arrow_back Back
Date10 Apr 2026
CategoryFire
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #30
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameDEL
StatusClosed
Assigned Toteam
Target Date
Closed Date09 Sep 2026
Observation Summary

At Tank #30, the main electrical distribution board (DB) was covered with polythene.

Action Taken / Required

N/A