| 103 |
09 Aug 2025 |
Unsafe Act |
Stationary |
Welding Supervisor Changed The Grinder Disc Without Disconne … |
— |
Closed |
10 Aug 2025 |
|
| 102 |
08 Aug 2025 |
Unsafe Act |
Construction |
At tank#05, a worker was observed inside the tank during san … |
team |
Closed |
10 Aug 2025 |
|
| 101 |
08 Aug 2025 |
Unsafe Condition |
Construction |
At tank#11, for the MS plate fit-up, wedge, U-clamps, and ji … |
— |
Closed |
09 Aug 2025 |
|
| 100 |
08 Aug 2025 |
Unsafe Act |
Construction |
At tank#11, one worker was working at height without clippin … |
— |
Closed |
10 Aug 2025 |
|
| 99 |
08 Aug 2025 |
Unsafe Condition |
Construction |
At road no#12, at sprinkle lines wall one cement block was … |
— |
Closed |
09 Aug 2025 |
|
| 98 |
08 Aug 2025 |
Unsafe Condition |
Construction |
At tank#05, three air compressors were being used for sand b … |
— |
Closed |
09 Aug 2025 |
|
| 97 |
08 Aug 2025 |
Unsafe Condition |
Stationary |
At tank#05, the distance between the three blasters during b … |
team |
Closed |
10 Aug 2025 |
|
| 96 |
08 Aug 2025 |
Unsafe Act |
Stationary |
At tank#05, during the lifting operation, one rigger was hol … |
team |
Closed |
09 Aug 2025 |
|
| 95 |
08 Aug 2025 |
Unsafe Condition |
Stationary |
Tank # 56 100kva diesel generator during operation radiator … |
— |
Closed |
09 Aug 2025 |
|
| 94 |
08 Aug 2025 |
Unsafe Condition |
Logistic |
At road #0, a PSO oil tanker, which arrived for fuel filling … |
team |
Closed |
09 Aug 2025 |
|
| 93 |
08 Aug 2025 |
Unsafe Condition |
Stationary |
Electrical extension board # 13 damaged receptacle was repla … |
— |
Closed |
09 Aug 2025 |
|
| 92 |
08 Aug 2025 |
Unsafe Act |
Stationary |
During grinding works a fitter was observed having covered h … |
— |
Closed |
09 Aug 2025 |
|
| 91 |
08 Aug 2025 |
Unsafe Act |
Stationary |
3 person of civil worker folding was erecting roof top of of … |
team |
Closed |
10 Aug 2025 |
|
| 90 |
07 Aug 2025 |
Unsafe Act |
Stationary |
The safety shoes of 3 AJC workers were found damaged. Immedi … |
team |
Closed |
09 Aug 2025 |
|
| 89 |
07 Aug 2025 |
Unsafe Act |
Stationary |
During crane operation rigger was not use tag line. Counseli … |
team |
Closed |
09 Aug 2025 |
|
| 88 |
07 Aug 2025 |
Unsafe Condition |
Tank Farm |
A product line running from Tank 38 to Tank 01 had leakage f … |
team |
Closed |
08 Aug 2025 |
|
| 87 |
07 Aug 2025 |
Unsafe Condition |
Construction |
At tank#05, main entrance door was blocked, informed to HSE … |
team |
Closed |
08 Jul 2025 |
|
| 86 |
07 Aug 2025 |
Unsafe Act |
Construction |
At tank#05, during sandblasting activity, the required safe … |
team |
Closed |
08 Jul 2025 |
|
| 85 |
07 Aug 2025 |
Unsafe Act |
Stationary |
At road no#16 ,a worker was using a mobile phone, inform to … |
team |
Closed |
18 Aug 2025 |
|
| 84 |
05 Aug 2025 |
Unsafe Act |
Construction |
At tank #05, during mechanical work on shell no.2, a scaffol … |
— |
Closed |
06 Aug 2025 |
|