arrow_back Back
Date21 Aug 2025
CategoryProcedure
FacilityKorangi Refinery
AreaPlant Area
Exact LocationAt Multiple Locations
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameDEL
StatusClosed
Assigned To
Target Date
Closed Date22 Aug 2025
Observation Summary

At multiple locations (Heat exchanger area, near Stationary caravan, pump corridor area and AFC), loose material (nut/bolts, exchanger covers) was found without barrication .