Date17 Jun 2026
CategoryWork at Height
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #30
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameDEL
StatusClosed
Assigned Toteam
Target Date
Closed Date09 Sep 2026
Observation Summary

At Tank #30, M/s DEL: The roof railing was found detached from the tank structure. A lifeline was observed anchored to a scaffolding pipe fixed to the unstable railing.

Action Taken / Required

N/A