| 28 Jul 2026 |
Zafar Iqbal |
Operation |
Korangi Refinery Process Area |
301-JA lube oil pump turbine exhaust silencer drain line is currently … |
Civil |
Open |
— |
|
| 24 Jul 2026 |
M.Hussain Ejaz |
Operation |
Korangi Refinery Process Area |
At the platform walkway between 106-JC-2 and 106-JC-4, the side railin … |
Stationary |
Open |
— |
|
| 23 Jul 2026 |
Bilal Khursheed |
Operation |
Korangi Refinery Process Area |
The side railing on the soot blower platform of Furnace 103-B is parti … |
Stationary |
Open |
— |
|
| 23 Jul 2026 |
Salman |
Operation |
Korangi Refinery Utilities |
The cable tray located near the old softening CAT unit is inadequately … |
Instrument |
Open |
— |
|
| 23 Jul 2026 |
Iqtedar Ahmed |
Operation |
Korangi Refinery Process Area |
At 701-E: Loose electrical cables are present alongside the monkey lad … |
Electrical |
Closed |
— |
|
| 23 Jul 2026 |
M.Hussain Ejaz |
Operation |
Korangi Refinery Process Area |
At New Cooling Tower (2302-U) rear side, one of the louver sheets on t … |
Civil |
Closed |
— |
|
| 20 Jul 2026 |
M.Balaj |
HSEQ |
Korangi Refinery Tank Farm |
It was observed that a water bowser driver was sitting on the wall of … |
Civil |
Closed |
— |
|
| 18 Jul 2026 |
Bilal Khursheed |
Operation |
Korangi Refinery Process Area |
The temporary lighting arrangement at the C/W pump shed has exposed wi … |
Electrical |
Closed |
— |
|
| 16 Jul 2026 |
M.Usman |
Operation |
Korangi Refinery Caustic Yard |
The stair handrail arrangement at the Philimplus vessels at caustic ya … |
Stationary |
Open |
— |
|
| 24 Jun 2026 |
System Administrator |
OM KT |
Kemari Terminal API Separator |
To prevent vehicle-impact incidents at the slop bowser loading area of … |
Stationary |
Closed |
— |
|
| 12 Jun 2026 |
System Administrator |
Tank Farm |
Korangi Refinery Tank Farm |
The static charge dissipator SS rod is heavily rusted. Due to corrosio … |
Stationary |
Closed |
— |
|
| 12 Jun 2026 |
System Administrator |
Tank Farm |
Korangi Refinery Tank Farm |
At MMT Vessel Yard the protective cover of the light bulb has accumula … |
Electrical |
Closed |
— |
|
| 10 Jun 2026 |
System Administrator |
OM KT |
Kemari Terminal Keamari Termial |
At Kt, point #8 Platform of HSFO Valve Sealing due to inadequate fall … |
Stationary |
Closed |
— |
|
| 08 Jun 2026 |
System Administrator |
Operation |
Korangi Refinery Plant Area |
Monkey ladder for 202-Cs platform Infront of control room has an inter … |
Stationary |
Open |
— |
|
| 04 Jun 2026 |
System Administrator |
HSEQ |
Korangi Refinery Tank Farm |
At Gantry Bay #8, PRL logistic staff was found on the bowser top witho … |
Logistic |
Closed |
— |
|
| 04 Jun 2026 |
System Administrator |
HSEQ |
Korangi Refinery Tank Farm |
At Vessel 1403-F, an unattended open confined space was observed witho … |
Tank Farm |
Closed |
— |
|
| 23 May 2026 |
System Administrator |
Operation |
Korangi Refinery Plant Area |
The monkey ladder for the 102-F platform has an intermediate support p … |
Stationary |
Open |
— |
|
| 23 May 2026 |
System Administrator |
Operation |
Korangi Refinery Plant Area |
Electrical cables for old boilers heat tracing and lighting are openly … |
Electrical |
Closed |
— |
|
| 19 May 2026 |
System Administrator |
HSEQ |
Korangi Refinery Plant Area |
At boiler # 03, two open pits were observed without proper covering; i … |
Stationary |
Closed |
— |
|
| 13 May 2026 |
System Administrator |
HSEQ |
Korangi Refinery Tank Farm |
At Gantry Bay #2, the insulation on one of the overhead pipelines has … |
Civil |
Closed |
— |
|
| 09 May 2026 |
System Administrator |
Operation |
Korangi Refinery Plant Area |
At the intersection of road # 03 & 06, Infront of main sub-station, fi … |
Stationary |
Closed |
— |
|
| 08 May 2026 |
System Administrator |
Stationary |
Korangi Refinery Tank Farm |
At tank yard # 33, handrail supports were found to be bent and damaged … |
Stationary |
Closed |
— |
|
| 16 Apr 2026 |
System Administrator |
HSEQ |
Korangi Refinery Tank Farm |
It was noted that an OGDL staff member entered the local decanting gan … |
Logistic |
Closed |
— |
|
| 12 Apr 2026 |
System Administrator |
Operation |
Korangi Refinery Plant Area |
During cooling water chemical- sodium hypochlorite makeup activity, it … |
Warehouse |
Closed |
— |
|
| 23 Mar 2026 |
System Administrator |
Operation |
Korangi Refinery Plant Area |
Boulders at Road #10 lack reflectors, posing a risk of vehicle collisi … |
HSEQ |
Closed |
— |
|