Observation Details
Date17 Feb 2026
CategoryElectrical
FacilityKorangi Refinery
AreaPlant Area
Exact LocationControl Room
DepartmentElectrical
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameSmart Climate
StatusClosed
Assigned Toteam
Target Date—
Closed Date20 Feb 2026
Observation Summary
At Tank #11: During vacuum testiAt backside of control room: Battery operated device was in use without prior tagging/ inspection by Electrical Department. Additionally, battery operated equipment was not ticked on the equipment to be used in hot work permit.
ng at the tank bottom, two workers were not using rubber gloves.
Action Taken / Required
N/A
