arrow_back Back
Date26 Aug 2025
CategoryProcedure
FacilityKorangi Refinery
AreaCrude Pump Area
Exact LocationCrude Pump Area
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownShutdown
Contractor NameDEL
StatusClosed
Assigned Toteam
Target Date
Closed Date28 Aug 2025
Observation Summary

At crude pump area, metallic ramp was observed on the walkway without barrication.