arrow_back Back
Date15 Apr 2026
CategoryWork at Height
FacilityKemari Terminal
AreaKT
Exact LocationTank #56
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameAJC
StatusClosed
Assigned Toteam
Target Date
Closed Date05 Apr 2026
Observation Summary

At tank 56, a welding electrode desiccator and a water bottle were observed being lifted using only a rope, without a tool bag.

Action Taken / Required

N/A