Safety Observations — All Years

1473
Total
2
Open
1471
Closed
Open: 2, Closed: 1471.
Open Closed
Unsafe Act: 609, Unsafe Condition: 864, Near Miss: 0, Positive: 0.
Unsafe Act Unsafe Cond.
Procedure: 424. PPE: 232. Work at Height: 204. Electrical: 118. Housekeeping: 113. Lack of Supervision: 95. Equipment: 70. Slip/Trip/Fall: 53. Environment: 42. Line of Fire: 42. Vehicle: 36. Falling Object: 35. PTW: 6. Health: 2. Ergonomics: 1.
PRL: 121, Contractor: 1352.
PRL Contractor

By Department

Construction: 843. Stationary: 442. Civil: 129. Electrical: 17. Logistic: 15. Operation: 9. OM KT: 7. A&S: 4. Rotary: 3. Tank Farm: 2.

By Contractor

DEL: 442. ATL: 366. IIW: 219. AJC: 188. UE: 29. RE: 24. AKS: 19. WMS: 11. Afzal: 9. OMC: 9.

Monthly Trend

Jul 2025: 60. Aug 2025: 309. Sep 2025: 103. Oct 2025: 86. Nov 2025: 77. Dec 2025: 71. Jan 2026: 128. Feb 2026: 94. Mar 2026: 124. Apr 2026: 213. May 2026: 71. Jun 2026: 128. Jul 2026: 9.
Observations List 1473 records
No Date Type Department Description Assigned To Status Closed Date Actions
653 11 Dec 2025 Unsafe Act Construction At Tank #11, workers inside the tank were using black goggle … Closed 19 Jul 2026
652 09 Dec 2025 Unsafe Condition Civil At gantry sub-station, M/s QK Builders workers were found wo … Closed 19 Jul 2026
651 09 Dec 2025 Unsafe Condition Civil Near the gantry sub-station, construction materials (cement … Closed 19 Jul 2026
650 09 Dec 2025 Unsafe Act Construction At Tank #11, a tool used for reinforcement was found with a … Closed 19 Jul 2026
649 09 Dec 2025 Unsafe Act Construction Oil leakage was observed from M/s ATL’s generator, which is … Closed 19 Jul 2026
648 09 Dec 2025 Unsafe Act Construction At outside area of tank #5. Leftover material needs to be re … Closed 19 Jul 2026
647 09 Dec 2025 Unsafe Act Construction At Tank #11, M/s ATL worker was found walking on scaffolding … Closed 19 Jul 2026
646 09 Dec 2025 Unsafe Act Construction At Tank #11, parallel activities (fabrication work) were obs … Closed 19 Jul 2026
645 09 Dec 2025 Unsafe Act Construction At Tank #11, a grinder stand was available. However, the gri … Closed 19 Jul 2026
644 05 Dec 2025 Unsafe Condition Civil At backside of lab, cylinder trolley was placed on walkway, … Closed 19 Jul 2026
643 04 Dec 2025 Unsafe Act Construction At Tank #11, parallel activities (grinding work) were observ … Closed 19 Jul 2026
642 04 Dec 2025 Unsafe Act Construction At Tank #11, parallel activities (grinding work) were observ … Closed 19 Jul 2026
641 04 Dec 2025 Unsafe Condition Construction At Tank #11, parallel activities (grinding work) were observ … Closed 19 Jul 2026
640 04 Dec 2025 Unsafe Condition Construction At Tank #11, parallel activities (grinding work) were observ … Closed 19 Jul 2026
639 04 Dec 2025 Unsafe Condition Construction At Tank #11, parallel activities (grinding work) were observ … Closed 19 Jul 2026
638 03 Dec 2025 Unsafe Condition Construction At Tank #11, no rest shed was available. team Closed 09 Sep 2026
637 01 Dec 2025 Unsafe Condition Construction At Tank #11, operating lever of M/s ATL fire extinguisher wa … Closed 24 Jun 2026
636 01 Dec 2025 Unsafe Condition Construction At Tank #11, loose materials were found on walkway without b … team Closed 09 Sep 2026
635 30 Nov 2025 Unsafe Act Stationary hydrant # B-10, tank # 55 yard, minor seepage in foam line T … Closed 20 Jul 2026
634 30 Nov 2025 Unsafe Act Civil Wild bushes need to be remove in tank # 54, 55, 58, & 57 … Closed 20 Jul 2026