arrow_back Back
Date29 Jan 2026
CategoryElectrical
FacilityKemari Terminal
AreaTank Farm
Exact LocationTank # 56
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameAJC
StatusClosed
Assigned Toteam
Target Date
Closed Date05 Feb 2026
Observation Summary

Tank #56: It was observed that the live main DB and welding machine were inadequately covered with a poly sheet, posing an electrical safety hazard.

Action Taken / Required

N/A