Observation Details
Date24 Jun 2026
CategoryProcedure
FacilityKorangi Refinery
AreaKOR Refinery
Exact LocationTank #25
DepartmentStationary
CompanyCONTRACTOR
Routine / ShutdownRoutine
Contractor NameRE
StatusOpen
Assigned Toteam
Target Date—
Closed Date—
Observation Summary
At Tank 25 Yard: Substandard pipe supports (wooden pieces) were being used to support the newly installed pipeline. Additionally, no proper walkway or crossover arrangement was provided for safe access across the pipeline.
Action Taken / Required
N/A
