arrow_back Back
Date06 May 2026
CategoryProcedure
FacilityKemari Terminal
AreaTank farm
Exact LocationTank #56
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameAJC
StatusClosed
Assigned Toteam
Target Date
Closed Date09 Sep 2026
Observation Summary

At tank #56, during the crane operation, the fitter team was observed moving under the suspended load within the barricaded area.

Action Taken / Required

N/A