arrow_back Back
Date20 Aug 2025
CategoryPPE
FacilityKorangi Refinery
AreaPlant Area
Exact LocationAt the Caustic Yard
DepartmentOperation
CompanyPRL
Routine / ShutdownShutdown
StatusClosed
Assigned To
Target Date
Closed Date09 Jul 2026
Observation Summary

At the caustic yard, leakage of caustic was observed from the housing of pump 101-JA. The stationary team applied a spade on the line, but leakage has not stopped. Control Room has been informed. (Open)