arrow_back Back
Date12 May 2026
CategoryProcedure
FacilityKemari Terminal
AreaTank Farm
Exact LocationTank #56
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameAJC
StatusClosed
Assigned To
Target Date
Closed Date24 Jun 2026
Observation Summary

At Tank #56, during the lifting operation, the rigger was handling the suspended load by hand and the signalman was not wearing a safety jacket.