Observation Details
Date05 Aug 2025
CategoryPPE
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTt Tank #05
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameATL
StatusClosed
Assigned To—
Target Date—
Closed Date05 Aug 2025
Observation Summary
Tt tank #05, C-channel was observed being lifted with a rope and gripped incorrectly, instructed to use proper lifting methods and correct grip point"
