arrow_back Back
Date17 Mar 2026
CategoryProcedure
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #11
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned Toteam
Target Date
Closed Date25 Mar 2026
Observation Summary

At Tank #11, (M/S ATL),  an excavation area was observed without proper barricading.

Action Taken / Required

N/A