arrow_back Back
Date22 Aug 2025
CategorySlip/Trip/Fall
FacilityKorangi Refinery
AreaPlant Area
Exact LocationAt Pump Corridor
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameDEL
StatusClosed
Assigned Toteam
Target Date
Closed Date23 Aug 2025
Observation Summary

At pump corridor and in front of 104-C spool pipes was observed on the floor without barrication.