Tank #56, one lifting belt was found damaged and the tag line was improperly jointed. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-28 | Unsafe Condition | Equipment | At Tank #56, combustible materials were found on top of the power supply for automatic girth welding machine & its tumble was also found melt. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-06-24 |
| 2026-04-28 | Unsafe Condition | Electrical | At Tank #56, welding cables were not properly dressed at the backside of the tank. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2026-04-28 | Unsafe Condition | Work at Height | At Tank #56, one stool was observed placed on top of the scaffolding platform unsafe. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2026-04-28 | Unsafe Act | Line of Fire | At Tank #56, during crane operation, a worker was observed moving within the line of fire. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2026-04-30 | Unsafe Condition | Vehicle | The ready-mix truck was entering through the newly constructed gate while the flagman was standing outside Tank 35. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-30 | Unsafe Condition | Electrical | At Tank #35: A mixture filling pump was found without having a spark arrestor and battery terminals rubber boots. Furthermore, its tires were damaged, holes were observed on silencer and an open electrical circuit was also observed. | KOR Refinery | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-30 | Unsafe Condition | Line of Fire | At Tank #35: Vehicle No. TAR-047 was found operating without spark arrestor. Additionally, its tires are in poor condition with visible cuts/ damage. | KOR Refinery | TANK# 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-30 | Unsafe Act | PPE | At Tank #35: a ready-mix truck was found working without wearing safety helmet and shoes. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-20 | Unsafe Condition | Procedure | At Road#01: Access of MCP-21 was blocked due to the placement of new MS line, a proper walkway/ crossover is required for safe access. | KOR Refinery | Road#01 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-11-27 | Unsafe Act | PPE | At Tank #05, while performing excavation work, M/s ATL team were found without dust mask. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-28 | Unsafe Act | Work at Height | At Tank #11, grinder operator was found without wearing ear plugs. Counseling done. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-28 | Unsafe Act | PPE | At Tank #11, while handling of structural material M/s ATL worker was found without wearing safety gloves. Counseling done. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-28 | Unsafe Act | Procedure | At Tank #05, during hot job M/s ATL fire extinguisher was not available at site. Informed to Mr. Majid of M/s ATL. | KOR Refinery | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-28 | Unsafe Condition | Procedure | At Tank #05, no rest shed was available. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-28 | Unsafe Act | Procedure | At Tank #05, unavailability of HSE officer was observed during hot work activity. | KOR Refinery | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-28 | Unsafe Act | PPE | At tank 5, while performing excavation and masonry work, M/s Kundi workers were found working without wearing dust mask. Counseling done. | Tank Farm | Tank #05 | Civil | CONTRACTOR | Kundi | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-12-03 | Unsafe Condition | Procedure | At Tank #11, no rest shed was available. | KOR Refinery | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-12-01 | Unsafe Condition | Procedure | At Tank #11, loose materials were found on walkway without barrication. Informed to Mr. Majid of M/s ATL. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-12-01 | Unsafe Condition | Procedure | At Tank #11, operating lever of M/s ATL fire extinguisher was found damaged. Informed to Mr. Majid of M/s ATL. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-20 | Unsafe Act | Procedure | At Gantry substation: M/s Kundi workers were found performing work inside confined space without maintaining a SBM Entry sheet, additionally, the excavated area was not barricaded. | KOR Refinery | Gantry Substation | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-20 | Unsafe Condition | Line of Fire | At tank# 30: During hot work activity, the fire blanket was found to be damaged and not properly secured, failing to effectively prevent sparks. | KOR Refinery | At Tank 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-20 | Unsafe Condition | Housekeeping | At DEL Yard: Diesel drum was found on wooden pallet without secondary containment, additionally there is no secondary containment in storage area. | KOR Refinery | At DEL yard | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-26 | Unsafe Condition | Housekeeping | At DEL yard: Poor housekeeping was observed, waste bins were overflowing and found to contain discarded food items(roti) and used oil filters. | KOR Refinery | DEL Yard | Construction | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-20 | Unsafe Condition | Housekeeping | At DEL yard: Poor housekeeping was observed, waste bins were overflowing and found to contain discarded food items(roti) and used oil filters. | KOR Refinery | DEL Yard | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2026-04-20 | Unsafe Condition | Electrical | At Tank #21,M/s DEL. the electrical distribution board (D.B) scaffolding shade inspection tag was missing. | Tank Farm | Tank 21 | Construction | CONTRACTOR | Del | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2026-04-16 | Unsafe Act | PPE | M/s DEL workers handling tank bottom asphalt material were not using KN95 face masks. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-20 | Unsafe Condition | PPE | At Tank #35, M/s IIW worker was found working without wearing safety helmet. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-26 | Unsafe Condition | Work at Height | sscaffolding planks were stacked on the tank roof without being secured. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-25 | Unsafe Act | Lack of Supervision | M/S DEL , the safety supervisor was not present at the worksite. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-21 | Unsafe Condition | Falling Object | At Tank #56 (M/s AJC), the 100 KVA generator shed was not properly covered. Some GI sheets are missing, and the drip tray is too small. | KT | Tank #56 | Construction | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-06-24 |
| 2026-04-21 | Unsafe Condition | Lack of Supervision | At Tank #56 (M/s AJC), the Main Distribution Board (MDB) changeover handle is loose and requires immediate replacement for proper operation. | KOR Refinery | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-06 | Unsafe Condition | Work at Height | During pipeline banding, excessive load was placed on a scaffolding pipe, causing it to bend. | Tank farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-21 | Unsafe Condition | Vehicle | At Tank #56 (M/s AJC), the 45-ton mobile crane’s main block wire rope shows banding/ deformation. Crane must be inspected and corrective measures taken before further use. | KT | At Tank #56 | Construction | CONTRACTOR | ATL | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-21 | Unsafe Condition | Housekeeping | At Tank #56 (M/s AJC), welding cables were not properly dressed, creating a tripping hazard. | KT | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-07-09 |
| 2026-04-21 | Unsafe Condition | Work at Height | At Tank #56 (M/s AJC), while working at height two workers were found working without hooking their safety harnesses. | Tank Farm | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-06 | Unsafe Condition | Housekeeping | M/s AJC, gas cylinders were not properly secured with chains in the storage area and protective valve caps were not fixed. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-23 | Unsafe Condition | Procedure | At Tank #21, M/s DEL modified the scaffolding without applying a Red Tag. | Tank Farm | At Tank #21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2026-04-10 | Unsafe Condition | Work at Height | The railing supporting the lifeline scaffolding pipes is fragile. It needs to be repaired before proceeding with the next activity. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-23 | Unsafe Condition | Procedure | At Tank #21, a hand compactor operated by M/s DEL was found without a valid emission test certificate and an approved spark arrester. | Tank Farm | At Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-23 | Unsafe Condition | Procedure | At IIW store Area, bitumen cans were stored without secondary containment arrangement. | Tank Farm | At IIW Store Area | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-04-23 | Unsafe Condition | Work at Height | At Tank #04,M/s IIW, during lifeline installation, a scaffolder was observed moving on a damaged roof without proper planking. | Tank Farm | At Tank #04, | Construction | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-10 | Unsafe Act | Work at Height | One worker was observed sitting on a scaffolding pipe. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-23 | Unsafe Condition | PPE | At WWTP, Mr. Nasir and Mr. Zubair was performing welding work without using welding safety helmets. Additionally, the work area canopy was covered with a tarpaulin sheet without the use of a fire blanket. | Tank Farm | At WWTP | Construction | CONTRACTOR | SWIFT | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-02-12 | Unsafe Condition | Vehicle | The doors of two bowsers (TML-559 and TMN-332) were found locked. | Tank Farm | Gantry area | Logistic | CONTRACTOR | OMC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-04-24 | Unsafe Condition | Work at Height | At Tank #04,M/s IIW during the safety round, loose materials (Splash plates) were observed lying on the scaffolding platform. | Tank Farm | At Tank #04 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-24 | Unsafe Act | Procedure | At Tank #21, M/s DEL the HSE representative was not present at the worksite during asphalt activities. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-04-24 | Unsafe Condition | PPE | At Tank #21 and at Kargil area, M/s DEL workers involved in asphalt activities were not following proper PPE requirements (heat-resistant PPE and cartridge masks) were not being worn and the jeep driver was not wearing safety shoes. | Tank Farm | At Tank #21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-04-25 | Unsafe Condition | PPE | At Tank #04 (M/s IIW): A worker was observed not wearing safety goggles. | Tank Farm | At Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-03-31 | Unsafe Condition | Procedure | M/s IIW, during civil work, a dumper was being used without a functioning reverse alarm. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-26 | Unsafe Condition | Environment | Tank#56 M/s AJC, leakage of oil was observed from the tappet cover and fuel injector of 100 KVA generator. | Tank Farm | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-25 | Unsafe Condition | Line of Fire | Tank#56 M/s AJC ,during crane operations, an automatic girth welding machine was shifted at the top shell inside the tank without proper barricading of the work area, workers were moving within the line of fire. | Tank Farm | Tank#56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-25 | Unsafe Condition | Work at Height | Tank#56 M/s AJC, 4 nos of workers were observed on a scaffolding platform without hooking their safety harnesses. | KT | Tank#56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-24 | Unsafe Act | Procedure | At Tank #04, M/s IIW the gas cutter hose was not properly installed with double insulation using a flexible pipe. | KOR Refinery | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2025-07-20 |
| 2025-07-18 | Unsafe Condition | Slip/Trip/Fall | At tank #11, the fan for ventilation system was repeatedly tripping. HSE officer and site supervisor were informed and instructions to replace the fan were given. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-07-19 |
| 2025-07-03 | Unsafe Act | Procedure | At tank #13, a worker was observed shifting materials while using the stairs. As both of his hands were occupied, he failed to maintain three points of contact. The worker was counseled. | Tank Farm | Tank #13 | Civil | CONTRACTOR | WMS | Routine | | Korangi Refinery | | Closed | | 2025-07-04 |
| 2025-07-29 | Unsafe Condition | Procedure | Skid generator bottom frame need paint. | KT | Foam Tank | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-30 |
| 2025-07-29 | Unsafe Condition | Procedure | Skid generator concrete foundation damage. Need repair. | KT | KT | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2025-07-31 |
| 2025-07-28 | Unsafe Act | Vehicle | During the safety round at Tank #11, it was observed that an iron beam was loaded onto a Shehzor truck, but it was extending beyond the truck’s body, posing a risk of striking objects or causing accidents while in transit. This is for your information and necessary corrective actions. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-07-28 |
| 2025-08-09 | Unsafe Condition | Procedure | Crane Found with Indication. | KT | KT | Stationary | CONTRACTOR | AJC | Shutdown | | Kemari Terminal | | Closed | | 2025-08-10 |
| 2025-08-08 | Unsafe Act | PPE | At tank#05, a worker was observed inside the tank during sand blasting without wearing PPEs, informed to site HSE supervisor and worker consoling . | Tank Farm | Tank#05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-10 |
| 2026-07-15 | Unsafe Act | Ergonomics | testing from final | lahore | gate 2 | Civil | PRL | | Routine | | Korangi Refinery | Ahsan | Open | | |
| 2025-08-04 | Unsafe Act | PPE | At Tank #05, a rigger was observed not wearing gloves during the lifting operation. The rigger was instructed to wear proper hand protection (gloves) as per safety protocol. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-05 |
| 2025-08-07 | Unsafe Act | Housekeeping | The safety shoes of 3 AJC workers were found damaged. Immediately replaced. | KT | KT | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2025-08-09 |
| 2025-08-07 | Unsafe Act | Environment | A product line running from Tank 38 to Tank 01 had leakage from a valve, causing product dropping, inform Mr. Ijaz PRL(oil movement) The leaking valve was immediately reported to the concerned department, and the line was secured to prevent further spillage. | KOR Refinery | Tank Farm | Tank Farm | PRL | | Routine | | Kemari Terminal | team | Closed | | 2025-07-08 |
| 2025-08-16 | Unsafe Act | Line of Fire | At 801-J, sparks were hitting to the M/s UE worker stand nearby. Counseled the team. | Plant Area | At 801-J | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | | Closed | | 2026-08-17 |
| 2025-08-16 | Unsafe Act | PPE | At 801-J, M/s UE worker were not using safety gloves and wearing damage coverall during working. Counseled the team. | Plant Area | At 801-J | Stationary | CONTRACTOR | UE | Shutdown | | Korangi Refinery | | Closed | | 2025-08-17 |
| 2025-08-17 | Unsafe Condition | PPE | At AFC, while climbing a ladder, M/s DEL worker was found without wearing safety gloves. Counseling done. | Plant Area | At AFC | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-17 | Unsafe Condition | Electrical | 02 nos. DEL worker found at plant side without having safety induction stickers on their helmets. Counseled the team. | KOR Refinery | KOR Refinery | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-18 |
| 2025-08-18 | Unsafe Condition | Equipment | The same worker of M/s AG, who was found yesterday at Gate 3 without having undergone medical and safety orientation and was handed over to Mr. Shahzad of M/s WMS, was again found today near the fire camp. Upon investigation, it was revealed that his medical and safety orientation has still not been conducted. He has now been handed over to Mr. Fahad Alvi. | KOR Refinery | Gate# 3 | Stationary | CONTRACTOR | AG | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Act | Procedure | At the heat exchanger area, the towing jack of the hydro jetting machine was placed right next to the B1166:B1198 | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-18 | Unsafe Condition | Equipment | At road # 8, uncovered battery terminal was observed of WOMA machine. Informed to site supervisor. | Plant Area | At Road # 8 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-19 | Unsafe Condition | Housekeeping | At the heat exchanger area, spool piece was found on walkway, posing tripping hazard. | Plant Area | Furnace Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-20 |
| 2025-08-19 | Unsafe Condition | Procedure | At the heat exchanger area, the safety latch of the chain block is not properly fixed. It needs to be properly secured. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-19 |
| 2025-08-20 | Unsafe Condition | Procedure | At heat exchanger area, chain blocks & Stud bolt tray were found on walkway. Informed to DEL HSE representative for removal. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-20 |
| 2025-08-20 | Unsafe Condition | Procedure | At road 10, pressurize pipe of air compressor was found without whip latch. Informed to operator. | Plant Area | At Road# 10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-21 |
| 2025-08-21 | Unsafe Act | Work at Height | In front of the control room, PRL operations operator was found on scaffolding platform without hooking his safety harness, although he was wearing it. | Plant Area | Control Room | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-21 | Unsafe Act | Work at Height | At 1101-C, during a lifting operation, a DEL worker was observed holding the suspended load by hand instead of using a tag line. Additionally, DEL HSE supervision was not present at the time. The worker was not wearing safety harness while on the scaffolding platform, and the area was not properly barricaded. | Plant Area | At 1101-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2026-07-09 |
| 2025-08-21 | Unsafe Act | Housekeeping | Housekeeping required near heat exchanger, used disposable coverall were found on floor. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-21 | Unsafe Act | PPE | At AFC area, M/S DEL worker was found wearing unapproved coverall without reflector tapes and was found with folding sleeves. Informed the site supervisor and counseling done. | Plant Area | At AFC | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-22 |
| 2025-08-22 | Unsafe Condition | Procedure | The reverse alarm and spark arrestor of the DEL ambulance were missing, and a paramedic staff member was also absent today | Plant Area | DEL Ambulance | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Slip/Trip/Fall | At intersection of road 3 and 10, a tray loaded with oily rocks and sludge filled bags (pyrophoric material suspected) were observed, informed to Mr. Arsalan for removal. | Plant Area | At Intersection of road 3 and 10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Procedure | At heat exchanger area, a trolley carrying scaffolding material was observed parked without wheel chowks. Instructed to place wheel chowks. | Plant Area | Heat Exchanger Area | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-24 | Unsafe Act | Procedure | Since the start of the shutdown, the HSE lead for the night shift of M/s DEL has not reported. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | team | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Procedure | A hot job was carried out in the Utility and Pump Gallery, but no fire watcher from M/s DEL were available. | Plant Area | Utility and Pump Gallery | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Slip/Trip/Fall | At multiple locations (below area of AFC, utility, heat exchanger and pump gallery area) loose materials (pipes, nut/ bolts, exchanger head, gasket, valves ) were observed on the walkway without barrication. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Procedure | At 301-F while working at height, M/s DEL worker was using spanner without tie his tool with tool tether. | Plant Area | At 301-F | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Work at Height | At 304-C, while working at height M/s DEL TE was found scaffolding platform without wearing safety harness. Counseling done | Plant Area | At 304-C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Line of Fire | At the Utility and Pump Gallery, sparks were observed coming out of the welding canopy. The working team was immediately instructed to cover the area. | Plant Area | Utility and Pump Gallery | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Line of Fire | At plant center, during crane operation M/s DEL team standing in barricaded area. | Plant Area | At Plant Center | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Condition | Lack of Supervision | At 123C And 124C leftover material was found. Informed to M/s DEL’s safety supervisor. | Plant Area | At 123C And 124C | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Vehicle | At road 10 near fire camp,M/s DEL’s truck was observed carrying tent material upon inspection it was found that its battery terminals were not covered with rubber boots. Instructed to cover the battery terminals covered with rubber boots. | Plant Area | At Road 10 | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2025-08-22 | Unsafe Act | Housekeeping | At multiple locations (furnace area, road 5, heat exchanger area) mixed waste (hazardous and non- hazardous) were found, informed to M/s HSE supervisor. | Plant Area | Multiple Locations | Stationary | CONTRACTOR | DEL | Shutdown | | Korangi Refinery | | Closed | | 2025-08-23 |
| 2026-06-23 | Unsafe Act | PPE | At Tank #56, M/s AJC. during top shell fit-up work, a hammer was being used without a tool lanyard (tool tie). | KT | At Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-06-25 | Unsafe Act | PPE | Tank #21, Multiple workers were wearing damaged chin straps, and scratches were observed on their safety goggles. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2026-06-25 | Unsafe Act | Procedure | Tank #11 M/S ATL, confined space entry data sheet was not maintained during tank cleaning activity. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2026-06-25 | Unsafe Act | PPE | Tank #30, Multiple workers were wearing damaged chin straps, and scratches were observed on their safety goggles. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2026-06-25 | Unsafe Act | Work at Height | Tank #04 M/S IIW, during scaffolding modification, scaffolders were observed attaching lanyard hook to the same pipe. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2026-06-25 | Unsafe Condition | Procedure | Tank #21 MS DEL: The scaffold red tag had faded and turned white, making it difficult to identify the scaffold status. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2026-06-27 | Unsafe Act | Lack of Supervision | ROAD # 0 M/S IIW, the crane flagman was observed walking behind the crane during its movement. | KOR Refinery | ROAD # 0 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-27 | Unsafe Act | PPE | TANK #11 M/S ATL, workers were wearing damaged coveralls and safety shoes. | KOR Refinery | TANK #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-15 | Unsafe Condition | Equipment | Tank #4 – M/S IIW: During the soap test, gas leakage was found from the cylinder regulators. | KOR Refinery | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-06-15 | Unsafe Act | Equipment | At the IIW Yard, M/s DEL. crane operations for MS plate offloading were being conducted while the wind speed was 34 km/h. | KOR Refinery | At the IIW Yard | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-06-27 | Unsafe Condition | Environment | IIW YARD M/S IIW, waste bins were found full and poor housekeeping was observed in workshop. | KOR Refinery | IIW YARD | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-06-15 | Unsafe Act | PPE | At the DEL Yard, M/s DEL. during grinding work, a worker was observed not wearing ear plugs. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-06-15 | Unsafe Condition | Environment | At Tank #30, M/s DEL. a diesel leakage was observed from the 50 KVA generator. The generator should be replaced immediately. | Tank Farm | At Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-15 | Unsafe Act | Line of Fire | Tank #4 – M/S IIW: During crane activity, a gas cylinder was found within the crane boom radius. | KOR Refinery | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2026-06-15 | Unsafe Act | Procedure | M/S DEL Yard: A worker was using a damaged welding cable. | KOR | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-19 | Unsafe Condition | Housekeeping | Near Tank #32, M/S N.H, poor housekeeping was observed, leftover materials need to be removed. | Tank Farm | Tank #32 | Construction | CONTRACTOR | NH | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-30 |
| 2026-06-19 | Unsafe Condition | Environment | At Tank #21, M/s DEL, during stair repair work, the hot work area was not covered with a fire blanket | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-30 |
| 2026-06-19 | Unsafe Condition | Line of Fire | At Tank #04, M/S IIW, during crane operation, one side of the work area was not barricaded. | Tank Farm | At Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-01-30 |
| 2026-06-19 | Unsafe Condition | Procedure | At Tank #04, M/S IIW, the gas cylinders were not covered with a fire blanket. | Tank Farm | At Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-06-30 |
| 2026-06-20 | Unsafe Act | Procedure | At Tank #56: Inside the tank, a scaffolding structure had a red tag, but workers were still using it. Counseling done | KT | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-07-16 |
| 2026-06-20 | Unsafe Condition | Environment | At Tank #56: Oil leakage was observed from two engine sides of the 100 kV generator. Informed to Mr. Farrukh | KT | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-07-16 |
| 2026-06-20 | Unsafe Condition | Procedure | At Tank #56: the paramedic was absent from duty / No paramedic was available on-site. Informed to Mr. Farrukh | KT | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-07-16 |
| 2026-06-20 | Unsafe Act | Work at Height | At Tank #56: M/s AJC worker was found lifting too many wages at once on top of the tank. Counseling done | KT | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-07-16 |
| 2026-06-08 | Unsafe Act | Procedure | At tank#35, the potable stair being used to cross the ring wall was not properly fixed. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-08 | Unsafe Act | PPE | At the DEL Yard, welder was performing welding work without wearing a safety helmet. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Condition | Procedure | At tank #30, grinder of M/s DEL was found without a functional dead-man switch. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Act | PPE | M/S DEL Yard: One gas cutting operator was working without gloves, and another worker was wearing damaged gloves | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Condition | Electrical | M/S DEL Yard: A worker was using a damaged welding cable. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Act | Procedure | Tank #4 – M/S IIW: During crane activity, the rigging supervisor was not present at the worksite | Tank Farm | Tank #4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Act | Procedure | Tank #4 – M/S IIW: During the soap test, gas leakage was found from the cylinder regulators. | Tank Farm | Tank #4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Act | Procedure | Tank #21 – M/S DEL: A worker was wearing a damaged coverall and had used banding wire to tie the sleeves. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-06-12 | Unsafe Act | Line of Fire | Tank #4 – M/S IIW: During crane activity, a gas cylinder was found within the crane boom radius. | Tank Farm | Tank #4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-18 | Unsafe Condition | Equipment | At Tank #35, M/s IIW, a tractor with a punctured rear tire was found parked inside the tank ring wall and a substandard spark arrestor was installed. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-05-23 | Unsafe Act | Line of Fire | Tank#4 M/S IIW, a helper was standing under the gas cutting area while sparks were falling. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-29 | Unsafe Condition | Procedure | At Tank #21, a hydraulic jack was found at the worksite without having valid third-party report at site. | Tank Farm | Tank#21 | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-29 | Unsafe Act | Procedure | At Tank #35, during civil work for tank ring wall installation, workers were moving on an exposed steel structure. | Tank Farm | Tank#35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2026-04-21 | Unsafe Condition | Line of Fire | At Tank #56 (M/s AJC), during welding work, sparks were observed hitting two nearby fitters. | KT | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-07-09 |
| 2026-04-25 | Unsafe Condition | Line of Fire | At Tank #30 (M/s DEL): During splash plate hanger removal activity, sparks were observed spreading outside the work area. | Tank Farm | At Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-25 | Unsafe Condition | Environment | Tank#56 M/s AJC, leakage of oil was observed from the tappet cover and fuel injector of 100 KVA generator. | KT | Tank#56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-25 | Unsafe Condition | Procedure | Tank#56 M/s AJC, on the backside manhole scaffolding platform, planks were not securely tied. | KT | Tank#56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-25 | Unsafe Act | Line of Fire | At Road #6 (M/s DEL): During crane activity, a roller operator was positioned in the line of fire. | KOR Refinery | At Road #6 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-16 | Unsafe Act | Work at Height | At Tank #30, M/s DEL workers were carrying out scaffolding removal and tank bottom material handling at the same time. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-16 | Unsafe Condition | Procedure | At the access of Tank #04, backfilling and leveling were required. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-16 | Unsafe Act | Work at Height | At Tank #04, M/s IIW workers did not use a bag or bucket during scaffolding material lifting. | Tank Farm | At Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-15 | Unsafe Act | Procedure | At Tank #11, M/s ATL, a vacuum box test (VBT) was being conducted inside the tank while welding and grinding activities were carried out simultaneously. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Act | PPE | At Tank #11, M/s ATL, a worker was performing greasing and soap testing without wearing gloves and safety goggles, and his sleeves were folded. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-15 | Unsafe Act | Work at Height | At Tank #11, M/s ATL, a scaffolder was carrying out scaffolding work without properly tying and securing the planks. | Tank Farm | At Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-19 | Unsafe Act | PPE | Road#4 M/s DEL planning team staff was observed without wearing safety helmet. | KOR Refinery | Road#4 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-19 | Unsafe Act | Procedure | Tank#30 M/s DEL, the flagman was observed walking alongside the moving trailer, disregarding safe clearance distances. | KOR Refinery | Tank#30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-19 | Unsafe Act | Procedure | Tank#4 M/s IIW, there was no sitting arrangement for generator operator. | KOR Refinery | Tank#4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-19 | Unsafe Condition | Slip/Trip/Fall | Tank#4 M/s IIW, Electrical cables were observed lying unprotected on the ground and exposed on the walkway. | KOR Refinery | Tank#4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-19 | Unsafe Condition | Environment | Tank#4 M/s IIW, oil leakage was observed from the generator. | KOR Refinery | Tank#4 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-07 | Unsafe Condition | Falling Object | At Tank # 30: A splash plate hanger was observed falling from height during work activity, posing a risk of injury to personnel below. | Tank Farm | At Tank # 30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-07 | Unsafe Condition | Falling Object | At DEL Yard: MS sheets were found lying unsecured in front of the gas cylinder storage area. | Tank Farm | At DEL yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-07 | Unsafe Condition | Housekeeping | At DEL Yard: Poor housekeeping observed during safety round, need to clean the area. | Tank Farm | At DEL yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-10 | Unsafe Condition | Housekeeping | At outside area of Tank #56, Poor housekeeping was observed, welding slag was scattered at multiple locations. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-16 |
| 2026-04-10 | Unsafe Act | Work at Height | At Tank #56,M/s AJC, welder was found working at height without hooking his safety harness hook. | KT | At Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-16 |
| 2026-04-05 | Unsafe Condition | Equipment | Tank#56, M/s AJC, A fitter was carrying a grinder by hand while moving on a temporary platform without hooking his safety harness. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Equipment | Tank#56, M/s AJC, A fitter was carrying a grinder by hand while moving on a temporary platform without hooking his safety harness. | Tank Farm | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-09-09 |
| 2026-04-05 | Unsafe Condition | Work at Height | At Tank #30,M/s DEL, during the shifting of scaffolding materials to the tank roof via stairs, proper three-point contact was not maintained. | KOR Refinery | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2026-04-04 | Unsafe Condition | Procedure | At Tank4 (M/S IIW), A Trolley was found parked without stoper. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-04-04 | Unsafe Condition | Lack of Supervision | At Tank 11 (M/S ATL), The mechanical supervisor was not present at work while workers were performing wielding and grinding. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-04-04 | Unsafe Condition | Line of Fire | At Tank 21 (M/S DEL) during wielding and grinding operations that fire blanket was present but not suitable to withstand sparks or molten metals. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-04-04 | Unsafe Condition | Line of Fire | At Tank30 (M/S DEL) during wielding and grinding operations that fire blanket was present but not suitable to withstand sparks or molten metals. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-04-04 | Unsafe Condition | Housekeeping | At Tank 21(M/S DEL) Found site not properly dress up, housekeeping required. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-04-04 | Unsafe Condition | Electrical | At Tank 21 (M/S DEL) The electrical DB shade was found without the required scaffolding tag. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-04-04 | Unsafe Act | PPE | At M/S DEL yard, during crane maintenance work worker was found not using required PPEs (safety goggles and gloves) and work with folded sleeves. | Tank Farm | M/S DEL yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-07 |
| 2026-04-03 | Unsafe Condition | Procedure | At Tank#35: M/s IIW GI sheets found without proper barricading and are not in a secured condition. | Tank Farm | Tank#35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Electrical | At Tank#21: M/s DEL has no proper access to operate electrical DB, and There is no fire extinguisher near DB. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Environment | At Tank#30: No Waste Bins available on-site; bins need to be place immediately. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Environment | At Tank#21: No Waste Bins available on-site; bins need to be place immediately. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Procedure | At Tank#35: M/s IIW work is being carried out without the presence of a safety officer at the site. | Tank Farm | Tank#35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Electrical | Bird nests were observed inside MCP N1 & N2. Needs to be removed. | KOR Refinery | MCP N1 & N2 | Construction | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-03 | Unsafe Condition | Environment | The open oily pit near Tank 24 needs to be covered/closed immediately, as hot work is currently in progress at the adjacent Tank 21. | Tank Farm | Tank #21 | Construction | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Act | Procedure | At Tank #56, Materials were being lifted using only a rope without proper lifting methods (no bucket, tool bag, or pulley used) by M/s AJC workers. | Tank Farm | Tank # 56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-04-05 |
| 2026-03-30 | Unsafe Act | Procedure | At Tank 35, M/s IIW, during civil work, a tractor was being used with a spark arrestor that was not approved by PRL. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-03-28 | Unsafe Act | PPE | At tank-30-yard, M/s AKS workers (Usman, Qurban, Noor, Haneef, Siddiq) were found wearing damaged safety shoes | Tank Farm | Tank # 30 | Construction | CONTRACTOR | AKS | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-28 | Unsafe Act | Procedure | AT tank -35, The movement of M/s IIW excavator was observed without flagman. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-28 | Unsafe Act | Procedure | At tank-21, M/s DEL site safety supervisor was not present at site while work was being in process. | Tank Farm | Tank # 21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-27 | Unsafe Act | Procedure | At Tank #30, M/S DEL, during the replacement of the gas cylinder used for gas cutting, the cutting torch regulators were left open, which created a risk of fire. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-27 | Unsafe Act | Procedure | At Tank #30, M/S UE, M/s UE painter was found wearing damaged safety shoes. | Tank Farm | Tank #30 | Construction | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-27 | Unsafe Act | Equipment | At IIW Yard: Access of the generator was found blocked by another generator. Provide clear access for emergency situations. | Tank Farm | IIW YARD | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-27 | Unsafe Act | Equipment | At Road#12: GI sheet in the Generator Area was not tied properly. Secure all loose sheets immediately. | KOR Refinery | Road# 12 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-27 | Unsafe Act | Equipment | At DEL Yard: Two grinders were left attended on a conductive MS plate with the power supply still connected. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-27 | Unsafe Act | Procedure | At DEL Yard: The rest area is incomplete and a worker was observed sitting in the unfinished area. | Tank Farm | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-27 | Unsafe Act | Falling Object | At Road#1(Near Gantry): The pipeline is resting on temporary supports with stones used as wedges. Proper wedges must be installed to prevent the pipeline from falling | Tank Farm | Road #1 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Act | Work at Height | At Utility Area: M/s AKS worker was observed working at height without using tool tie. A falling object risk to workers below. | Tank Farm | Utility Area | Civil | CONTRACTOR | AKS | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Act | PPE | At Road#07: M/s QK workers were found performing soil-related tasks without wearing face mask and safety googles, leading to dust exposure. | Plant Area | Road#07 | Civil | CONTRACTOR | QK | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Act | PPE | At Road#12: M/s UE workers were observed working without safety gloves. | Plant Area | At Road#12 | Civil | CONTRACTOR | QK | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Act | PPE | At Road#07: M/s UE worker perform a work at height without tool tie, also supervisor is not present at the site | Plant Area | Road#07 | Civil | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Condition | Procedure | At Tank#11: The area needs to be properly barricaded as no work is currently in progress at the tank. | Plant Area | Tank#11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Condition | Environment | At DEL yard: Diesel leakage was observed from a compressor causing environmental contamination. | Plant Area | DEL yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Act | Work at Height | At DEL yard: M/s DEL worker was observed performing maintenance work of compressor at height without a ladder or stool. Also, work was being carried out without a valid maintenance permit. | Plant Area | DEL yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Act | Procedure | At Tank #30 (M/S DEL), unsafe activity was observed during the movement of empty and filled gas cylinders across the fire water line, posing a risk of personal injury. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-26 | Unsafe Act | PPE | At Condensate Decanting Area: M/s swift worker were working without hand gloves and safety goggles. Also, oily waste needs to be cleaned from the area. | Tank Farm | Condensate Decanting Area | Tank Farm | CONTRACTOR | SWIFT | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-30 |
| 2026-03-18 | Unsafe Act | Work at Height | At decanting Point 12: Bowser driver found walking on top of the bowser without connecting his safety harness to the fall arrestor. | Tank Farm | Decanting Point 12 | Logistic | CONTRACTOR | OMC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-18 | Unsafe Act | Work at Height | At decanting area: Bowser driver was observed in an unsafe posture, resting on the gantry’s swing ladder. | Tank Farm | Decanting Point | Logistic | CONTRACTOR | OMC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-25 |
| 2026-03-16 | Unsafe Act | Procedure | Road No. 1: M/s RE. Welders were observed wearing combustible cloth (romal/scarf) during welding work. | Tank Farm | Road No. 1 | Stationary | CONTRACTOR | RE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-15 |
| 2026-03-05 | Unsafe Act | Work at Height | Tank #21: M/s DEL workers were moving on scaffolding platforms that were tagged with a red tag. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-05 | Unsafe Condition | Electrical | Tank #21 (DEL): an extension lead with an improper joint was found and immediately replaced. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-05 | Unsafe Condition | Electrical | Tank #21 (DEL): the electrical cable of grinder was found without proper double isolation. | Tank Farm | Tank #21 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-06 | Unsafe Condition | Procedure | Tank #04 – M/s IIW: During gas cutting activity, the provided double isolation was found damage due to contact by the hot surface. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-06 | Unsafe Condition | Procedure | Tank #04 – M/s IIW: Workers’ rest shade was found incomplete and not properly arranged for worker comfort. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-03-06 | Unsafe Condition | Procedure | Tank #11- M/s ATL: During crane operation, workers were observed standing under the boom of crane. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-03-10 |
| 2026-02-23 | Unsafe Act | PPE | At Tank #11, during sandblasting work, two workers were observed without face masks and were immediately counseled. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-27 |
| 2026-02-23 | Unsafe Condition | Work at Height | At Road No. 03, scaffolding inspection tag missing at walkway ,tag immediately installed and corrected. | KOR Refinery | Road No. 03 | Construction | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-27 |
| 2026-02-27 | Unsafe Condition | Electrical | A welding rectifier was observed without earthing and bonding. Electrician were asked to install the same. | KT | KT | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-07-17 |
| 2026-02-27 | Unsafe Condition | Housekeeping | Poor housekeeping found inside tank#56 inform to AJC (HSE supervisor) Osama and removed all combustible materials. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-07-17 |
| 2026-02-23 | Unsafe Act | Line of Fire | At tank#56, welder helper exposed to welding sparks due to improper positioning , counseled on hot work safety and safe distance maintenance. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-27 |
| 2026-02-23 | Unsafe Act | Line of Fire | At Tank #56, rigger entered crane line of fire during lifting operation, counseled on exclusion zone and lifting safety. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-27 |
| 2026-02-23 | Unsafe Condition | Equipment | At Tank #11, during live generator operation, the authorized operator was absent, and a standby authorized person was arranged immediately. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-27 |
| 2026-02-23 | Unsafe Condition | Equipment | At Tank #04, a 20 KVA generator was operating without a protective shade. | TA | Tank #04 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-27 |
| 2026-02-23 | Unsafe Act | PPE | At Tank #30, a worker inside the tank was using a face mask with a damaged cartridge. | Tank Farm | Tank #30 | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-27 |
| 2026-02-23 | Unsafe Act | Procedure | At DEL yard, two scaffoldings were found without attached shade and inspection tags. | KOR Refinery | DEL Yard | Construction | CONTRACTOR | DEL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-27 |
| 2026-02-19 | Unsafe Condition | Electrical | At tank 56, AJC Welding Electrode oven was being used with expired electrical tag. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-17 | Unsafe Act | Electrical | At Tank #11: During vacuum testiAt backside of control room: Battery operated device was in use without prior tagging/ inspection by Electrical Department. Additionally, battery operated equipment was not ticked on the equipment to be used in hot work permit.
ng at the tank bottom, two workers were not using rubber gloves. | Plant Area | Control Room | Electrical | CONTRACTOR | Smart Climate | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-09 | Unsafe Condition | Vehicle | ATL Yard: The ambulance was found non-operational. The battery was discharged and the fuel pump was not functioning. | KOR Refinery | ATL Yard | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-02-09 | Unsafe Condition | Slip/Trip/Fall | DESCON Yard: Materials were not properly barricaded and were scattered, creating potential safety and trip hazards. | KOR Refinery | DESCON Yard | Construction | CONTRACTOR | DEL | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-02-09 | Unsafe Condition | Procedure | Tank No. 35: The damper driver was observed operating the vehicle without wearing a seat belt. | KOR Refinery | Tank No. 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-02-10 | Unsafe Condition | Line of Fire | At the FO Gantry Bay #2, bowser (TML-558) was found parked without wheel chocks and a spark arrestor, with the door locked. As per another bowser driver, the driver had left the refinery to have breakfast. | KOR Refinery | Gantry Bay #2 | Logistic | CONTRACTOR | OMC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Condition | Vehicle | At the Gantry area, the doors of two bowsers (TML-559 and TMN-332) were found locked. | KOR Refinery | Gantry Area | Logistic | CONTRACTOR | OMC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Condition | Procedure | At the Gantry area, no fire extinguisher was found in front of bowser (TML-559) and the light cover was missing, exposing the electrical circuit. | KOR Refinery | Gantry Area | Logistic | CONTRACTOR | OMC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Condition | Vehicle | At the Gantry area, the ignition key for bowser (JQ-5734) was not found in the ignition | KOR Refinery | Gantry Area | Logistic | CONTRACTOR | OMC | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Condition | Environment | At Road #02, the doors of the garbage, hazardous, and recycling waste yards were found broken and need to be repaired. | KOR Refinery | At Road #02 | Civil | PRL | | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Act | PPE | At Boiler-4, during insulation work at height, M/s Swift workers were not wearing helmet chin straps. | KOR Refinery | At Boiler-4 | Civil | CONTRACTOR | SWIFT | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Act | PPE | At the Heat Exchanger area, while carrying out filling work on the exchanger cover, an M/s Swift worker was found working without wearing gloves. | KOR Refinery | Heat Exchanger Area | Civil | CONTRACTOR | SWIFT | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Act | Slip/Trip/Fall | At Boiler #4, a spool piece was found lying on the walkway, posing a tripping hazard. | KOR Refinery | At Boiler #4 | Civil | CONTRACTOR | SWIFT | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-10 | Unsafe Act | Procedure | At the opposite side of Boiler #4, a used gaskets were found on the ground and needs to be removed. | KOR Refinery | At Boiler #4 | Civil | CONTRACTOR | SWIFT | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Act | Procedure | At laydown area: M/s U.E worker was found wearing a PRL-unapproved coverall (with metallic buttons and without reflective tape). | Tank Farm | At Laydown Area | Stationary | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Act | Equipment | At laydown area: The grinder was found in an energized condition, and an M/s UE worker had removed the used disc without isolating the power source. Additionally, no grinder stand was available. | Tank Farm | At Laydown Area | Stationary | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-02-11 | Unsafe Act | Equipment | At laydown area: The generator trolly was found without wheel chock. | Tank Farm | At Laydown Area | Stationary | CONTRACTOR | UE | Routine | N/A | Korangi Refinery | team | Closed | | 2026-02-20 |
| 2026-04-02 | Unsafe Act | Housekeeping | Tank #11: During sand blasting activities using an air compressor, multiple times tire puncher was observed. The defective component was replaced immediately. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Act | Housekeeping | Tank #11: During ongoing sand blasting and fabrication works, site housekeeping was found unsatisfactory, posing potential safety and operational risks. | Tank Farm | Tank # 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-04-02 | Unsafe Act | Housekeeping | Tank #35: During civil works, workers were observed using scratched safety goggles, which may compromise eye protection effectiveness. | KOR Refinery | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2026-02-02 | Unsafe Condition | Electrical | Tank #56: Welding machine and electrical DB found without inspection tags (AKS team not available on Saturday). | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-02 | Unsafe Condition | Vehicle | Tank #56: During lifting operation, the truck was strucked due to suspended load and improper tagline control; counseling done. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-02 | Unsafe Condition | PPE | Tank #56: Unapproved and non-100% cotton masks used during back grinding on tank shell. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-02 | Unsafe Condition | Procedure | Tank #56: Inadequate barricading observed during hot work activities (shell fitting and C-channel installation). | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-02 | Unsafe Condition | Work at Height | Tank #56: Scaffolding platform found unsafe and unsuitable for grinder operator to maintain a safe working position. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-02 | Unsafe Condition | Equipment | Tank #56: Grinder operator’s face shield found scratched and dirty, reducing visibility and safety. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-02 | Unsafe Condition | Electrical | At tank#56, AJC electrician was found working on electric supply board without gloves. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-02 | Unsafe Condition | Electrical | At tank#56, AJC electrician was found working on electric supply board without gloves. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-02-07 | Unsafe Condition | Work at Height | AJC inspection team was working at height without hooked safety harness. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-02-07 | Unsafe Condition | Work at Height | AJC welding machine #13 was being used without earthing. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-02-07 | Unsafe Condition | Work at Height | At KT, Poor housekeeping was observed. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-02-07 | Unsafe Condition | Work at Height | During crane operation AJC helper was moving under barricading area. Helper counseling was done. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-02-07 | Unsafe Condition | Work at Height | Damaged electric board# 11 was being used inside tank platform by AJC electrician. Electrical Bord was removed from site. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-10 |
| 2026-01-29 | Unsafe Condition | Procedure | Tank #56: During night-time welding activities, it was observed that the lighting was insufficient, with lux levels recorded at 35–41, below the required standard. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2026-01-29 | Unsafe Condition | Electrical | Tank #56: It was observed that the live main DB and welding machine were inadequately covered with a poly sheet, posing an electrical safety hazard. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2026-01-29 | Unsafe Condition | Electrical | Tank #56: It was observed that M/s AJC worker, Mr. Shazad, was using safety shoes that are not approved by PRL | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2026-01-29 | Unsafe Condition | Equipment | Tank #56: It was observed that the 100 kVA generator was in operation without a drip tray, posing a potential oil spill hazard. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-02-05 |
| 2026-01-24 | Unsafe Condition | Electrical | At tank #56, three electrical board was found withou proper insulation, electric board was removed from site and informed to AJC shahid. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-24 | Unsafe Condition | Electrical | At tank #56, Grinder #02 was found on site without electric tag, informed to AJC shahid. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-24 | Unsafe Act | PPE | At tank #56, M/s AJC workers were not wearing gloves and goggles on site, counseling was done and inform to M/s AJC HSE representative | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-23 | Unsafe Act | Equipment | At tank #56, One Grinder was found without safety guard on site; the grinder was removed from the site. | KT | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-01-26 |
| 2026-01-23 | Unsafe Act | PPE | At tank #56, AJC electrician was working on electric DP without safety gloves. | KT | Tank #56 | Construction | CONTRACTOR | AJC | Routine | N/A | Kemari Terminal | team | Closed | | 2026-01-26 |
| 2026-01-22 | Unsafe Act | Line of Fire | At Tank#56, AJC grinder men was grinding near crane operation, while the safety supervisor were at other side for site works. | KT | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-06-25 |
| 2026-01-19 | Unsafe Act | Work at Height | At tank #56, A temporary ladder was being used which was found lose from the fixing point, creating a fall hazard; informed HSE supervisor. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | PPE | At tank #56, M/s AJC workers were observed without safety goggles, informed to HSE supervisor. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | Electrical | At tank #56, A damaged electrical extension board was found in use at site, informed HSE supervisor AJC. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | Electrical | At tank #56, A 5" grinder electrical inspection tag was found damaged: informed HSE supervisor AJC. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | PPE | At tank #56, A worker’s safety shoes were found damaged which was immediately replaced after informing HSE supervisor. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | Procedure | At tank #56, A 200 KVA generator spark arrestor found installed with unapproved spark arrestor Informing HSE supervisor. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | Procedure | At tank #56, The ambulance spark found installed with unapproved spark arrestor. Informing HSE supervisor. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | Electrical | At tank #56, Electrical cable of extension box was found damaged; informed HSE supervisor. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | Electrical | At tank #56, Electrical cables were found lying on a wet surface at the workplace; informed HSE supervisor. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | Procedure | At tank #56, During crane operation lifting of MS plate, a 3-ton sling wire was found damaged, immediately removed from the site. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-19 | Unsafe Act | Procedure | At tank #56, During hot work activity a fire extinguisher was not available. Informed HSE supervisor. | KT | Tank #56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-25 | Unsafe Act | PPE | At tank # 35, during civil work, workers were found not wearing face masks. Informed to the HSE Supervisor. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-06-28 |
| 2026-01-22 | Unsafe Act | Procedure | At tank # 35, unsafe manual hammering observed during steel cutting. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-06-28 |
| 2026-01-22 | Unsafe Act | Equipment | At tank # 35, generator shade not installed at office area. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-06-28 |
| 2026-01-12 | Unsafe Act | Procedure | At tank # 56, the operator was not present on the running 200 KV generator. Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-11 |
| 2026-01-12 | Unsafe Act | Procedure | At tank # 56, paramedic was not present on site. Informed to HSE lead AJC. | Tank Farm | Tank # 56 | Stationary | CONTRACTOR | AJC | Routine | | Kemari Terminal | team | Closed | | 2026-01-11 |
| 2026-01-12 | Unsafe Act | Work at Height | At tank # 62, the expiry date on inspection tag of scaffolding was not available. | Tank Farm | Tank # 62 | Civil | PRL | | Routine | | Kemari Terminal | team | Closed | | 2026-01-11 |
| 2026-01-16 | Unsafe Act | Work at Height | At tank # 62, reflective tape was missing on scaffolding installed along the roadside, posing a risk of vehicle colliding with the scaffolding (AKS). | KT | Tank #62 | Civil | CONTRACTOR | AKS | Routine | | Kemari Terminal | team | Closed | | 2026-01-18 |
| 2026-01-06 | Unsafe Condition | Vehicle | During excavation work at Tank #35, the excavator being used by M/s IIW was found without a PRL-approved spark arrester and was reported to the HSE In-Charge. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Housekeeping | At tank#35,during excavation work, found some materials not barricaded at work site. Informed to HSE supervisor IIW using materials barricaded immediately. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Housekeeping | At tank#35,during excavation work, found full diesel dram were present at tank yard. Informed to HSE in charge immediately remove diesel dram. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Procedure | At tank#04 ,during removing IFR materials not barricaded informed site supervisor and immediately barricading area. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Lack of Supervision | At tank#04,during confined space activities, not present HSE person ,informed site supervisors. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Lack of Supervision | At tank#11 ATL, W/S, during crane operation involved riggers 3rd party certification missing. Informed HSE in charge. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Housekeeping | At tank#11,during safety round I observe pipe line materials not barricaded, informed to HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Procedure | Handrail installed at walkway need to be fixed located at road no. 2 opposite foam skid generator. | KT | KT | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Procedure | Permanent Chain pole needs to be installed as barrication over underground pipelines at road # 1 near VFD Crude Pump. | KT | KT | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Procedure | Walkway is required for easily access the foam header at road # 1. | KT | KT | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Procedure | Tank 57 west side (walkway) handrails need to be fixed and walkway at road # 1 need to be repaired. | KT | Tank #57 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Procedure | The access staircase to the fire hydrant no. 16 need to be realigned from road side at road # 1. | KT | Fire Hydrant no. 16 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Procedure | Walkway platform is required for Tank # 58 foam manifold at road # 1. | KT | Tank # 58 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-06 | Unsafe Condition | Procedure | Rotary miller machine found at road # 1 need to be removed. | KT | Road #1 | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-17 |
| 2026-01-05 | Unsafe Condition | PPE | At tank 04 yard, during scaffolding materials sifting not wearing a safety gloves, , informed to site supervisor and consoling done. | Tank Farm | Tank #04 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-06 |
| 2026-01-05 | Unsafe Condition | Procedure | At tank#35,during excavation work use one dumper not fitted revers alarm, informed to HSE person and immediately fitted revers alarm. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-06 |
| 2026-01-05 | Unsafe Condition | Lack of Supervision | At tank#35, during excavation work use one dumper move on rood.16 without flagman. Informed to HSE supervisor and consoling done. | Tank Farm | Tank #35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | team | Closed | | 2026-01-06 |
| 2025-12-24 | Unsafe Act | Procedure | At tank # 04, Al Hadeed, workers engaged in sludge removal inside the tank were found wearing coveralls that were neither reflective tape nor PRL-approved | Tank Farm | Tank # 04 | Civil | CONTRACTOR | Al Hadeed | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-24 | Unsafe Act | PPE | At tank# 35, during excavation workers were found without dust mask. Informed to HSE supervisor to use proper PPEs. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-24 | Unsafe Act | PPE | At tank # 35, IIW Ambulance equipped with spark arrester (metallic grating), it should be replaced with proper spark arrestor. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-23 | Unsafe Act | Electrical | At tank# 11, electrical inspection tag was found expired of ventilation fan, informed to HSE supervisor, and immediately removed from the site for reinspection and retagging. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-23 | Unsafe Act | Procedure | At tank # 5 & 35, shifting scaffolding material through crossing the dike wall instead of using the proper passage. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-23 | Unsafe Act | Procedure | At tank # 35, IIW two workers were observed working in close proximity to the excavator. | Tank Farm | Tank # 35 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-23 | Unsafe Act | Work at Height | At tank # 20, the toe board was found missing on the lifting platform being used by the UE for painting work, creating a potential risk of paint cans and materials falling from height. Furthermore, the lifting rope was found damage. | Tank Farm | Tank # 20 | Civil | CONTRACTOR | UE | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-23 | Unsafe Act | Work at Height | At tank # 04, an air hose pipe and electrical cable were found lying on the walkway, creating a trip hazard. The issue was immediately reported to the HSE personnel from SWIFT Civil, and the walkway was promptly cleared. | Tank Farm | Tank #04 | Civil | CONTRACTOR | SWIFT | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-19 | Unsafe Act | Procedure | ATL workers were observed crossing the Tank-05 dyke wall, which is unsafe. The ATL HSE Supervisor was informed. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-19 | Unsafe Act | Housekeeping | During a round of the Tank-05 yard, poor housekeeping was observed. The HSE Supervisor of ATL was informed. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-19 | Unsafe Act | Work at Height | Outside the Tank 36 yard, along the road, scaffolding pipes were found laid in a disorganized manner. The HSE Officer of IIW was informed. | Tank Farm | Tank #36 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-19 | Unsafe Act | Procedure | A rest shed is not available at Tank 36. The matter was informed to the IIW HSE Officer. | Tank Farm | Tank #36 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-17 | Unsafe Condition | Procedure | At Tank #11, during mechanical work inside the tank, the ventilation system was not in use. The site supervisor was informed and the ventilation fan was started immediately. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-17 | Unsafe Condition | Housekeeping | At ATL W/S, during crane operations, the safety person was not available at the site. The rigging supervisor and construction representative were informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-16 | Unsafe Act | Procedure | At Tank #11, during fabrication work, the I-beam and U-clamps in use were not secured with chains. The HSE supervisor and site supervisor were informed and chains were installed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-19 |
| 2025-12-16 | Unsafe Act | Procedure | At Tank #11, the gap between the shell and the scaffolding platform was not covered. The construction representative and HSE supervisor were informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-19 |
| 2025-12-16 | Unsafe Act | Procedure | At Tank #11, the ATL fire extinguisher was found lying at the site in very poor condition. The HSE supervisor was informed, and the fire extinguisher was replaced. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-19 |
| 2025-12-16 | Unsafe Act | Procedure | At Tank #11, the safety sign on the waste disposal dustbin was found torn and needs to be replaced. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-19 |
| 2025-12-16 | Unsafe Act | Procedure | At Tank #05, during civil work on the boundary wall, the walkway was found unsafe and obstructed. The HSE supervisor was informed, and the access was cleared and made safe immediately. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-19 |
| 2025-12-16 | Unsafe Act | Procedure | At Tank #05, during civil work on the boundary wall, a proper platform was not provided, and workers were working under unsafe conditions. The HSE lead was informed, and a safe scaffolding platform was provided immediately. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-19 |
| 2025-12-16 | Unsafe Act | Work at Height | At Tank #11, during tools inspection, two tool ties were found damaged. The HSE supervisor was informed, and the tool ties were replaced immediately to ensure safe work. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-19 |
| 2025-12-15 | Unsafe Condition | Electrical | At Tank #11, during fabrication work, one electrical extension board was found with an expired inspection tag. The HSE supervisor was informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Condition | Electrical | At Tank #05, during civil work, the access was not clear. The HSE supervisor was informed. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Condition | Electrical | At Tank #11, during safety harness inspection, one lanyard hook was found not working. The HSE supervisor was informed, and the safety harness was replaced. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Condition | Falling Object | At the Gantry Substation, railings have been installed at the roof edge for fall protection; however, there are significant gaps in the railings and edge, posing a risk of falling. | Tank Farm | Gantry Substation | Civil | CONTRACTOR | QK | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Condition | Work at Height | At the Gantry Substation, no lifeline has been installed on the roof to which a safety harness can be hooked. | Tank Farm | Gantry Substation | Civil | CONTRACTOR | QK | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Condition | Work at Height | At the Gantry Substation, on the scaffolding platform, workers from QK Builders are moving around but are not hooking their safety harnesses. | Tank Farm | Gantry Substation | Civil | CONTRACTOR | QK | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Condition | Work at Height | At Road 1 near the M/s ATL fabrication yard, a person from M/s Pak Impex was found wearing a coverall without reflective tape and was not wearing safety goggles. Counseling done | Tank Farm | Gantry Substation | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Condition | Work at Height | At Road 2, M/s RE generator was found parked without wheel chocks. | Tank Farm | Road # 2 | Stationary | CONTRACTOR | RE | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Act | Procedure | At road #16, M/s IIW staff were found sitting on road due to unavailability of rest shed. Counseling done. | Tank Farm | Road # 16 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-15 | Unsafe Act | PPE | At Road #16, a person from M/s IIW was found wearing safety shoes that were not PRL-approved. Counseling done. | Tank Farm | Road # 16 | Construction | CONTRACTOR | IIW | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Environment | At Tank #05, diesel cans were found kept near the generator. The HSE Supervisor was informed, and the diesel cans were immediately removed. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Housekeeping | At Tank #05, during civil work on the boundary wall, workers were passing materials over it and the access was not clear. Mr. Irfan was informed and the access was cleared immediately. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Housekeeping | At Tank #11, during fabrication work, the gap between the shell and the platform was not covered to prevent falling objects. The HSE Supervisor was informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-14 | Unsafe Condition | Environment | At Tank #11, during fabrication work, I-clamps and U-clamps were found tied with binding wire instead of using chains. The HSE Supervisor was informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Procedure | At Tank #11, no operator was present while the generator was in use at the ATL office (25 kV). The HSE Supervisor was informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Vehicle | At Tank #11, a loaded boom truck developed a mechanical fault; the clutch and gear system were not functioning properly. The HSE Lead and Project CM were informed. The boom truck was immediately stopped and isolated, and the operator was instructed to park the vehicle in a safe area. The issue was reported to the mechanical/maintenance team for inspection and repair. The boom truck will remain out of service until the fault is rectified and verified as safe for operation. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Vehicle | At Tank #11, a loaded boom truck developed a mechanical fault; the clutch and gear system were not functioning properly. The HSE Lead and Project CM were informed. The boom truck was immediately stopped and isolated, and the operator was instructed to park the vehicle in a safe area. The issue was reported to the mechanical/maintenance team for inspection and repair. The boom truck will remain out of service until the fault is rectified and verified as safe for operation. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Vehicle | At Tank #11, an ATL worker was lifting and dragging a steel bar weighing more than 50 kg, which is against manual handling rules and safe lifting limits. The HSE Supervisor was informed, and counselling was conducted. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Vehicle | At Tank #11, two grinder operators were using grinders without maintaining a safe distance, causing sparks to hit each other during operation. The HSE Supervisor was informed, and counselling was conducted. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-12 | Unsafe Condition | Vehicle | At Tanks #11 and #05, some ATL workers were not using safety gloves regularly. The HSE Supervisor and Site Supervisor were repeatedly informed. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-09 | Unsafe Act | Equipment | At Tank #11, a grinder stand was available. However, the grinder was placed on the floor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-09 | Unsafe Act | Work at Height | At Tank #11, parallel activities (fabrication work) were observed in 5th and 5th shell. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-09 | Unsafe Act | Work at Height | At Tank #11, M/s ATL worker was found walking on scaffolding platform without hooking his harness hook. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-09 | Unsafe Act | Housekeeping | At outside area of tank #5. Leftover material needs to be removed. | Tank Farm | Tank #5 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-09 | Unsafe Act | Environment | Oil leakage was observed from M/s ATL’s generator, which is used for the office area. | Tank Farm | ATL Yard | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-09 | Unsafe Act | Work at Height | At Tank #11, a tool used for reinforcement was found with a gripping handle. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-11 | Unsafe Act | PPE | At Tank #11, workers inside the tank were using black goggles during mechanical work. The HSE Supervisor was informed, and the workers were instructed to replace the black goggles with clear safety goggles suitable for inside-tank work. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-11 | Unsafe Act | PPE | At Tank #11, the grinder man inside the tank was not using earplugs during grinding work. The HSE Supervisor was informed, and counselling was provided. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-11 | Unsafe Act | Housekeeping | At Tank #11, poor housekeeping was observed in the tank yard, including scattered tools, materials, and debris. The HSE Supervisor was informed, and the workplace was immediately cleaned. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-11 | Unsafe Act | PPE | At Tank #11, some ATL workers were not using safety gloves regularly. The HSE Supervisor was informed, and the Site Supervisor was instructed to immediately provide the required PPE. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-11 | Unsafe Act | PPE | At Tank #05, during civil work for backfilling the bund wall, ATL workers were not using dust masks. The HSE Supervisor was informed, and counselling was provided. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-09 | Unsafe Condition | Procedure | Near the gantry sub-station, construction materials (cement mixer, trolley, etc.) were found placed on the road without proper barrication. | Tank Farm | Gantry Substation | Civil | CONTRACTOR | QK | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-09 | Unsafe Condition | Procedure | At gantry sub-station, M/s QK Builders workers were found working below area of expired green tag scaffolding structure. | Tank Farm | Gantry Substation | Civil | CONTRACTOR | QK | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-05 | Unsafe Condition | Housekeeping | At backside of lab, cylinder trolley was placed on walkway, needs to be removed. | KOR Refinery | LAB | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-09-07 | Unsafe Act | Procedure | At tank# 05, spark were falling directly on the gas cylinder while using the grinder. Informed to HSE supervisor and immediately remove gas cylinder remove this place. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-08 |
| 2025-09-07 | Unsafe Act | Procedure | At tank # 05, D-door was hold by the workers instead of hold by the chain block while its installing and welding. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-08 |
| 2025-09-04 | Unsafe Act | Work at Height | At 103E, 104E, and 102E, during scaffolding dismantling, one AKS scaffolder was found not using tool tie. | Plant Area | 103E, 104E, and 102E | Civil | CONTRACTOR | AKS | Routine | | Korangi Refinery | | Closed | | 2025-09-05 |
| 2025-09-04 | Unsafe Act | Work at Height | At tank 05, a wroker found without wearing rigging gloves while rigging activity of pipes. Informed to HSE supervisor and counseling . | Plant Area | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-05 |
| 2025-09-11 | Unsafe Act | PPE | Permit was issued but not available at the site, and scaffolding work was in progress. Informed to HSE lead. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-12 |
| 2025-09-11 | Unsafe Act | Procedure | At tank # 05, nearby main D .Door scattered material was present. Informed to HSE supervisor and immediately remove these materials. | Tank Farm | At Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-12 |
| 2025-09-13 | Unsafe Act | Electrical | At tank#11, during the tool inspection, it was observed that the electrical inspection tags of 2 LED lights were found expired. Informed to HSE supervisor and immediately electrical inspection tag install. | Tank Farm | Tank #11 | Electrical | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-14 |
| 2025-09-13 | Unsafe Act | PPE | At tank # 11, while working on chain block, the impact gloves of rigger was found damaged, informed to HSE supervisor and immediately replace gloves. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-14 |
| 2025-09-13 | Unsafe Act | PPE | At tank # 05, during handing of MS plate, the scaffolders were found without wearing impact gloves, informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-14 |
| 2025-09-13 | Unsafe Act | Procedure | At tank # 05, during the painting work, the electrical inspection tag of mixture machine was found expired. Informed to HSE supervisor and Electrician immediately inspection and tag install. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-14 |
| 2025-09-13 | Unsafe Act | PPE | At tank #05, one worker was using a drill machine without wearing safety gloves. Informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-14 |
| 2025-09-13 | Unsafe Act | PPE | At tank #11, one fitter was lifting and shifting a Garder without wearing rigging gloves. Informed to HSE supervisor during lifting /shifting activities to avoid hand injuries. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-14 |
| 2025-09-14 | Unsafe Act | Electrical | At tank # 05, Main Electrical DB was tripping repeatedly and the electrician was not present. Informed to HSE supervisor maintenance team to arrange an alternate electrician and ensure proper inspection of the Main Electrical DB. | Tank Farm | At Tank # 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-15 |
| 2025-09-14 | Unsafe Act | Procedure | At tank # 05, some workers entered the tank whose names were not included in the SBM medical list .(Nizam sb, Usman sb, Mr. Nasir, Mr. Irfan, Mr. Kaim visitor and Mr. Shahid Lodhi ATL) informed to HSE supervisor ensure only medically cleared workers are allowed the tank to verify medical fitness before assigning confined space. | Tank Farm | At Tank # 05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-15 |
| 2025-09-18 | Unsafe Act | Electrical | The handle of the CO2 fire Extinguisher was damaged placed near the electrical generator. Informed to HSE supervisor and immediately replace CO2 fire Extinguisher. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-19 |
| 2025-09-19 | Unsafe Condition | PPE | At tank # 05,(Mr. shahid Lodhi) during the visit found without wearing safety gloves while handling the electrical bord and LED light. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-09-16 |
| 2025-09-19 | Unsafe Condition | PPE | At tank # 05, a worker during the grinding activity found without earplug, informed to HSE supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-09-16 |
| 2025-09-19 | Unsafe Condition | PPE | At tank # 11,during the material shifting 02 nos ATL workers were lifting an H-beam without wearing safety impact gloves. Informed to HSE supervisor and safety gloves wearing. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2025-09-16 |
| 2025-09-21 | Unsafe Act | Procedure | At ATL workshop the operator was not present with generator. Informed to HSE supervisor. | KOR Refinery | ATL Workshop | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-09-21 | Unsafe Act | Procedure | At tank # 05, gas cylinder was placed very close to the work area. Informed to HSE supervisor and gas cylinder shifted to a safe distance form hot work area. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-09-21 | Unsafe Act | Procedure | At tank # 05, while changing the disc of grinder the plug was connected (energized). Informed to HSE supervisor. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-09-21 | Unsafe Act | Procedure | At tank # 05, some person entered the tank whose names were not included in the SBM medical list,(Mr. Khalid Anwar, Mr. Majeed sb. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-09-21 | Unsafe Act | Procedure | At tank # 05, after replacement of the breaker and switch in the generator , the electrical tag was not re-tagged. Informed to HSE supervisor. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-10-03 | Unsafe Act | PPE | At tank #11, during fabrication work, one fabricator was not wearing a safety glove. Informed to HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-10-03 | Unsafe Act | Line of Fire | At tank # 11, sparks from the grinder were hitting to another worker. Informed to HSE lead. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-10-03 | Unsafe Act | Work at Height | At tank # 11, during the scaffolding modification one scaffolder safety harness’s lanyard was not hooked. Informed to HSE supervisor and counseling done | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-10-03 | Unsafe Act | Line of Fire | At tank # 05, during the crane operation, 01 worker was crossing the barricaded area. Informed to HSE supervisor and counseling done. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-10-07 | Unsafe Act | Procedure | At tank#05,during the crane operation ,An MS plate buried under the ground was being pulled out using a mobile crane by applying excessive force. Informed to HSE supervisor and Rigging Supervisor. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2025-10-10 | Unsafe Condition | Electrical | At tank # 11, the cap of the three- phase receptacle (Female) connected to the main electrical panel was found broken. | Tank Farm | Tank # 11 | Electrical | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-11-29 | Unsafe Act | Procedure | At road 18, while M/s UE team were performing hot work activity fire extinguisher was not available at site. Informed to site supervisor | KOR Refinery | Road # 18 | Stationary | CONTRACTOR | UE | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-11-29 | Unsafe Act | Procedure | At road 18, grinder operator and generator operator were found without wearing ear plugs. Counseling done. | KOR Refinery | Road # 18 | Stationary | CONTRACTOR | UE | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-11-29 | Unsafe Act | Procedure | At road 18, unavailability of grinder stand was observed. Informed to site supervisor | KOR Refinery | Road # 18 | Stationary | CONTRACTOR | UE | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-04 | Unsafe Condition | Procedure | At Tank #11, parallel activities (grinding work) were observed in 5th and 5th shell. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-04 | Unsafe Condition | Procedure | At Tank #11, parallel activities (grinding work) were observed in 5th and 5th shell. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-04 | Unsafe Condition | Procedure | At Tank #11, parallel activities (grinding work) were observed in 5th and 5th shell. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-04 | Unsafe Act | Procedure | At Tank #11, parallel activities (grinding work) were observed in 5th and 5th shell. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-04 | Unsafe Act | Procedure | At Tank #11, parallel activities (grinding work) were observed in 5th and 5th shell. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-23 | Unsafe Act | Electrical | At tank # 11, grinder was found placed on surface instead of stand while it is not in use. Informed to HSE supervisor. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-12-17 | Unsafe Condition | Procedure | At Tank #11, during mechanical work inside and outside the tank, loose materials were found. The site supervisor was informed for removal of the loose materials. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-19 |
| 2025-11-30 | Unsafe Act | Procedure | Wild bushes need to be remove in tank # 54, 55, 58, & 57 yard. | KT | KT | Civil | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-20 |
| 2025-11-30 | Unsafe Act | Procedure | hydrant # B-10, tank # 55 yard, minor seepage in foam line T-joint. | KT | KT | Stationary | PRL | | Routine | | Kemari Terminal | | Closed | | 2026-07-20 |
| 2025-11-26 | Unsafe Act | PPE | At Tank #11, while working at height M/s ATL supervisor was found without wearing helmet chin guard. Counseling done. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-07-09 |
| 2025-11-27 | Unsafe Act | Procedure | At Tank #11, M/s ATL worker was found wearing torn safety gloves. Counseling done. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-24 | Unsafe Condition | Procedure | At Tank #05, while welding miller was in operation, but operator was not available at nearby area. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-24 | Unsafe Condition | Procedure | At Tank #05, no rest shed was available. | KOR Refinery | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-09-19 | Unsafe Condition | Procedure | Low water pressure found on EEWS number 25 at gantry. | Tank Farm | Tank #05 | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-20 |
| 2025-09-19 | Unsafe Condition | Housekeeping | Concrete waste material placed on different location of road-4. | Tank Farm | Road # 4 | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-20 |
| 2025-09-19 | Unsafe Condition | Procedure | At road-01 hydrant Number 27 concrete support required. | Tank Farm | Road # 01 | Civil | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-20 |
| 2025-09-19 | Unsafe Condition | Procedure | Weather protection shed required on fire alarm Number 56 block-2, FA-9 stationary workshop, FA-54 instrument workshop and FA-52 AC workshop. | Tank Farm | Road # 01 | Electrical | PRL | | Routine | | Korangi Refinery | | Closed | | 2026-07-20 |
| 2025-09-15 | Unsafe Condition | Procedure | At tank#05, no mechanical work supervision from ATL was present. Informed to HSE lead. | Tank Farm | Tank#05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-16 |
| 2025-09-15 | Unsafe Condition | PPE | At tank#05, 1 fitter was observed without safety gloves while using the grinder, informed to HSE supervisor and inshore use PPEs . | Tank Farm | Tank#05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-16 |
| 2025-09-15 | Unsafe Condition | PPE | At tank#11, 2 ATL workers were found wearing black googles during working inside the tank. Informed to HSE supervisor and change safety goggles. | Tank Farm | Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2025-09-16 |
| 2025-10-17 | Unsafe Condition | PPE | At tank #11,the portable air compressor was connected with an electrical plug while activity was stopped. Informed to HSE supervisor and immediately disconnect plug. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-17 | Unsafe Condition | PPE | At tank #11,during sand blasting activities, workers were not wearing face masks.(N.95)informed to HSE supervisor and wearing a face mask. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-10-21 | Unsafe Act | Equipment | At tank#15, during the hot work activities found the fire Extinguisher were not available near the generator, informed to HSE person. | Tank Farm | Tank #15 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-04-05 |
| 2025-11-05 | Unsafe Act | PPE | At tank#11,One worker was not wearing gloves during hammering activity, which increases the risk of hand injury. Informed to HSE supervisor. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-05 | Unsafe Act | Electrical | At tank#11,The electrical tag on the indicator was expired, indicating that the equipment’s inspection was overdue. Informed to HSE supervisor. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-05 | Unsafe Act | PPE | At tank#11,Observation: During housekeeping activity, the worker was not wearing an N95 mask, which can lead to dust inhalation and respiratory issues. Informed to HSE supervisor. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-05 | Unsafe Act | Procedure | At tank #05, during the dismantling of scaffolding materials not barricaded in tank site. Informed to HSE supervisor and immediately all materials barricaded. | Tank Farm | At Tank#11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-06-24 |
| 2025-11-13 | Unsafe Act | PPE | At tank # 05, SGS inspector found wearing low ankle shoes inside tank yard. Informed to HSE Lead. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | | Closed | | 2026-07-13 |
| 2025-11-14 | Unsafe Act | Procedure | At tank # 05, A safety person and construction representative were not present during the crane operation. Informed to HSE Lead. | KOR Refinery | TANK# 05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-14 | Unsafe Act | Housekeeping | At tank # 11, during the safety round poor housekeeping was observed at the back side of the tank. Informed to HSE supervisor. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-14 | Unsafe Act | Housekeeping | At tank #11, the fan installed in the ventilation system was not operating. Informed to HSE supervisor. | KOR Refinery | TANK# 11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-16 | Unsafe Condition | Electrical | At tank # 11,during the hot work, welding cables was found damaged. Informed to HSE supervisor and replace the welding cables. | Tank Farm | Tank #11 | Construction | CONTRACTOR | ATL | Routine | | Korangi Refinery | team | Closed | | 2026-06-24 |
| 2025-11-19 | Unsafe Condition | Equipment | At Tank #11, operating handle of fire extinguisher was found damaged. HSE supervisor was informed. | KOR Refinery | Tank #11 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |
| 2025-11-21 | Unsafe Act | Procedure | At Tank #05, the confined space access area was not clear. The HSE supervisor was informed. | Tank Farm | Tank #05 | Construction | CONTRACTOR | ATL | Routine | N/A | Korangi Refinery | team | Closed | | 2026-09-09 |