Observation Details
Date17 Oct 2025
CategoryVehicle
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #11
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned Toteam
Target Date—
Closed Date05 Apr 2026
Observation Summary
At tank#11, an electrode box was lying on the scaffolding platform ,creating risk of falling. Informed to HSE supervisor and the electrode box was immediately removed.
Action Taken / Required
N/A
