arrow_back Back
Date21 Sep 2025
CategoryElectrical
FacilityKorangi Refinery
AreaKOR Refinery
Exact LocationTank #05
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned Toteam
Target Date
Closed Date19 Jul 2026
Observation Summary

At tank # 05, after replacement of the breaker and switch in the generator , the electrical tag was not re-tagged. Informed to HSE supervisor.