Potential Incident

49
Total
4
Open
45
Closed
Number of Potential Incident vs Reporting Department
Number of Potential Incident vs Responsible Department
Potential Incident49 records
Date Reported By Reporting Dept Facility Description Resp. Dept Status Assigned Actions
06 Jan 2026 System Administrator Tank Farm Korangi Refinery
Tank Farm
HSD rundown sampling point located near the Tank-7 manifold. Currently … Civil Closed
30 Dec 2025 System Administrator HSEQ Korangi Refinery
Tank Farm
Near tank yard # 4, during the fuel transfer operation into the compre … Rotary Closed
22 Dec 2025 System Administrator Civil Korangi Refinery
Plant Area
At west side of the 201-DN reactor, there is a beam–column structure s … Stationary Closed
19 Dec 2025 System Administrator Stationary Korangi Refinery
Tank Farm
At Decanting Bay 01, where the swing ladder and its railings were foun … Stationary Closed
16 Dec 2025 System Administrator HSEQ Korangi Refinery
Tank Farm
Beyond Gate # 3, while the HSE Manager of M/s Al-Hadeed was approachin … Civil Closed
13 Dec 2025 System Administrator Tank Farm Korangi Refinery
Tank Farm
Two steps on the stairs of the MS gantry at bay-07 and bay-08 have sus … Stationary Closed
11 Dec 2025 System Administrator Tank Farm Korangi Refinery
Tank Farm
At tank # 36, the feed valve platform has sustained significant damage … Stationary Closed
02 Dec 2025 System Administrator Tank Farm Korangi Refinery
Tank Farm
Scaffolding used to operate the feed valve at Tank-33 is not in proper … Civil Closed
01 Dec 2025 System Administrator Tank Farm Korangi Refinery
Tank Farm
Tank farm wooden floor is damaged & deteriorating. Civil Closed
26 Nov 2025 System Administrator Operation Korangi Refinery
Plant Area
At 104-B, monkey ladder to 5th platform has missing safety cage, posin … Stationary Closed
26 Nov 2025 System Administrator Operation Korangi Refinery
Plant Area
At 104-B, monkey ladder to 4th platform has high vibration, posing a f … Stationary Closed
26 Nov 2025 System Administrator Operation Korangi Refinery
Plant area
At 123-C/124-C channel head platforms, monkey ladder entrance point sa … Stationary Closed
21 Nov 2025 System Administrator Civil Kemari Terminal
KT
During the inspection of the bund wall a potential incident was identi … Stationary Closed
20 Nov 2025 System Administrator Tank Farm Korangi Refinery
Tank Farm
This has been observed that, tank#16 stainless steel earthing handling … Stationary Closed
10 Nov 2025 System Administrator Tank Farm Korangi Refinery
Tank Farm
Tank # 18, 27, 16, 17, 05 drain lines are crossing through walkways cr … Civil Closed
21 Oct 2025 System Administrator Lab Korangi Refinery
Laboratory
At the laboratory, deformation was observed in the false ceiling panel … Civil Closed
28 Sep 2025 System Administrator Tank Farm Korangi Refinery
Tank Farm
Tank-38 overflow window mesh near foam box ( Road-14 side ) is in hang … Stationary Closed
16 Sep 2025 System Administrator Operation Korangi Refinery
Plant Area
The check nut on the first isolation valve of the 2801-JAN back-to-tan … Stationary Closed
05 Sep 2025 System Administrator Operation Korangi Refinery
Plant area
At west side of 116-C and east side of 115-JC2, loose metallic sheets … Instrument Closed
05 Sep 2025 System Administrator Operation Korangi Refinery
Plant area
At 202-Cs fan blocks platform, west side of 202-JC2, a loose instrumen … Civil Closed
21 Aug 2025 System Administrator OM KT Kemari Terminal
KT
Concreate flooring has been settled down due to recent rain spell near … Civil Closed team
03 Aug 2025 System Administrator OM KT Kemari Terminal
KT
In front of white oil manifold, concrete planks lying on surface to co … Civil Closed team
29 Jul 2025 System Administrator Operation Korangi Refinery
Operation
Along road # 07 towards Boiler # 04, gardening water line is posing tr … Stationary Closed team
07 Jul 2025 System Administrator Tank Farm Korangi Refinery
Tank # 32
At tank #32, a splash plate is found hanging and poses a potential fal … Stationary Closed team