arrow_back Back
Date26 Aug 2025
CategoryProcedure
FacilityKorangi Refinery
AreaPlant Area
Exact LocationAt Multiple Locations
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameDEL
StatusClosed
Assigned Toteam
Target Date
Closed Date27 Aug 2025
Observation Summary

At multiple locations (below area of AFC, heat exchanger and crude pump) loose materials (pipes, nut/ bolts, spool pieces, exchanger head, gasket, valves) were observed on the walkway without barrication.