arrow_back Back
Date23 Sep 2025
CategoryEquipment
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #05
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned To
Target Date
Closed Date11 Jul 2026
Observation Summary

At tank#05, during hot work , the Electrical D.B was tripping repeatedly, after inspection, it was found that the electrodes were shorting, which caused the tripping. Informed to HSE supervisor.