arrow_back Back
Date15 Oct 2025
CategoryLack of Supervision
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #11
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned Toteam
Target Date
Closed Date05 Apr 2026
Observation Summary

At Tank #11, during the pre-operation visual inspection, a damaged tire was observed on the crane. The HSE Supervisor was informed.

Action Taken / Required

N/A