Safety Observations — All Years

1483
Total
9
Open
1474
Closed
Open: 9, Closed: 1474.
Open Closed
Unsafe Act: 609, Unsafe Condition: 874, Near Miss: 0, Positive: 0.
Unsafe Act Unsafe Cond.
PPE: 271. Work at Height: 208. Housekeeping: 149. Lack of Supervision: 144. Slip/Trip/Fall: 124. Electrical: 121. Equipment: 91. Procedure: 88. Line of Fire: 63. Falling Object: 52. Vehicle: 52. Environment: 44. Fire: 21. Health: 17. Emergency Response: 17. PTW: 12. SIMOP: 5. Pressure: 3. Ergonomics: 1.
PRL: 112, Contractor: 1371.
PRL Contractor

By Department

Construction: 835. Stationary: 475. Civil: 119. Logistic: 13. Electrical: 12. Operation: 7. OM KT: 6. A&S: 4. Rotary: 3. Tank Farm: 2.

By Contractor

DEL: 459. ATL: 337. IIW: 234. AJC: 202. UE: 31. RE: 25. AKS: 15. SWIFT: 14. WMS: 10. Afzal: 9.

Monthly Trend

Jul 2025: 61. Aug 2025: 304. Sep 2025: 77. Oct 2025: 74. Nov 2025: 81. Dec 2025: 74. Jan 2026: 116. Feb 2026: 93. Mar 2026: 97. Apr 2026: 207. May 2026: 70. Jun 2026: 107. Jul 2026: 120. Aug 2026: 2.
Observations List 1483 records
No Date Type Department Description Assigned To Status Closed Date Actions
543 14 Nov 2025 Unsafe Act Construction At tank #11, the fan installed in the ventilation system was … team Closed 09 Sep 2026
542 14 Nov 2025 Unsafe Act Construction At tank # 11, during the safety round poor housekeeping was … team Closed 09 Sep 2026
541 14 Nov 2025 Unsafe Act Construction At tank # 05, A safety person and construction representativ … team Closed 09 Sep 2026
540 14 Nov 2025 Unsafe Act Electrical At tank #11, ATL worker not wearing a safety goggle at workp … Closed 24 Jun 2026
539 14 Nov 2025 Unsafe Act Construction At tank # 05, ATL worker was not wearing safety gloves while … team Closed 09 Sep 2026
538 13 Nov 2025 Unsafe Act Construction At tank # 05, SGS inspector found wearing low ankle shoes in … Closed 13 Jul 2026
537 13 Nov 2025 Unsafe Condition Construction At tank #11, during welding work, the male and female joints … team Closed 09 Sep 2026
536 13 Nov 2025 Unsafe Act Construction At tank #11, mechanical work at height started without HSE p … Closed 13 Jul 2026
535 13 Nov 2025 Unsafe Condition Construction At tank #11,during the welding work found the welding cable … team Closed 09 Sep 2026
534 13 Nov 2025 Unsafe Act Construction At tank # 05, SGS inspectors entered the confined space for … Closed 13 Jul 2026
533 12 Nov 2025 Unsafe Condition Construction At road 6, the manifolds of tanks 15, 18, 19, 22 and 23 are … team Closed 09 Sep 2026
532 10 Nov 2025 Unsafe Condition Construction At Tank #05, the mesh in front of the ventilation fan was da … team Closed 09 Sep 2026
531 10 Nov 2025 Unsafe Condition Construction At tank #05,sacaffolding material is scattered ,not barricad … team Closed 09 Sep 2026
530 10 Nov 2025 Unsafe Condition Construction At tank #05,the workers removing water from the confined spa … team Closed 09 Sep 2026
529 10 Nov 2025 Unsafe Condition Construction At tank #05, scaffolding was installed for lifting and holdi … Closed 24 Jun 2026
528 10 Nov 2025 Unsafe Condition Construction At tank#05,The ATL crane performed a lifting operation ,but … Closed 24 Jun 2026
527 10 Nov 2025 Unsafe Act Construction At tank#11, ATL workers during tank inside grinder machine u … Closed 24 Jun 2026
526 07 Nov 2025 Unsafe Act Construction At Tank #11, parallel activities were observed during the wi … Closed 13 Jul 2026
525 07 Nov 2025 Unsafe Condition Construction At boiler # 01,during the confined space tube replacement jo … Closed 24 Jun 2026
524 07 Nov 2025 Unsafe Condition Stationary At Boiler #01, the ventilation system was initially unavaila … Closed 24 Jun 2026