arrow_back Back
Date15 Apr 2026
CategoryProcedure
FacilityKemari Terminal
AreaKT
Exact LocationTank #56
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameAJC
StatusClosed
Assigned Toteam
Target Date
Closed Date05 Apr 2026
Observation Summary

An engine oil leak was observed on the 100 kVA generator operated by M/s AJC. Furthermore, no drip tray was provided to contain the spill.

Action Taken / Required

N/A