arrow_back Back
Date05 Apr 2026
CategoryWork at Height
FacilityKemari Terminal
AreaTank Farm
Exact LocationTank #56
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameAJC
StatusClosed
Assigned Toteam
Target Date
Closed Date09 Sep 2026
Observation Summary

Tank#56,M/s AJC, A grinder was being lifted using a rope tied to it outside the tank area, which is unsafe.

Action Taken / Required

N/A