arrow_back Back
Date12 Dec 2025
CategoryProcedure
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #11
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned To
Target Date
Closed Date19 Jul 2026
Observation Summary

At Tank #11, no operator was present while the generator was in use at the ATL office (25 kV). The HSE Supervisor was informed.