Date20 Aug 2025
CategoryProcedure
FacilityKorangi Refinery
AreaPlant Area
Exact LocationAt 301-CN
DepartmentOperation
CompanyPRL
Routine / ShutdownShutdown
StatusClosed
Assigned To
Target Date
Closed Date20 Aug 2025
Observation Summary

At 301-CN, operations team taking drain hose pipe upside with help of rope however on connection of hose pipe its metal coupling bolts were missing. Immediately action was taken by ops team and resolve the obs. (closed)