arrow_back Back
Date17 Oct 2025
CategoryVehicle
FacilityKorangi Refinery
AreaTank Farm
Exact LocationTank #11
DepartmentConstruction
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameATL
StatusClosed
Assigned Toteam
Target Date
Closed Date05 Apr 2026
Observation Summary

At tank#11, an electrode box was lying on the scaffolding platform ,creating risk of falling. Informed to HSE supervisor and the electrode box was immediately removed.

Action Taken / Required

N/A