Observation Details
Date20 Aug 2025
CategoryProcedure
FacilityKorangi Refinery
AreaPlant Area
Exact LocationPlant Area
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameDEL
StatusClosed
Assigned To—
Target Date—
Closed Date21 Aug 2025
Observation Summary
After lunch at the site, the DEL HSE representative was not available. Later, their HSE lead instructed the team to be present at the site for supervision.
