arrow_back Back
Date25 Aug 2025
CategoryLack of Supervision
FacilityKorangi Refinery
AreaPlant Area
Exact LocationAt 704-C ISOM Area
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameDEL
StatusClosed
Assigned Toteam
Target Date
Closed Date26 Aug 2025
Observation Summary

At 704-C ISOM area, during hydro jetting work, one side of the hydro jetting canopy was not properly covered. The issue was reported to the Descon supervisor, and the area was immediately covered.