arrow_back Back
Date17 Aug 2025
CategoryWork at Height
FacilityKorangi Refinery
AreaPlant Area
Exact LocationAt 105-C3
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameDEL
StatusClosed
Assigned To
Target Date
Closed Date18 Aug 2025
Observation Summary

At 105-C3, during lifting the material at height by UE team the area was not barricaded, and poor housekeeping was observed. Counseled the team and instructed to barricade the area.