arrow_back Back
Date17 Oct 2025
CategoryPPE
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #11
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned Toteam
Target Date
Closed Date05 Apr 2026
Observation Summary

At tank #11,the portable air compressor was connected with an electrical plug while activity was stopped. Informed to HSE supervisor and immediately disconnect plug.

Action Taken / Required

N/A