Safety Observations — All Years

1473
Total
2
Open
1471
Closed
Open: 2, Closed: 1471.
Open Closed
Unsafe Act: 609, Unsafe Condition: 864, Near Miss: 0, Positive: 0.
Unsafe Act Unsafe Cond.
Procedure: 424. PPE: 232. Work at Height: 204. Electrical: 118. Housekeeping: 113. Lack of Supervision: 95. Equipment: 70. Slip/Trip/Fall: 53. Environment: 42. Line of Fire: 42. Vehicle: 36. Falling Object: 35. PTW: 6. Health: 2. Ergonomics: 1.
PRL: 121, Contractor: 1352.
PRL Contractor

By Department

Construction: 843. Stationary: 442. Civil: 129. Electrical: 17. Logistic: 15. Operation: 9. OM KT: 7. A&S: 4. Rotary: 3. Tank Farm: 2.

By Contractor

DEL: 442. ATL: 366. IIW: 219. AJC: 188. UE: 29. RE: 24. AKS: 19. WMS: 11. Afzal: 9. OMC: 9.

Monthly Trend

Jul 2025: 60. Aug 2025: 309. Sep 2025: 103. Oct 2025: 86. Nov 2025: 77. Dec 2025: 71. Jan 2026: 128. Feb 2026: 94. Mar 2026: 124. Apr 2026: 213. May 2026: 71. Jun 2026: 128. Jul 2026: 9.
Observations List 1473 records
No Date Type Department Description Assigned To Status Closed Date Actions
513 28 Oct 2025 Unsafe Condition Construction At tank#05, during safety round different loose materials we … team Closed 05 Apr 2026
512 28 Oct 2025 Unsafe Condition Construction At tank #11,during the safety round, one 3-phase female sock … team Closed 05 Apr 2026
511 28 Oct 2025 Unsafe Act Construction At tank #11,during the material shifting one fitter was lift … team Closed 05 Apr 2026
510 28 Oct 2025 Unsafe Condition Construction At temporary M/s DEL fabrication yard, poor housekeeping was … team Closed 05 Apr 2026
509 22 Oct 2025 Unsafe Condition Civil At multiple locations (Near Kachra Kundi Road 4, access to t … team Closed 05 Apr 2026
508 22 Oct 2025 Unsafe Condition Logistic At tank #05,different types of materials were lying scattere … team Closed 05 Apr 2026
507 22 Oct 2025 Unsafe Condition Construction At tank#11,the Air compressor tire was sent yesterday for pu … team Closed 05 Apr 2026
506 22 Oct 2025 Unsafe Condition Construction At tank#05 , during the fabrication work the crude line spoo … team Closed 05 Apr 2026
505 22 Oct 2025 Unsafe Act Construction At ATL yard during MS plate shifting and cleaning 1 worker n … team Closed 05 Apr 2026
504 21 Oct 2025 Unsafe Act Construction At tank#15, during the hot work activities found the fire Ex … team Closed 05 Apr 2026
503 21 Oct 2025 Unsafe Condition Construction At tank#05, during grinding work, no support was provided to … team Closed 05 Apr 2026
502 21 Oct 2025 Unsafe Act Construction At tank #11, an ATL staff member was observed working on a h … team Closed 05 Apr 2026
501 21 Oct 2025 Unsafe Condition Construction At tank#15, during the hot work activities found the fire Ex … team Closed 05 Apr 2026
500 17 Oct 2025 Unsafe Condition Construction At tank #11,during sand blasting activities, workers were no … team Closed 05 Apr 2026
499 17 Oct 2025 Unsafe Condition Construction At tank #11,the portable air compressor was connected with a … team Closed 05 Apr 2026
498 17 Oct 2025 Unsafe Condition Construction At tank#11, an electrode box was lying on the scaffolding pl … team Closed 05 Apr 2026
497 15 Oct 2025 Unsafe Act Construction At tank #11,the portable air compressor was connected with a … team Closed 07 Sep 2026
496 15 Oct 2025 Unsafe Act Construction At tank #11,the portable air compressor was connected with a … team Closed 07 Sep 2026
495 15 Oct 2025 Unsafe Act Construction At tank #11,during sand blasting activities, workers were no … team Closed 05 Apr 2026
494 15 Oct 2025 Unsafe Act Construction At tank #11,during sand blasting activities, workers were no … team Closed 05 Apr 2026