1473
Total
2
Open
1471
Closed
Open: 2, Closed: 1471.
Open Closed
Unsafe Act: 609, Unsafe Condition: 864, Near Miss: 0, Positive: 0.
Unsafe Act Unsafe Cond.
Procedure: 424. PPE: 232. Work at Height: 204. Electrical: 118. Housekeeping: 113. Lack of Supervision: 95. Equipment: 70. Slip/Trip/Fall: 53. Environment: 42. Line of Fire: 42. Vehicle: 36. Falling Object: 35. PTW: 6. Health: 2. Ergonomics: 1.
PRL: 121, Contractor: 1352.
PRL Contractor

By Department

Construction: 843. Stationary: 442. Civil: 129. Electrical: 17. Logistic: 15. Operation: 9. OM KT: 7. A&S: 4. Rotary: 3. Tank Farm: 2.

By Contractor

DEL: 442. ATL: 366. IIW: 219. AJC: 188. UE: 29. RE: 24. AKS: 19. WMS: 11. Afzal: 9. OMC: 9.

Monthly Trend

Jul 2025: 60. Aug 2025: 309. Sep 2025: 103. Oct 2025: 86. Nov 2025: 77. Dec 2025: 71. Jan 2026: 128. Feb 2026: 94. Mar 2026: 124. Apr 2026: 213. May 2026: 71. Jun 2026: 128. Jul 2026: 9.
Observations List 1473 records
No Date Type Department Description Assigned To Status Closed Date Actions
93 08 Aug 2025 Unsafe Act Stationary At tank#05, during the lifting operation, one rigger was hol … Ahsan Closed 09 Aug 2025
92 08 Aug 2025 Unsafe Condition Stationary Tank # 56 100kva diesel generator during operation radiator … Closed 09 Aug 2025
91 08 Aug 2025 Unsafe Condition Logistic At road #0, a PSO oil tanker, which arrived for fuel filling … Closed 09 Aug 2025
90 08 Aug 2025 Unsafe Condition Stationary Electrical extension board # 13 damaged receptacle was repla … Closed 09 Aug 2025
89 08 Aug 2025 Unsafe Act Stationary During grinding works a fitter was observed having covered h … Closed 09 Aug 2025
88 08 Aug 2025 Unsafe Act Stationary 3 person of civil worker folding was erecting roof top of of … team Closed 10 Aug 2025
87 07 Aug 2025 Unsafe Act Tank Farm A product line running from Tank 38 to Tank 01 had leakage f … team Closed 08 Jul 2025
86 07 Aug 2025 Unsafe Act Stationary The safety shoes of 3 AJC workers were found damaged. Immedi … team Closed 09 Aug 2025
85 07 Aug 2025 Unsafe Act Construction At road no#16 ,a worker was using a mobile phone, inform to … team Closed 09 Aug 2025
84 07 Aug 2025 Unsafe Condition Construction At tank#05, main entrance door was blocked, informed to HSE … team Closed 08 Jul 2025
83 07 Aug 2025 Unsafe Act Construction At tank#05, during sandblasting activity, the required safe … team Closed 08 Jul 2025
82 05 Aug 2025 Unsafe Act Construction At tank #05, during mechanical work on shell no.2, a scaffol … Closed 06 Aug 2025
81 05 Aug 2025 Unsafe Act Construction At Tank #11, two fire extinguishers of ATL had not been insp … Closed 06 Aug 2025
80 05 Aug 2025 Unsafe Act Construction Tt tank #05, C-channel was observed being lifted with a rope … Closed 05 Aug 2025
79 05 Aug 2025 Unsafe Act Construction At Tank #11, a worker was hammering without using a tool tie … Closed 05 Aug 2025
78 05 Aug 2025 Unsafe Act Construction At Tank #05, two workers were wearing damaged coveralls. Inf … team Closed 05 Aug 2025
77 04 Aug 2025 Unsafe Act Construction At Tank #05, a rigger was observed not wearing gloves during … Closed 05 Aug 2025
76 04 Aug 2025 Unsafe Act Construction At tank #05, ATL electrician was on leave, and in his absenc … Closed 05 Aug 2025
75 04 Aug 2025 Unsafe Act Construction At tank #05, During the vacuum test on Tank No. 05 Today, th … Closed 05 Aug 2025
74 04 Aug 2025 Unsafe Act Construction At tank #05, During the dismantling of scaffolding inside Ta … Closed 05 Aug 2025