Observation Details
Date16 Jun 2026
CategoryProcedure
FacilityKorangi Refinery
AreaTank Farm
Exact LocationMCP boiler Utility area
DepartmentCivil
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NamePRL
StatusClosed
Assigned Toteam
Target Date—
Closed Date09 Sep 2026
Observation Summary
MCP boiler Utility area paint required. And fire hydrant Isom boiler area and power house all hydrant paint required.
Action Taken / Required
N/A
