arrow_back Back
Date20 Aug 2025
CategoryEnvironment
FacilityKorangi Refinery
AreaPlant Area
Exact LocationAt the Pump Corridor
DepartmentOperation
CompanyPRL
Routine / ShutdownShutdown
StatusClosed
Assigned To
Target Date
Closed Date20 Aug 2025
Observation Summary

At the pump corridor, the operations team was transferring a Perchloroethylene drum by rolling it on the floor. Counseled the team.