Observation Details
Date08 Aug 2025
CategoryProcedure
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #05
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameATL
StatusClosed
Assigned ToAhsan
Target Date—
Closed Date09 Aug 2025
Observation Summary
At tank#05, during the lifting operation, one rigger was holding the suspended load by hand, informed rigging supervisor and Instruct riggers to use tag lines and avoid holding suspended loads by hand during lifting operations