Potential Incident

57
Total
7
Open
50
Closed
Number of Potential Incident vs Reporting Department
Number of Potential Incident vs Responsible Department
Potential Incident57 records
Date Reported By Reporting Dept Facility Description Resp. Dept Status Assigned Actions
16 Sep 2025 System Administrator Operation Korangi Refinery
Plant Area
The check nut on the first isolation valve of the 2801-JAN back-to-tan … Stationary Closed
05 Sep 2025 System Administrator Operation Korangi Refinery
Plant area
At west side of 116-C and east side of 115-JC2, loose metallic sheets … Instrument Closed
05 Sep 2025 System Administrator Operation Korangi Refinery
Plant area
At 202-Cs fan blocks platform, west side of 202-JC2, a loose instrumen … Civil Closed
21 Aug 2025 System Administrator OM KT Kemari Terminal
KT
Concreate flooring has been settled down due to recent rain spell near … Civil Closed team
03 Aug 2025 System Administrator OM KT Kemari Terminal
KT
In front of white oil manifold, concrete planks lying on surface to co … Civil Closed team
29 Jul 2025 System Administrator Operation Korangi Refinery
Operation
Along road # 07 towards Boiler # 04, gardening water line is posing tr … Stationary Closed team
07 Jul 2025 System Administrator Tank Farm Korangi Refinery
Tank # 32
At tank #32, a splash plate is found hanging and poses a potential fal … Stationary Closed team