arrow_back Back
Date16 Jan 2026
CategoryWork at Height
FacilityKemari Terminal
AreaKT
Exact LocationTank #62
DepartmentCivil
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameAKS
StatusClosed
Assigned Toteam
Target Date
Closed Date18 Jan 2026
Observation Summary

At tank # 62, reflective tape was missing on scaffolding installed along the roadside, posing a risk of vehicle colliding with the scaffolding (AKS).