Observation Details
Date15 Apr 2026
CategoryProcedure
FacilityKorangi Refinery
AreaTank Farm
Exact LocationAt Tank #11
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned Toteam
Target Date—
Closed Date05 Apr 2026
Observation Summary
At Tank #11, M/s ATL, a vacuum box test (VBT) was being conducted inside the tank while welding and grinding activities were carried out simultaneously.
Action Taken / Required
N/A
