arrow_back Back
Date11 Feb 2026
CategoryEquipment
FacilityKorangi Refinery
AreaTank Farm
Exact LocationAt Laydown Area
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameUE
StatusClosed
Assigned Toteam
Target Date
Closed Date20 Feb 2026
Observation Summary

At laydown area: The grinder was found in an energized condition, and an M/s UE worker had removed the used disc without isolating the power source. Additionally, no grinder stand was available.

Action Taken / Required

N/A