Safety Observations — All Years

1473
Total
2
Open
1471
Closed
Open: 2, Closed: 1471.
Open Closed
Unsafe Act: 609, Unsafe Condition: 864, Near Miss: 0, Positive: 0.
Unsafe Act Unsafe Cond.
Procedure: 424. PPE: 232. Work at Height: 204. Electrical: 118. Housekeeping: 113. Lack of Supervision: 95. Equipment: 70. Slip/Trip/Fall: 53. Line of Fire: 42. Environment: 42. Vehicle: 36. Falling Object: 35. PTW: 6. Health: 2. Ergonomics: 1.
PRL: 121, Contractor: 1352.
PRL Contractor

By Department

Construction: 843. Stationary: 442. Civil: 129. Electrical: 17. Logistic: 15. Operation: 9. OM KT: 7. A&S: 4. Rotary: 3. Tank Farm: 2.

By Contractor

DEL: 442. ATL: 366. IIW: 219. AJC: 188. UE: 29. RE: 24. AKS: 19. WMS: 11. Afzal: 9. OMC: 9.

Monthly Trend

Jul 2025: 60. Aug 2025: 309. Sep 2025: 103. Oct 2025: 86. Nov 2025: 77. Dec 2025: 71. Jan 2026: 128. Feb 2026: 94. Mar 2026: 124. Apr 2026: 213. May 2026: 71. Jun 2026: 128. Jul 2026: 9.
Observations List 1473 records
No Date Type Department Description Assigned To Status Closed Date Actions
433 19 Sep 2025 Unsafe Condition Construction At tank # 11,during the material shifting 02 nos ATL workers … team Closed 16 Sep 2025
432 19 Sep 2025 Unsafe Condition Construction At tank # 05, a worker during the grinding activity found wi … team Closed 16 Sep 2025
431 19 Sep 2025 Unsafe Condition Construction At tank # 05,(Mr. shahid Lodhi) during the visit found witho … team Closed 16 Sep 2025
430 19 Sep 2025 Unsafe Condition Civil Road-06 found depressed near tank-18. team Closed 17 Sep 2025
429 19 Sep 2025 Unsafe Condition Civil Top purer manifold found barricaded and blocked due to excav … team Closed 17 Sep 2025
428 18 Sep 2025 Unsafe Act Construction The handle of the CO2 fire Extinguisher was damaged placed n … Closed 19 Sep 2025
427 18 Sep 2025 Unsafe Act Construction At tank # 05,ATL fabricator was handling an MS plate ring on … Closed 19 Sep 2025
426 18 Sep 2025 Unsafe Act Construction At tank # 05,during the lifting operation ,the truck driver … Closed 19 Sep 2025
425 15 Sep 2025 Unsafe Condition Construction At tank#11, 2 ATL workers were found wearing black googles d … Closed 16 Sep 2025
424 15 Sep 2025 Unsafe Condition Construction At tank#05, 1 fitter was observed without safety gloves whil … Closed 16 Sep 2025
423 15 Sep 2025 Unsafe Condition Construction At tank#05, no mechanical work supervision from ATL was pres … Closed 16 Sep 2025
422 15 Sep 2025 Unsafe Condition Construction At tank#05, while installing the sprinkler line on the dome … Closed 16 Sep 2025
421 15 Sep 2025 Unsafe Act Construction At tank#05, on the dome roof ,a worker was pulling the sprin … Closed 16 Sep 2025
420 15 Sep 2025 Unsafe Condition Construction At tank#05, during crane operation, the mechanical team was … Closed 16 Sep 2025
419 14 Sep 2025 Unsafe Act Construction At tank # 05, some workers entered the tank whose names were … Closed 15 Sep 2025
418 14 Sep 2025 Unsafe Act Construction At tank # 05, Main Electrical DB was tripping repeatedly and … Closed 15 Sep 2025
417 14 Sep 2025 Unsafe Condition Construction At tank # 11, the HSE lead and HSE supervisor were not prese … Closed 15 Sep 2025
416 14 Sep 2025 Unsafe Condition Construction At tank # 05,the scaffolding team and fabrication team were … Closed 15 Sep 2025
415 14 Sep 2025 Unsafe Condition Construction At tank # 11 and at tank #05, two generators were used despi … Closed 14 Sep 2025
414 14 Sep 2025 Unsafe Act Construction At tank # 05 ,one fitter during the power brushing not weari … Closed 15 Sep 2025