arrow_back Back
Reporting Date22 Dec 2025
Reported BySystem Administrator
Reporting PersonMuhammad Muneeb
Reporting DeptCivil
Resp. DeptStationary
LocationKorangi Refinery
AreaPlant Area
Exact Location201-DN
StatusClosed
Target Date
Closed Date
Assigned To
Description

At west side of the 201-DN reactor, there is a beam–column structure supporting an old (possibly redundant) crane. One end of the beam is bolted to a column; however, the column at the other end appears to be missing, leaving the beam in a cantilevered condition.