Date05 Apr 2026
CategoryEquipment
FacilityKorangi Refinery
AreaKOR Refinery
Exact LocationDe
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameDEL
StatusClosed
Assigned Toteam
Target Date
Closed Date09 Jul 2026
Observation Summary

At  DEL yard M/s DEL, during a safety visit, it was observed that the gas cutter was neither properly closed nor in working condition. However, the gas supply was left open through the regulators, and the equipment was not covered with a fire blanket.

Action Taken / Required

N/A