Observation Details
Date20 Sep 2025
CategoryElectrical
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #05
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned To—
Target Date—
Closed Date21 Sep 2025
Observation Summary
At tank # 05, after replacement of the breaker and switch in the generator , the electrical tag was not re-tagged. Informed to HSE supervisor.
