Observation Details
Date21 Aug 2025
CategoryWork at Height
FacilityKorangi Refinery
AreaPlant Area
Exact LocationHydro Air Coolers Area
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameDEL
StatusClosed
Assigned To—
Target Date—
Closed Date09 Jul 2026
Observation Summary
At the hydro air coolers, a pulley was being used for a lifting activity, however it was installed at the edge of a single, open-ended scaffolding pipe, posing a risk of slippage. Additionally, poor housekeeping was observed on the platform.
