Safety Observations — All Years

1483
Total
9
Open
1474
Closed
Open: 9, Closed: 1474.
Open Closed
Unsafe Act: 609, Unsafe Condition: 874, Near Miss: 0, Positive: 0.
Unsafe Act Unsafe Cond.
PPE: 271. Work at Height: 208. Housekeeping: 149. Lack of Supervision: 144. Slip/Trip/Fall: 124. Electrical: 121. Equipment: 91. Procedure: 88. Line of Fire: 63. Vehicle: 52. Falling Object: 52. Environment: 44. Fire: 21. Health: 17. Emergency Response: 17. PTW: 12. SIMOP: 5. Pressure: 3. Ergonomics: 1.
PRL: 112, Contractor: 1371.
PRL Contractor

By Department

Construction: 835. Stationary: 475. Civil: 119. Logistic: 13. Electrical: 12. Operation: 7. OM KT: 6. A&S: 4. Rotary: 3. Warehouse: 2.

By Contractor

DEL: 459. ATL: 337. IIW: 234. AJC: 202. UE: 31. RE: 25. AKS: 15. SWIFT: 14. WMS: 10. Afzal: 9.

Monthly Trend

Jul 2025: 61. Aug 2025: 304. Sep 2025: 77. Oct 2025: 74. Nov 2025: 81. Dec 2025: 74. Jan 2026: 116. Feb 2026: 93. Mar 2026: 97. Apr 2026: 207. May 2026: 70. Jun 2026: 107. Jul 2026: 120. Aug 2026: 2.
Observations List 1483 records
No Date Type Department Description Assigned To Status Closed Date Actions
83 05 Aug 2025 Unsafe Act Construction At Tank #11, two fire extinguishers of ATL had not been insp … Closed 06 Aug 2025
82 05 Aug 2025 Unsafe Act Construction Tt tank #05, C-channel was observed being lifted with a rope … Closed 05 Aug 2025
81 05 Aug 2025 Unsafe Act Construction At Tank #11, a worker was hammering without using a tool tie … Closed 05 Aug 2025
80 05 Aug 2025 Unsafe Act Construction At Tank #05, two workers were wearing damaged coveralls. Inf … team Closed 05 Aug 2025
79 04 Aug 2025 Unsafe Act Construction At Tank #05, a rigger was observed not wearing gloves during … Closed 05 Aug 2025
78 04 Aug 2025 Unsafe Act Construction At tank #05, ATL electrician was on leave, and in his absenc … Closed 05 Aug 2025
77 04 Aug 2025 Unsafe Act Construction At tank #05, During the vacuum test on Tank No. 05 Today, th … Closed 05 Aug 2025
76 04 Aug 2025 Unsafe Act Construction At tank #05, During the dismantling of scaffolding inside Ta … Closed 05 Aug 2025
75 04 Aug 2025 Unsafe Condition Construction At tank #05, Grinder No. 32 (5-inch) suddenly stopped workin … Closed 05 Aug 2025
74 04 Aug 2025 Unsafe Act Construction At Tank #05, workers were not wearing N-95 masks during powe … Closed 05 Aug 2025
73 04 Aug 2025 Unsafe Condition Construction At Tank #05, Hot work canopy contained grass and combustible … Closed 05 Aug 2025
72 04 Aug 2025 Unsafe Condition Construction At tank #11, the 60 kVA generator at Tank No. 11 was repeate … Closed 05 Aug 2025
71 04 Aug 2025 Unsafe Condition Construction At Tank #05, two fabrication teams were performing parallel … team Closed 05 Aug 2025
70 04 Aug 2025 Unsafe Act Construction At Tank #05, a fitter was observed not wearing over-glasses … team Closed 05 Aug 2025
69 01 Aug 2025 Unsafe Condition Stationary At storm water pit, the regulator of gas cylinders were foun … Closed 02 Aug 2025
68 01 Aug 2025 Unsafe Act Construction At tank #05, M/S ATL worker was observed wearing damaged saf … Closed 02 Aug 2025
67 01 Aug 2025 Unsafe Condition Stationary At storm water pit, the generator tire was observed burst. I … Closed 02 Aug 2025
66 01 Aug 2025 Unsafe Condition Stationary At storm water pit, the trolley of the gas cutting set was o … Closed 02 Aug 2025
65 01 Aug 2025 Unsafe Condition Civil At road #07, cracks were observed on the steps of the walkwa … Closed 02 Aug 2025
64 01 Aug 2025 Unsafe Act Construction At tank #05, M/S ATL worker observed working without safety … Closed 02 Aug 2025